Attachment 2 - B1655 Specifications.pdf
PDF 8 MB Posted
- Attached to
- Repair/Renovate B1655 Federal contract opportunity
- Solicitation number
- FA667524R0004
About this file
This document is the technical specifications for the renovation of Building #1655 at NAS JRB Fort Worth, Texas to accommodate Low Observable (LO), Metals Tech, and Structures Shops for F-35 fighter aircraft maintenance. The project includes demolition, construction, renovation, and incidental related work. Key requirements are divided into sections covering site work, concrete, masonry, metals, woods/plastics, thermal/moisture protection, openings, finishes, specialties, fire suppression, plumbing, HVAC, integrated automation, electrical, and communications systems. The project will be procured through a federal contract solicitation with a tentative release date. The Department of the Air Force Reserve Command is the federal agency managing this requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 - B1655 Site Visit Sign-in Sheet .pdf | ||
| Attachment 4 - WD_TX20240270_04052024.pdf | ||
| Attachment 6 - Past Perf Questionnaire.docx | DOCX document | |
| Attachment 1 - B1655 Drawings - CUI.pdf | ||
| Attachment 5 - B1655_RFI.pdf | ||
| Attachment 3 - B1655 Submittal Register.xlsx | XLSX spreadsheet | |
| Attachment 7 - B1655 Site Visit Sign-in Sheet .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFC Specifications DDPM 20-0031: Repair F-35 LO Shops, B1655
Architect-Engineer (A-E) services for maintenance and repair of B1655 to accommodate Low Observable (LO), Metals
Tech, and Structures Shops for F-35 fighter aircraft maintenance.
Solicitation No: FA667523F0003
Contract No.: FA664318D0009
NAS JRB Fort Worth, Texas
September 28, 2023
DDPM20- 0031_NAS JRB B1655 SPECI FI CATI ON - I SSUE FOR CONSTRUCTI ON
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK
01 30 00 11/ 20, CHG 2: 05/ 22 ADMI NI STRATI VE REQUI REMENTS
01 32 16. 00 2008/ 18, CHG 1: 08/ 20 SMALL PROJECT CONSTRUCTI ON PROGRESS
SCHEDULES
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
01 33 29 02/ 21 SUSTAI NABI LI TY REQUI REMENTS AND REPORTI NG
01 35 26 11/ 20, CHG 3: 02/ 22 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 10 2002/ 10, CHG 3: 02/ 21 QUALI TY CONTROL FOR MI NOR CONSTRUCTI ON
01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON
01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND
DI SPOSAL
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
01 78 23 08/ 15, CHG 2: 08/ 21 OPERATI ON AND MAI NTENANCE DATA
01 91 00. 15 1005/ 19, CHG 3: 05/ 22 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 08/ 22 DEMOLI TI ON
DI VI SI ON 03 - CONCRETE
03 30 53 05/ 14 MI SCELLANEOUS CAST- I N- PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 11/ 15, CHG 2: 05/ 19 UNI T MASONRY
DI VI SI ON 05 - METALS
05 05 20 05/ 22 POST- I NSTALLED CONCRETE AND MASONRY
ANCHORS
05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/ 16, CHG 2: 11/ 18 ROUGH CARPENTRY
06 41 16. 00 1008/ 10, CHG 1: 11/ 18 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL
CABI NETS
06 61 16 08/ 20 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 16 11/ 11, CHG 4: 08/ 18 MI NERAL FI BER BLANKET I NSULATI ON
07 22 00 02/ 16, CHG 3: 11/ 18 ROOF AND DECK I NSULATI ON
07 41 13 05/ 11, CHG 4: 02/ 21 METAL ROOF PANELS
07 42 63 05/ 11, CHG 4: 08/ 20 FABRI CATED WALL PANEL ASSEMBLI ES
07 60 00 05/ 17, CHG 2: 11/ 18 FLASHI NG AND SHEET METAL
07 84 00 05/ 10, CHG 1: 08/ 13 FI RESTOPPI NG
07 92 00 08/ 16, CHG 3: 11/ 18 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
PROJECT TABLE OF CONTENTS Page 1
08 11 13 08/ 20 STEEL DOORS AND FRAMES
08 31 00 05/ 17, CHG 1: 08/ 18 ACCESS DOORS AND PANELS
08 33 23 08/ 20, CHG 1: 02/ 22 OVERHEAD COI LI NG DOORS
08 51 13 05/ 19 ALUMI NUM WI NDOWS
08 71 00 02/ 16, CHG 4: 02/ 22 DOOR HARDWARE
08 81 00 05/ 19 GLAZI NG
08 91 00 08/ 20 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 06 00 08/ 22 SCHEDULES FOR FI NI SHES
09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD
09 30 10 08/ 20 CERAMI C, QUARRY, AND GLASS TI LI NG
09 51 00 08/ 20 ACOUSTI CAL CEI LI NGS
09 65 00 08/ 10, CHG 3: 08/ 18 RESI LI ENT FLOORI NG
09 67 23. 16 02/ 21 FUEL RESI STI VE RESI NOUS FLOORI NG, 5- COAT
SYSTEM
09 90 00 02/ 21 PAI NTS AND COATI NGS
09 96 00 11/ 14 HI GH- PERFORMANCE COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 20 08/ 20 I NTERI OR SI GNAGE
10 21 13 08/ 20 TOI LET COMPARTMENTS
10 22 13 08/ 16, CHG 1: 08/ 18 WI RE MESH PARTI TI ONS
10 26 00 08/ 20 WALL AND DOOR PROTECTI ON
10 28 13 08/ 20 TOI LET ACCESSORI ES
10 44 16 11/ 19 FI RE EXTI NGUI SHERS
10 51 13 05/ 11 METAL LOCKERS
DI VI SI ON 12 - FURNI SHI NGS
12 50 00. 13 1008/ 17, CHG 1: 11/ 18 FURNI TURE AND FURNI TURE I NSTALLATI ON
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 08/ 20 WET PI PE SPRI NKLER SYSTEMS, FI RE
PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE
22 15 14. 00 4011/ 17 GENERAL SERVI CE COMPRESSED- AI R SYSTEMS,
LOW PRESSURE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00. 00 2008/ 10, CHG 3: 08/ 18 BASI C MECHANI CAL MATERI ALS AND METHODS
23 05 15 05/ 22 COMMON PI PI NG FOR HVAC
23 05 48. 00 4005/ 22 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC
PI PI NG AND EQUI PMENT
23 05 93 11/ 15 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR
HVAC
23 07 00 02/ 13, CHG 7: 05/ 20 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 00 02/ 19, CHG 3: 05/ 21 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 11/ 15, CHG 2: 05/ 21 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR
HVAC
PROJECT TABLE OF CONTENTS Page 2
23 09 23. 02 02/ 19, CHG 1: 02/ 20 BACNET DI RECT DI GI TAL CONTROL FOR HVAC
AND OTHER BUI LDI NG CONTROL SYSTEMS
23 21 23 08/ 17 HYDRONI C PUMPS
23 23 00 08/ 21 REFRI GERANT PI PI NG
23 30 00 05/ 20, CHG 1: 02/ 22 HVAC AI R DI STRI BUTI ON
23 35 16. 17 1005/ 20 MECHANI CAL ENGI NE AND WELDI NG FUME
EXHAUST SYSTEMS
23 52 43. 00 2005/ 15, CHG 2: 08/ 18 LOW PRESSURE WATER HEATI NG BOI LERS
( UNDER 800, 000 BTU/ HR OUTPUT)
23 64 10 11/ 16, CHG 2: 08/ 18 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE
23 81 00 05/ 18, CHG 1: 02/ 21 DECENTRALI ZED UNI TARY HVAC EQUI PMENT
23 82 19. 00 4005/ 17 FAN COI L UNI TS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11. 00 05/ 21 CYBERSECURI TY FOR UTI LI TY MONI TORI NG AND
CONTROL SYSTEMS ( UMCS)
25 05 11. 01 05/ 21 CYBERSECURI TY FOR UTI LI TY METERI NG
CONTROL SYSTEMS ( UCS)
25 05 11. 02 05/ 21 CYBERSECURI TY FOR FI RE AND LI FE SAFETY
SYSTEMS ( FLS)
25 08 10 05/ 21 UTI LI TY MONI TORI NG AND CONTROL SYSTEM
TESTI NG
25 08 11. 00 2011/ 20 RI SK MANAGEMENT FRAMEWORK FOR
FACI LI TY- RELATED CONTROL SYSTEMS
25 10 10 02/ 19, CHG 1: 05/ 21 UTI LI TY MONI TORI NG AND CONTROL SYSTEM
( UMCS) FRONT END AND I NTEGRATI ON
DI VI SI ON 26 - ELECTRI CAL
26 05 00. 00 4011/ 20 COMMON WORK RESULTS FOR ELECTRI CAL
26 05 19. 00 1011/ 22 I NSULATED WI RE AND CABLE
26 05 26. 00 4008/ 19 GROUNDI NG AND BONDI NG FOR ELECTRI CAL
SYSTEMS
26 05 71. 00 4002/ 17 LOW VOLTAGE OVERCURRENT PROTECTI VE
DEVI CES
26 09 23. 00 4008/ 19 LI GHTI NG CONTROL DEVI CES
26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 16. 00 4008/ 19 PANELBOARDS
26 28 01. 00 1008/ 21 COORDI NATED POWER SYSTEM PROTECTI ON
26 29 23 02/ 20, CHG 1: 05/ 21 ADJUSTABLE SPEED DRI VE ( ASD) SYSTEMS
UNDER 600 VOLTS
26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 08/ 11 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG
SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 08/ 20 I NTERI OR FI RE ALARM AND MASS
NOTI FI CATI ON SYSTEM, ADDRESSABLE
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 3
DDPM20-0031_NAS JRB B1655 SPECIFICATIONS - 100% IFC Design
00 01 07 Page 1
00 01 07
SEALS AND SIGNATURES
Structural
David E Williams, PE
License No. 92557
The seal and signature to the left applies to the following Specifications divisions and sections of this project manual:
• 02 41 00
• 03 30 53
• 04 20 00
• 05 05 20
• 05 50 13
Architecture
You Zhou, RA
License No. 27673 divisions and sections of this project manual:
• 06 10 00
• 06 41 16.00 10
• 06 61 16
• 07 21 16
• 07 22 00
• 07 41 13
• 07 42 63
• 07 60 00
• 07 84 00
• 07 92 00
• 08 11 13
• 08 31 00
• 08 33 23
• 08 51 13
• 08 71 00
• 08 81 00
• 08 91 00
• 09 06 00
• 09 22 00
• 09 29 00
• 09 30 10
• 09 51 00
• 09 65 00
• 09 67 23.16
• 09 90 00
• 09 96 00
• 10 14 00.20
• 10 21 13
• 10 22 13
• 10 26 00
• 10 28 13
• 10 44 16
• 10 51 13
• 12 50 00.13 10
Fire Protection/Life Safety
Russell P Miller, PE
License No 139919
The seal and signature to the left applies to the following Specifications divisions and sections of this project manual:
• 10 44 16
• 21 13 13
• 28 31 76
Mechanical/Plumbing
Wade C Ross, PE
License No. 132016 divisions and sections of this project manual:
• 22 00 00
• 22 15 14.00 40
• 23 03 00.00 20
• 23 05 15
• 23 05 48.00 40
• 23 05 93
• 23 07 00
• 23 09 00
• 23 09 23.02
• 23 21 23
• 23 23 00
• 23 30 00
• 23 35 16.17 10
• 23 52 43.00 20
• 23 64 10
• 23 81 00
• 23 82 19.00 40
Electrical
Jeyeong Kim, PE
License No. 125443 divisions and sections of this project manual:
• 26 05 00.00 40
• 26 05 19.00 10
• 26 05 26.00 40
• 26 05 71.00 40
• 26 09 23.00 40
• 26 20 00
• 26 24 16.00 40
• 26 28 01.00.10
• 26 29 23
• 26 51 00
Telecommunications
David W Stephenson, RCDD
BICSI ID# 282708
divisions and sections of this project manual:
• 27 10 00
Engineer’s seal and signature does not apply to the documents that comprise Division 00, Bidding and Contracting Requirements.
It is a violation of applicable laws and regulations governing professional licensing and registration for any person, unless acting under the direction of the licensed and registered design professional(s) indicated above, to alter in any way the Specifications in this project manual.
END OF SEALS AND SIGNATURES
DDPM20- 0031_NAS JRB B1655 SPECI FI CATI ONS - I SSUE FOR CONSTRUCTI ON
THI S PAGE I NTENTI ONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 4
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.
Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
Thi s pr oj ect wi l l conver t t he B1655 Engi ne Shop space t o pr ovi de shop space f or LO, Met al s Tech, and St r uct ur es Shops. Desi gn f or addi t i onal sound at t enuat i on when r ef i ni shi ng ext er i or wal l s, r oof , and r oof openi ngs. Met al s Tech - r equi r ed t o host l ar ge f abr i cat i on equi pment , wel di ng boot h, Ger ber Room, document st or age, mat er i al st or age, and admi ni st r at i ve space. St r uct ur es Shop - s i mi l ar f unct i on and equi pment r equi r ement s as Met al s Tech. Low Obser vabl e ( LO) Shop - mai nt ai ns F- 35 st eal t h coat i ngs on par t s and equi pment by per f or mi ng r out i ne mai nt enance and r epai r s. The shop space r equi r es di r ect adj acency t o t he f aci l i t y r est r ooms and a l ocker r oom t o al l evi at e t he spr ead of any cont ami nant s t hr oughout t he f aci l i t y . Al so, i ncl uded ar e a c l ean par t s st or age ar ea, t r ai ni ng r oom, t ool cr i b, and par t s cage.
1. 2. 2 Locat i on
The wor k i s l ocat ed at t he NAS JRB For t Wor t h, Texas B1655, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 3 OCCUPANCY OF PREMI SES
Bui l di ng( s) wi l l be occupi ed dur i ng per f or mance of wor k under t hi s Cont r act .
Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.
1. 4 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat
SECTI ON 01 11 00 Page 1 whi ch exi st ed bef or e new wor k st ar t ed.
1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.
Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.
I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.
1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.
1. 6 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT
1. 6. 1 Del i ver y Schedul e
Not i f y t he Cont r act i ng Of f i cer i n wr i t i ng at l east 14 cal endar days i n advance of t he dat e on whi ch t he mat er i al s and equi pment ar e r equi r ed.
Pi ck up mat er i al s and equi pment no l at er t han 30 cal endar days af t er such dat e.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 2
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
11/ 20, CHG 2: 05/ 22
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y - - Saf et y and Heal t h Requi r ement s Manual
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.
Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00
SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Vi ew Locat i on Map
SD- 04 Sampl es
Col or Boar ds
1. 3 COLOR BOARDS FOR AI R FORCE PROJECTS
Submi t f i ve set s of col or boar ds wi t hi n 90 cal endar days af t er Cont r act Awar d. Each set of boar ds must i ncl ude sampl es of col or s and f i ni shes of i nt er i or sur f aces, such as wal l s, f l oor s, and cei l i ngs. Pr esent t he sampl es on 8 by 10- 1/ 2 i nches boar ds ( modul es) wi t h a maxi mum spr ead of 24 by 31- 1/ 2 i nches f or f ol dout s. Desi gn modul es t o f i t i n a st andar d l oose- l eaf , t hr ee- r i ng bi nder . Wher e speci al f i ni shes such as ar chi t ect ur al concr et e, car pet , or pr ef i ni shed t ext ur ed met al panel s ar e r equi r ed, submi t sampl es not l ess t han 12 i nches squar e wi t h t he boar d.
I f mor e space i s needed, mor e t han one boar d per set may be submi t t ed.
Cer t i f y t hat t he col or sampl es have been r evi ewed i n det ai l , and t hat t he col or sampl es ar e i n st r i ct accor dance wi t h cont r act dr awi ngs and speci f i cat i ons, except as may be ot her wi se expl i c i t l y st at ed. Submi t t al of col or sampl es does not r el i eve t he Cont r act or of t he r esponsi bi l i t y t o submi t sampl es r equi r ed el sewher e her ei n.
1. 4 VI EW LOCATI ON MAP
Submi t , pr i or t o or wi t h t he f i r st di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.
SECTI ON 01 30 00 Page 1
1. 5 MI NI MUM I NSURANCE REQUI REMENTS
Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act .
1. 6 SUPERVI SI ON
1. 6. 1 Super i nt endent Qual i f i cat i ons
Pr ovi de pr oj ect super i nt endent wi t h a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.
For pr oj ect s wher e t he super i nt endent i s per mi t t ed t o al so ser ve as t he Qual i t y Cont r ol ( QC) Manager as est abl i shed i n Sect i on QUALI TY CONTROL, t he super i nt endent must have qual i f i cat i ons i n accor dance wi t h t hat sect i on.
1. 6. 2 Mi ni mum Communi cat i on Requi r ement s
Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of Cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he Cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .
1. 6. 3 Dut i es
The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng subcont r act or s and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect . The super i nt endent i s r equi r ed t o at t end Red Zone meet i ngs, par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.
1. 6. 4 Non- Compl i ance Act i ons
The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o ensur e t i mel y compl et i on.
Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .
1. 7 PRECONSTRUCTI ON
I mmedi at el y af t er awar d, pr i or t o commenci ng any wor k at t he s i t e, coor di nat e wi t h t he Cont r act i ng Of f i cer a t i me and pl ace t o meet f or t he
SECTI ON 01 30 00 Page 2
Pr econst r uct i on . The must t ake pl ace wi t hi n 35 35 cal endar days af t er awar d of t he cont r act , but pr i or t o commencement of any wor k at t he s i t e.
The pur pose of t hi s i s t o di scuss and devel op a mut ual under st andi ng of t he admi ni st r at i ve r equi r ement s of t he Cont r act i ncl udi ng but not l i mi t ed t o: dai l y r epor t i ng, i nvoi c i ng, val ue engi neer i ng, saf et y, base- access, out age r equest s, hot wor k per mi t s, schedul e r equi r ement s, qual i t y cont r ol , schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, submi t t al s, cyber secur i t y, pr osecut i on of t he wor k, gover nment accept ance, f i nal i nspect i ons and cont r act c l ose- out . Cont r act or must pr esent and di scuss t hei r basi c appr oach t o schedul i ng t he const r uct i on wor k and any r equi r ed phasi ng.
1. 7. 1 At t endees
Cont r act or at t endees must i ncl ude t he Pr oj ect Manager , Super i nt endent , Si t e Saf et y and Heal t h Of f i cer ( SSHO) , Qual i t y Cont r ol Manager and maj or subcont r act or s.
1. 8 PARTNERI NG
Cont r act or shal l host t he par t ner i ng sessi on wi t hi n 45 cal endar days of cont r act awar d. To most ef f ect i vel y accompl i sh t hi s Cont r act , t he Cont r act or and Gover nment must f or m a cohesi ve par t ner shi p wi t h t he common goal of dr awi ng on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a successf ul pr oj ect wi t hout saf et y mi shaps, conf or mi ng t o t he Cont r act , wi t hi n budget and on schedul e. The par t ner i ng t eam must consi st of per sonnel f r om bot h t he Gover nment and Cont r act or i ncl udi ng pr oj ect l evel and cor por at e l evel l eader shi p posi t i ons. Key Per sonnel f r om t he suppor t ed command, end user , , Cont r act or , and key subcont r act or s ar e r equi r ed t o par t i c i pat e i n t he Par t ner i ng pr ocess.
1. 8. 1 Team- Led ( I nf or mal ) Par t ner i ng
a. The Cont r act i ng Of f i cer wi l l coor di nat e t he i ni t i al Team- Led ( I nf or mal ) Par t ner i ng Sessi on wi t h key per sonnel of t he pr oj ect t eam, i ncl udi ng Cont r act or and Gover nment per sonnel . The Par t ner i ng Sessi on wi l l be co- l ed by t he Gover nment Const r uct i on Manager and Cont r act or ' s Pr oj ect Manager .
b. The I ni t i al Team- l ed Par t ner i ng sessi on may be hel d concur r ent l y wi t h t he Pr e- Const r uct i on meet i ng. Par t ner i ng sessi ons wi l l be hel d at a l ocat i on mut ual l y agr eed t o by t he Cont r act i ng Of f i cer and t he Cont r act or , t ypi cal l y at a conf er ence r oom on- base or at t he Cont r act or ' s t empor ar y t r ai l er .
c. The I ni t i al Team- Led Par t ner i ng Sessi on wi l l be conduct ed and f aci l i t at ed usi ng el ect r oni c medi a ( a v i deo and accompanyi ng f or ms) pr ovi ded by Cont r act i ng Of f i cer .
d. The Par t ner s wi l l det er mi ne t he f r equency of t he f ol l ow- on sessi ons.
e. Par t i c i pant s wi l l bear t hei r own cost s f or meal s, l odgi ng and t r anspor t at i on associ at ed wi t h Par t ner i ng.
1. 9 MOBI LI ZATI ON
Cont r act or shal l mobi l i ze t o t he j obsi t e wi t hi n 60 cal endar days af t er cont r act awar d . Mobi l i ze i s def i ned as havi ng equi pment AND havi ng a physi cal pr esence of at l east one per son f r om t he cont r act or ' s t eam on t he
SECTI ON 01 30 00 Page 3 j obsi t e.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 30 00 Page 4
SECTI ON 01 32 16. 00 20
SMALL PROJECT CONSTRUCTI ON PROGRESS SCHEDULES
08/ 18, CHG 1: 08/ 20
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Basel i ne Const r uct i on Schedul e
SD- 07 Cer t i f i cat es
Mont hl y Updat es
1. 2 PRE- CONSTRUCTI ON SCHEDULE REQUI REMENT
Wi t hi n 30 cal endar days af t er cont r act awar d and Pr i or t o t he st ar t of wor k, pr epar e and submi t t o t he Cont r act i ng Of f i cer a Basel i ne Const r uct i on Schedul e i n t he f or m of a i n accor dance wi t h t he t er ms i n Cont r act Cl ause FAR 52. 236- 15 Schedul es f or Const r uct i on Cont r act s, except as modi f i ed i n t hi s cont r act . The appr oval of a Basel i ne Const r uct i on Schedul e i s a condi t i on pr ecedent t o:
a. The Cont r act or st ar t i ng demol i t i on wor k or const r uct i on st age( s) of t he cont r act .
b. Pr ocessi ng Cont r act or ' s i nvoi ce( s) f or const r uct i on act i v i t i es/ i t ems of wor k.
c. Revi ew of any schedul e updat es.
Submi t t al of t he Basel i ne Const r uct i on Schedul e, and subsequent schedul e updat es, i s under st ood t o be t he Cont r act or ' s cer t i f i cat i on t hat t he submi t t ed schedul e meet s t he r equi r ement s of t he Cont r act Document s, r epr esent s t he Cont r act or ' s pl an on how t he wor k wi l l be accompl i shed, and accur at el y r ef l ect s t he wor k t hat has been accompl i shed and how i t was sequenced ( as- bui l t l ogi c) .
1. 3 SCHEDULE FORMAT
1. 3. 1 Schedul e Submi t t al s and Pr ocedur es
Submi t Schedul es and updat es i n har d copy and on el ect r oni c medi a t hat i s accept abl e t o t he Cont r act i ng Of f i cer . Submi t an el ect r oni c back- up of t he pr oj ect schedul e i n an i mpor t f or mat compat i bl e wi t h t he Gover nment ' s schedul i ng pr ogr am.
SECTI ON 01 32 16. 00 20 Page 1
1. 4 SCHEDULE MONTHLY UPDATES
Updat e t he Const r uct i on Schedul e at mont hl y i nt er val s or when t he schedul e has been r evi sed. Keep t he updat ed schedul e cur r ent , r ef l ect i ng act ual act i v i t y pr ogr ess and pl an f or compl et i ng t he r emai ni ng wor k. Submi t copi es of pur chase or der s and conf i r mat i on of del i ver y dat es as di r ect ed by t he Cont r act i ng Of f i cer .
a. Nar r at i ve Repor t : I dent i f y and j ust i f y t he f ol l owi ng:
( 1) Pr ogr ess made i n each ar ea of t he pr oj ect ;
( 2) Longest Pat h: I ncl ude pr i nt ed copy on 11 by 17 i nch paper , l andscape set t i ng;
( 3) Dat e/ t i me const r ai nt ( s) , ot her t han t hose r equi r ed by t he cont r act ;
( 4) Li st i ng of changes made bet ween t he pr evi ous schedul e and cur r ent updat ed schedul e i ncl udi ng: added or r emoved act i v i t i es, or i gi nal and r emai ni ng dur at i ons f or act i v i t i es t hat have not st ar t ed, l ogi c ( sequence, const r ai nt , l ag/ l ead) , mi l est ones, pl anned sequence of oper at i ons, l ongest pat h, cal endar s or cal endar assi gnment s, and cost l oadi ng.
( 5) Any decr ease i n pr evi ousl y r epor t ed act i v i t y Ear ned Amount ;
( 6) Pendi ng i t ems and st at us t her eof , i ncl udi ng per mi t s, changes or der s, and t i me ext ensi ons;
( 7) St at us of Cont r act Compl et i on Dat e and i nt er i m mi l est ones;
( 8) Cur r ent and ant i c i pat ed del ays ( descr i be cause of del ay and cor r ect i ve act i ons( s) and mi t i gat i on measur es t o mi ni mi ze) ;
( 9) Descr i pt i on of cur r ent and f ut ur e schedul e pr obl em ar eas.
For each ent r y i n t he nar r at i ve r epor t , c i t e t he r espect i ve Act i v i t y I D and Act i v i t y Name, t he dat e and r eason f or t he change, and descr i pt i on of t he change.
1. 5 3- WEEK LOOK AHEAD SCHEDULE
Pr epar e and i ssue a 3- Week Look Ahead schedul e t o pr ovi de a mor e det ai l ed day- t o- day pl an of upcomi ng wor k i dent i f i ed on t he Const r uct i on Schedul e.
Key t he wor k pl ans t o act i v i t y number s when a NAS i s r equi r ed and updat e each week t o show t he pl anned wor k f or t he cur r ent and f ol l owi ng t wo- week per i od. Addi t i onal l y, i ncl ude upcomi ng out ages, c l osur es, pr epar at or y meet i ngs, and i ni t i al meet i ngs. I dent i f y cr i t i cal pat h act i v i t i es on t he Thr ee- Week Look Ahead Schedul e. The det ai l wor k pl ans ar e t o be bar char t t ype schedul es, mai nt ai ned separ at el y f r om t he Const r uct i on Schedul e on an el ect r oni c spr eadsheet pr ogr am and pr i nt ed on 8- 1/ 2 by 11 i nch sheet s as di r ect ed by t he Cont r act i ng Of f i cer . Act i v i t i es must not exceed 5 wor ki ng days i n dur at i on and have suf f i c i ent l evel of det ai l t o assi gn cr ews, t ool s and equi pment r equi r ed t o compl et e t he wor k. Del i ver t hr ee har d copi es and one el ect r oni c f i l e of t he 3- Week Look Ahead Schedul e t o t he Cont r act i ng Of f i cer no l at er t han 8 a. m. each Monday, and r evi ew dur i ng t he weekl y CQC Coor di nat i on or Pr oduct i on Meet i ng.
SECTI ON 01 32 16. 00 20 Page 2
1. 6 CORRESPONDENCE AND TEST REPORTS:
Cor r espondence ( e. g. , l et t er s, Request s f or I nf or mat i on ( RFI s) , e- mai l s, meet i ng mi nut e i t ems, Pr oduct i on and QC Dai l y Repor t s, mat er i al del i ver y t i cket s, phot ogr aphs) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed. Test r epor t s ( e. g. , concr et e, soi l compact i on, wel d, pr essur e) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed.
1. 7 ADDI TI ONAL SCHEDULI NG REQUI REMENTS
Any r ef er ences t o addi t i onal schedul i ng r equi r ement s, i ncl udi ng syst ems t o be i nspect ed, t est ed and commi ssi oned, t hat ar e l ocat ed t hr oughout t he r emai nder of t he Cont r act Document s, ar e subj ect t o al l r equi r ement s of t hi s sect i on.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
SECTI ON 01 32 16. 00 20 Page 3
SECTI ON 01 32 16. 00 20 Page 4
SECTI ON 01 33 00
SUBMI TTAL PROCEDURES
08/ 18, CHG 4: 02/ 21
PART 1 GENERAL
1. 1 DEFI NI TI ONS
1. 1. 1 Submi t t al Descr i pt i ons ( SD)
Submi t t al r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons. Exampl es and descr i pt i ons of submi t t al s i dent i f i ed by t he Submi t t al Descr i pt i on ( SD) number s and t i t l es f ol l ow:
SD- 01 Pr econst r uct i on Submi t t al s
For Gover nment appr oved di v i s i on 01 pr econst r uct i on submi t t al s t hat ar e r equi r ed pr i or t o or commenci ng wi t h t he st ar t of wor k must be submi t t ed wi t hi n 30 cal endar days of cont r act awar d unl ess speci f i ed el sewher e i n t he speci f i cat i ons. For cont r act or appr oved di v i s i on 01 submi t t al s t hat ar e r equi r ed pr i or t o or commenci ng wi t h t he st ar t of wor k must be submi t t ed wi t hi n 45 cal endar days of cont r act awar d unl ess speci f i ed el sewher e i n t he speci f i cat i ons.
Pr econst r uct i on Submi t t al s i ncl ude schedul es and a t abul ar l i s t of l ocat i ons, f eat ur es, and ot her per t i nent i nf or mat i on r egar di ng pr oduct s, mat er i al s, equi pment , or component s t o be used i n t he wor k.
Cer t i f i cat es Of I nsur ance
Sur et y Bonds
Li st Of Pr oposed Subcont r act or s
Li st Of Pr oposed Pr oduct s
Basel i ne Net wor k Anal ysi s Schedul e ( NAS)
Submi t t al Regi st er
Schedul e Of Pr i ces Or Ear ned Val ue Repor t
Wor k Pl an
Qual i t y Cont r ol ( QC) pl an
Envi r onment al Pr ot ect i on Pl an Expl osi ve Saf et y Submi ssi on ESS Wor k Pl an
SD- 02 Shop Dr awi ngs
Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.
Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n
SECTI ON 01 33 00 Page 1 pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .
Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.
SD- 03 Pr oduct Dat a
Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.
Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.
SD- 04 Sampl es
Fabr i cat ed or unf abr i cat ed physi cal exampl es of mat er i al s, equi pment or wor kmanshi p t hat i l l ust r at e f unct i onal and aest het i c char act er i st i cs of a mat er i al or pr oduct and est abl i sh st andar ds by whi ch t he wor k can be j udged.
Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .
Fi el d sampl es and mock- ups const r uct ed on t he pr oj ect s i t e est abl i sh st andar ds ensur i ng wor k can be j udged. I ncl udes assembl i es or por t i ons of assembl i es t hat ar e t o be i ncor por at ed i nt o t he pr oj ect and t hose t hat wi l l be r emoved at concl usi on of t he wor k.
SD- 05 Desi gn Dat a
Desi gn cal cul at i ons, mi x desi gns, anal yses or ot her dat a per t ai ni ng t o a par t of wor k.
SD- 06 Test Repor t s
Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. Unl ess speci f i ed i n anot her sect i on, t est i ng must have been wi t hi n t hr ee year s of dat e of cont r act awar d f or t he pr oj ect .
Repor t t hat i ncl udes f i ndi ngs of a t est r equi r ed t o be per f or med on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.
Repor t t hat i ncl udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er i nst al l at i on.
I nvest i gat i on r epor t s
Dai l y l ogs and checkl i st s
Fi nal accept ance t est and oper at i onal t est pr ocedur e
SECTI ON 01 33 00 Page 2
SD- 07 Cer t i f i cat es
St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat t he pr oduct , syst em, or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .
Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , i nst al l er or Subcont r act or t hr ough Cont r act or . The document pur pose i s t o f ur t her pr omot e t he or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods, or per sonnel qual i f i cat i ons.
Conf i ned space ent r y per mi t s
Text of post ed oper at i ng i nst r uct i ons
SD- 08 Manuf act ur er ' s I nst r uct i ons
Pr epr i nt ed mat er i al descr i bi ng i nst al l at i on of a pr oduct , syst em or mat er i al , i ncl udi ng speci al not i ces and ( SDS) concer ni ng i mpedances, hazar ds and saf et y pr ecaut i ons.
SD- 09 Manuf act ur er ' s Fi el d Repor t s
Document at i on of t he t est i ng and ver i f i cat i on act i ons t aken by manuf act ur er ' s r epr esent at i ve at t he j ob s i t e, i n t he v i c i ni t y of t he j ob s i t e, or on a sampl e t aken f r om t he j ob s i t e, on a por t i on of t he wor k, dur i ng or af t er i nst al l at i on, t o conf i r m compl i ance wi t h manuf act ur er ' s st andar ds or i nst r uct i ons. The document at i on must be si gned by an aut hor i zed of f i c i al of a t est i ng l abor at or y or agency and st at e t he t est r esul t s; and i ndi cat e whet her t he mat er i al , pr oduct , or syst em has passed or f ai l ed t he t est .
Fact or y t est r epor t s.
SD- 10 Oper at i on and Mai nt enance Dat a
Dat a pr ovi ded by t he manuf act ur er , or t he syst em pr ovi der , i ncl udi ng manuf act ur er ' s hel p and pr oduct l i ne document at i on, necessar y t o mai nt ai n and i nst al l equi pment , f or oper at i ng and mai nt enance use by f aci l i t y per sonnel .
Dat a r equi r ed by oper at i ng and mai nt enance per sonnel f or t he saf e and ef f i c i ent oper at i on, mai nt enance and r epai r of t he i t em.
Dat a i ncor por at ed i n an oper at i ons and mai nt enance manual or cont r ol syst em.
SD- 11 Cl oseout Submi t t al s
Document at i on t o r ecor d compl i ance wi t h t echni cal or admi ni st r at i ve r equi r ement s or t o est abl i sh an admi ni st r at i ve mechani sm.
Submi t t al s r equi r ed f or Gui di ng Pr i nci pl e Val i dat i on ( GPV) or Thi r d Par t y Cer t i f i cat i on ( TPC) .
Speci al r equi r ement s necessar y t o pr oper l y c l ose out a const r uct i on
SECTI ON 01 33 00 Page 3 cont r act . For exampl e, Recor d Dr awi ngs and as- bui l t dr awi ngs. Al so, submi t t al r equi r ement s necessar y t o pr oper l y c l ose out a maj or phase of const r uct i on on a mul t i - phase cont r act .
1. 1. 2 Appr ovi ng Aut hor i t y
Of f i ce or desi gnat ed per son aut hor i zed t o appr ove t he submi t t al .
1. 1. 3 Wor k
As used i n t hi s sect i on, on- si t e and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such const r uct i on. I n except i on, excl udes wor k t o pr oduce SD- 01 submi t t al s.
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or “ S” c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Submi t t al Regi st er
1. 3 SUBMI TTAL CLASSI FI CATI ON
1. 3. 1 Gover nment Appr oved ( G)
Gover nment appr oval i s r equi r ed f or ext ensi ons of desi gn, cr i t i cal mat er i al s, var i at i ons, equi pment whose compat i bi l i t y wi t h t he ent i r e syst em must be checked, and ot her i t ems as desi gnat ed by t he Gover nment .
Wi t hi n t he t er ms of t he Cont r act Cl ause SPECI FI CATI ONS AND DRAWI NGS FOR CONSTRUCTI ON, submi t t al s ar e consi der ed t o be " shop dr awi ngs. "
1. 3. 2 For I nf or mat i on Onl y
Submi t t al s not r equi r i ng Gover nment appr oval wi l l be f or i nf or mat i on onl y. Wi t hi n t he t er ms of t he Cont r act Cl ause SPECI FI CATI ONS AND DRAWI NGS FOR CONSTRUCTI ON, t hey ar e not consi der ed t o be " shop dr awi ngs. "
1. 4 PREPARATI ON
1. 4. 1 Tr ansmi t t al For m
1. 4. 2 Submi t t al For mat
1. 4. 2. 1 For mat of SD- 01 Pr econst r uct i on Submi t t al s
When t he submi t t al i ncl udes a document t hat i s t o be used i n t he pr oj ect , or i s t o become par t of t he pr oj ect r ecor d, ot her t han as a submi t t al , do not appl y t he Cont r act or ' s appr oval st amp t o t he document i t sel f , but t o a separ at e sheet accompanyi ng t he document .
SECTI ON 01 33 00 Page 4
Pr ovi de dat a i n t he uni t of measur e used i n t he cont r act document s.
1. 4. 2. 2 For mat f or SD- 02 Shop Dr awi ngs
Pr ovi de shop dr awi ngs not l ess t han 8 1/ 2 by 11 i nches nor mor e t han 30 by 42 i nches, except f or f ul l - s i ze pat t er ns or t empl at es. Pr epar e dr awi ngs t o accur at e s i ze, wi t h scal e i ndi cat ed, unl ess anot her f or m i s r equi r ed.
Ensur e dr awi ngs ar e sui t abl e f or r epr oduct i on and of a qual i t y t o pr oduce cl ear , di st i nct l i nes and l et t er s, wi t h dar k l i nes on a whi t e backgr ound.
a. I ncl ude t he namepl at e dat a, s i ze, and capaci t y on dr awi ngs. Al so i ncl ude appl i cabl e f eder al , mi l i t ar y, i ndust r y, and t echni cal soci et y publ i cat i on r ef er ences.
b. Di mensi on dr awi ngs, except di agr ams and schemat i c dr awi ngs. Pr epar e dr awi ngs demonst r at i ng i nt er f ace wi t h ot her t r ades t o scal e. Use t he same uni t of measur e f or shop dr awi ngs as i ndi cat ed on t he cont r act dr awi ngs. I dent i f y mat er i al s and pr oduct s f or wor k shown.
Pr esent shop dr awi ngs si zed 8 1/ 2 by 11 i nches as par t of t he bound vol ume f or submi t t al s. Pr esent l ar ger dr awi ngs i n set s. Submi t an el ect r oni c copy of dr awi ngs i n PDF f or mat .
1. 4. 2. 2. 1 Dr awi ng I dent i f i cat i on
I ncl ude on each dr awi ng t he dr awi ng t i t l e, number , dat e, and r evi s i on number s and dat es, i n addi t i on t o i nf or mat i on r equi r ed i n par agr aph
I DENTI FYI NG SUBMI TTALS.
Number dr awi ngs i n a l ogi cal sequence. Each dr awi ng i s t o bear t he number of t he submi t t al i n a uni f or m l ocat i on next t o t he t i t l e bl ock. Pl ace t he Gover nment cont r act number i n t he mar gi n, i mmedi at el y bel ow t he t i t l e bl ock, f or each dr awi ng.
1. 4. 2. 3 For mat of SD- 03 Pr oduct Dat a
Pr esent pr oduct dat a submi t t al s f or each sect i on as a compl et e, bound vol ume. I ncl ude a t abl e of cont ent s, l i s t i ng t he page and cat al og i t em number s f or pr oduct dat a.
I ndi cat e, by pr omi nent not at i on, each pr oduct t hat i s bei ng submi t t ed;
i ndi cat e t he speci f i cat i on sect i on number and par agr aph number t o whi ch i t per t ai ns.
1. 4. 2. 3. 1 Pr oduct I nf or mat i on
Suppl ement pr oduct dat a wi t h mat er i al pr epar ed f or t he pr oj ect t o sat i sf y t he submi t t al r equi r ement s wher e pr oduct dat a does not exi st . I dent i f y t hi s mat er i al as devel oped speci f i cal l y f or t he pr oj ect , wi t h i nf or mat i on and f or mat as r equi r ed f or submi ssi on of SD- 07 Cer t i f i cat es.
Pr ovi de pr oduct dat a i n uni t s used i n t he Cont r act document s. Wher e pr oduct dat a ar e i ncl uded i n pr epr i nt ed cat al ogs wi t h anot her uni t , submi t t he di mensi ons i n cont r act document uni t s, on a separ at e sheet .
1. 4. 2. 3. 2 St andar ds
Wher e equi pment or mat er i al s ar e speci f i ed t o conf or m t o i ndust r y or t echni cal - soci et y r ef er ence st andar ds of such or gani zat i ons as t he
SECTI ON 01 33 00 Page 5
Amer i can Nat i onal St andar ds I nst i t ut e ( ANSI ) , ASTM I nt er nat i onal ( ASTM) , Nat i onal El ect r i cal Manuf act ur er ' s Associ at i on ( NEMA) , Under wr i t er s Labor at or i es ( UL) , or Associ at i on of Edi son I l l umi nat i ng Compani es ( AEI C) , submi t pr oof of such compl i ance. The l abel or l i s t i ng by t he speci f i ed or gani zat i on wi l l be accept abl e evi dence of compl i ance. I n l i eu of t he l abel or l i s t i ng, submi t a cer t i f i cat e f r om an i ndependent t est i ng or gani zat i on, compet ent t o per f or m t est i ng, and appr oved by t he Cont r act i ng Of f i cer . St at e on t he cer t i f i cat e t hat t he i t em has been t est ed i n accor dance wi t h t he speci f i ed or gani zat i on' s t est met hods and t hat t he i t em compl i es wi t h t he speci f i ed or gani zat i on' s r ef er ence st andar d.
1. 4. 2. 3. 3 Dat a Submi ssi on
Col l ect r equi r ed dat a submi t t al s f or each speci f i c mat er i al , pr oduct , uni t of wor k, or syst em i nt o a s i ngl e submi t t al t hat i s mar ked f or choi ces, opt i ons, and por t i ons appl i cabl e t o t he submi t t al . Mar k each copy of t he pr oduct dat a i dent i cal l y. Par t i al submi t t al s wi l l not be accept ed f or expedi t i on of t he const r uct i on ef f or t .
Submi t t he manuf act ur er ' s i nst r uct i ons bef or e i nst al l at i on.
1. 4. 2. 4 For mat of SD- 04 Sampl es
1. 4. 2. 4. 1 Sampl e Char act er i st i cs
Fur ni sh sampl es i n t he f ol l owi ng si zes, unl ess ot her wi se speci f i ed or unl ess t he manuf act ur er has pr epackaged sampl es of appr oxi mat el y t he same si ze as speci f i ed:
a. Sampl e of Equi pment or Devi ce: Ful l s i ze.
b. Sampl e of Mat er i al s Less Than 2 by 3 i nches: Bui l t up t o 8 1/ 2 by 11 i nches.
c. Sampl e of Mat er i al s Exceedi ng 8 1/ 2 by 11 i nches: Cut down t o 8 1/ 2 by 11 i nches and adequat e t o i ndi cat e col or , t ext ur e, and mat er i al var i at i ons.
d. Sampl e of Li near Devi ces or Mat er i al s: 10 i nch l engt h or l engt h t o be suppl i ed, i f l ess t han 10 i nches. Exampl es of l i near devi ces or mat er i al s ar e condui t and handr ai l s.
e. Sampl e Vol ume of Nonsol i d Mat er i al s: Pi nt . Exampl es of nonsol i d mat er i al s ar e sand and pai nt .
f . Col or Sel ect i on Sampl es: 2 by 4 i nches. Wher e sampl es ar e speci f i ed f or sel ect i on of col or , f i ni sh, pat t er n, or t ext ur e, submi t t he f ul l set of avai l abl e choi ces f or t he mat er i al or pr oduct speci f i ed. Si zes and quant i t i es of sampl es ar e t o r epr esent t hei r r espect i ve st andar d uni t .
g. Sampl e Panel : 4 by 4 f eet .
h. Sampl e I nst al l at i on: 100 squar e f eet .
1. 4. 2. 4. 2 Sampl e I ncor por at i on
Reusabl e Sampl es: I ncor por at e r et ur ned sampl es i nt o wor k onl y i f so
SECTI ON 01 33 00 Page 6 speci f i ed or i ndi cat ed. I ncor por at ed sampl es ar e t o be i n undamaged condi t i on at t he t i me of use.
Recor di ng of Sampl e I nst al l at i on: Not e and pr eser ve t he not at i on of any ar ea const i t ut i ng a sampl e i nst al l at i on, but r emove t he not at i on at t he f i nal c l ean- up of t he pr oj ect .
1. 4. 2. 4. 3 Compar i son Sampl e
Sampl es Showi ng Range of Var i at i on: Wher e var i at i ons i n col or , f i ni sh, pat t er n, or t ext ur e ar e unavoi dabl e due t o nat ur e of t he mat er i al s, submi t set s of sampl es of not l ess t han t hr ee uni t s showi ng ext r emes and mi ddl e of r ange. Mar k each uni t t o descr i be i t s r el at i on t o t he r ange of t he var i at i on.
When col or , t ext ur e, or pat t er n i s speci f i ed by nami ng a par t i cul ar manuf act ur er and st y l e, i ncl ude one sampl e of t hat manuf act ur er and st y l e, f or compar i son.
1. 4. 2. 5 For mat of SD- 05 Desi gn Dat a
Pr ovi de desi gn dat a and cer t i f i cat es on 8 1/ 2 by 11 i nch paper . Pr ovi de a bound vol ume f or submi t t al s cont ai ni ng numer ous pages.
1. 4. 2. 6 For mat of SD- 06 Test Repor t s
Pr ovi de r epor t s on 8 1/ 2 by 11 i nch paper i n a compl et e bound vol ume.
By pr omi nent not at i on, i ndi cat e each r epor t i n t he submi t t al . I ndi cat e t he speci f i cat i on number and par agr aph number t o whi ch each r epor t per t ai ns.
1. 4. 2. 7 For mat of SD- 07 Cer t i f i cat es
Pr ovi de desi gn dat a and cer t i f i cat es on 8 1/ 2 by 11 i nch paper . Pr ovi de a bound vol ume f or submi t t al s cont ai ni ng numer ous pages.
1. 4. 2. 8 For mat of SD- 08 Manuf act ur er ' s I nst r uct i ons
Pr esent manuf act ur er ' s i nst r uct i ons submi t t al s f or each sect i on as a compl et e, bound vol ume. I ncl ude t he manuf act ur er ' s name, t r ade name, pl ace of manuf act ur e, and cat al og model or number on pr oduct dat a. Al so i ncl ude appl i cabl e f eder al , mi l i t ar y, i ndust r y, and t echni cal - soci et y publ i cat i on r ef er ences. I f suppl ement al i nf or mat i on i s needed t o c l ar i f y t he manuf act ur er ' s dat a, submi t i t as speci f i ed f or SD- 07 Cer t i f i cat es.
Submi t t he manuf act ur er ' s i nst r uct i ons bef or e i nst al l at i on.
1. 4. 2. 8. 1 St andar ds
Wher e equi pment or mat er i al s ar e speci f i ed t o conf or m t o i ndust r y or t echni cal - soci et y r ef er ence st andar ds of such or gani zat i ons as t he Amer i can Nat i onal St andar ds I nst i t ut e ( ANSI ) , ASTM I nt er nat i onal ( ASTM) , Nat i onal El ect r i cal Manuf act ur er ' s Associ at i on ( NEMA) , Under wr i t er s Labor at or i es ( UL) , or Associ at i on of Edi son I l l umi nat i ng Compani es ( AEI C) , submi t pr oof of such compl i ance. The l abel or l i s t i ng by t he speci f i ed or gani zat i on wi l l be accept abl e evi dence of compl i ance. I n l i eu of t he l abel or l i s t i ng, submi t a cer t i f i cat e f r om an i ndependent t est i ng or gani zat i on, compet ent t o per f or m t est i ng, and appr oved by t he
SECTI ON 01 33 00 Page 7
Cont r act i ng Of f i cer . St at e on t he cer t i f i cat e t hat t he i t em has been t est ed i n accor dance wi t h t he speci f i ed or gani zat i on' s t est met hods and t hat t he i t em compl i es wi t h t he speci f i ed or gani zat i on' s r ef er ence st andar d.
1. 4. 2. 9 For mat of SD- 09 Manuf act ur er ' s Fi el d Repor t s
Pr ovi de r epor t s on 8 1/ 2 by 11 i nch paper i n a compl et e bound vol ume.
By pr omi nent not at i on, i ndi cat e each r epor t i n t he submi t t al . I ndi cat e t he speci f i cat i on number and par agr aph number t o whi ch each r epor t per t ai ns.
1. 4. 2. 10 For mat of SD- 10 Oper at i on and Mai nt enance Dat a ( O&M)
Compl y wi t h t he r equi r ement s speci f i ed i n Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA f or O&M Dat a f or mat .
1. 4. 2. 11 For mat of SD- 11 Cl oseout Submi t t al s
When t he submi t t al i ncl udes a document t hat i s t o be used i n t he pr oj ect or i s t o become par t of t he pr oj ect r ecor d, ot her t han as a submi t t al , do not appl y t he Cont r act or ' s appr oval st amp t o t he document i t sel f , but t o a separ at e sheet accompanyi ng t he document .
Pr ovi de dat a i n t he uni t of measur e used i n t he cont r act document s.
1. 4. 3 Sour ce Dr awi ngs f or Shop Dr awi ngs
1. 4. 3. 1 Sour ce Dr awi ngs
The ent i r e set of sour ce dr awi ng f i l es ( DWG) wi l l not be pr ovi ded t o t he Cont r act or . Request t he speci f i c Dr awi ng Number f or t he pr epar at i on of shop dr awi ngs. Onl y t hose dr awi ngs r equest ed t o pr epar e shop dr awi ngs wi l l be pr ovi ded. These dr awi ngs ar e pr ovi ded onl y af t er awar d.
1. 4. 3. 2 Ter ms and Condi t i ons
Dat a cont ai ned on t hese el ect r oni c f i l es must not be used f or any pur pose ot her t han as a conveni ence i n t he pr epar at i on of const r uct i on dat a f or t he r ef er enced pr oj ect . Any ot her use or r euse i s at t he sol e r i sk of t he Cont r act or and wi t hout l i abi l i t y or l egal exposur e t o t he Gover nment .
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .