Attachment 5 - B1655_RFI.pdf
PDF 51 KB Posted
- Attached to
- Repair/Renovate B1655 Federal contract opportunity
- Solicitation number
- FA667524R0004
About this file
This document is a Request for Information/Clarification (RFI) form for a federal contract opportunity. The RFI is related to Contract No. RFI Number, which involves the repair and renovation of Air Force Maintenance Low Observable (LO), Metals Tech, and Structures Shops Building #1655. The contractor is requesting information or clarification from the Contracting Officer on a specific drawing reference/detail. The contractor is asked to provide a proposed solution, if applicable. The form includes sections for the Government's RFI response and the contractor's review of the response to determine if a change order or cost increase will be required. The related federal contract opportunity is a pre-solicitation for the renovation of Building #1655, which will be released by the Department of the Air Force Reserve Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - B1655 Drawings - CUI.pdf | ||
| Attachment 3 - B1655 Submittal Register.xlsx | XLSX spreadsheet | |
| Attachment 2 - B1655 Specifications.pdf | ||
| Attachment 7 - B1655 Site Visit Sign-in Sheet .pdf | ||
| Attachment 4 - WD_TX20240270_04052024.pdf | ||
| Attachment 6 - Past Perf Questionnaire.docx | DOCX document | |
| Attachment 7 - B1655 Site Visit Sign-in Sheet .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR CONTRACTOR USE ONLY
CONTRACT NO: RFI NUMBER: DATE (MM/DD/YY)
SUBJECT: DRAWING REFERENCE / DETAIL:
ATTACHMENT SENT UNDER SEPARATE
COVER(__)
RESPONSE NEEDED BY:
REQUEST:
PROPOSED SOLUTION (If applicable):
TO(Contracting Officer): 301 CONF/PK FROM (Contractor):
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
REQUEST FOR INFORMATION / CLARIFICATION FORM
FOR GOVERNMENT USE ONLY
FROM CONTRACTING
TO:
For Evaluation and Action
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
RFI RESPONSE / CLARIFICATION (refer to page 2)
RFI RESPONSE / CLARIFICATION:-
Government to complete following sections:
TO:(AF Contracting Office)
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
TO:(Contractor)
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
CONTRACTOR REVIEW
After reviewing the Government response, does the contractor anticipate A change order will be required? YES NO There will be an increase in the cost of the project? YES NO
Reviewer:
DATE (MM/DD/YY) TYPE OR PRINT NAME AND TITLE SIGNATURE:
*Contractor- return reviewed form to Contracting Officer. Should the review results in YES for either of the two questions, if any further action is required by the contractor (i.e. submission of change proporsal), they will be notified by the contracting office.
| TOContractor: |
| Reviewer: |
| Text1: |
| Text2: 001 |
| Date3_af_date: |
| Text4: |
| Text5: |
| Check Box6: Off |
| Date7_af_date: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Date13_af_date: |
| Text14: |
| Text16: |
| Date17_af_date: |
| Text18: |
| Text20: |
| Date21_af_date: |
| Text22: |
| Date24_af_date: |
| Text25: |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Date31_af_date: |
| Text32: |
File details come from the government source that posted it. Updated .