Attachment_1_-_SOW_-_Repair-Replace_Utility_Poles_and_Wiring_-_4_Oct_2016.pdf
PDF 179 KB Posted
- Attached to
- Repair/Replace Utility Poles and Wiring Federal contract opportunity
- Solicitation number
- FA6670-17-B-0001
About this file
Attachment 1 - SOW - Repair-Replace Utility Poles and Wiring - 4 Oct 2016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Repair_Peplace_Utility_Poles_&_Wiring_Bid_Abstract.pdf | ||
| Attachment_3_-_NY170011_Heavy_and_Highway_18_Aug_2017.pdf | ||
| Repair_Replace_Utility_Poles_-_Addendum_(1).pdf | ||
| Repair_Replace_Utility_Poles_-_Amendment_1.pdf | ||
| Repair_Replace_Utility_Poles_-_Questions_&_Answers_30_Aug_2017.pdf | ||
| Utility_Pole_Site_Visit_Sign_in_18_Aug_17.pdf | ||
| Attachment_5_-_EAL_-_Ctr_template.pdf | ||
| Attachment_4_-_Insurance_Cert.pdf | ||
| FA6670-17-B-0001_-_Utility_Poles_Solicitation.pdf | ||
| Attachment_3_-_Heavy_and_Highway_-_8_August_2017.pdf | ||
| Attachment_2_-_Drawing_-_Comprehensive_Plan_Base_Electric_Layout,_1_sheet,_dtd_19_Apr_2017.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
RVKQ 17-0717 – Repair/Replace Utility Poles and Wiring
4 OCT 16
1. SUMMARY OF WORK: The Contractor shall furnish and install all material, equipment, components, parts, tools, labor, transportation, hauling, disposal/recycling, cleaning, inspection, testing, commissioning, training, reporting, etc., necessary to perform this project as described in the contract-delivery order, including this Statement of Work and any / all applicable federal, state and local law, regulation, standards. Unless otherwise stated, any
/ all requirement for contractor to remove and properly dispose of / recycle off base, and to furnish and install / incorporate any / all new materials / equipment
/ components needed to properly complete the work item; any Government furnished property and / or reinstallation of existing materials / equipment / components shall be as stated / specified herein. Contractor shall submit materials / methods for approval prior to ordering and / or incorporation into the work; as a minimum, submittals shall include product literature, MSDS, standard color, texture and style samples / swatches / boards, and place of origin
/ manufacture. Demolished materials, waste / debris is property of the contractor, unless otherwise stated herein; contractor is responsible for proper disposal / recycling of such materials off base; such materials shall be promptly removed from the installation and shall not be stored / stockpiled unless submitted and approved for such. Contractor is responsible for verification of all details, measurement, etc., prior to ordering materials and execution of work.
Buildings will be occupied during repairs, all repairs must be done hot/live where possible. The contractor must coordinate/ reduce any disruption to occupants during demolition/ build of this project. Requests to shut off power to facilities must be coordinated 3 weeks in advance with NFAS
CEC office to allow for base coordination.
2. Repair/replace utility poles, wiring and hardware as noted below and on the attached inspection report.
a. All poles noted as having loose hardware shall all hardware checked and tightened.
914 MSG / CEC
Niagara Falls Air Reserve Station
2405 Franklin Drive
Niagara Falls, New York 14304-5063
b. All poles marked as being removed will be removed. Back fill the hole from the pole. The contractor will relocate 4 poles to a designated area.
The poles and the relocation area to be noted during the walkthrough.
c. All poles noted as being replaced will have all attachments removed.
Install new hardware and attachments on new pole. Any exceptions to new hardware will be noted during the walkthrough.
d. All cross-arms noted as being replaced will be replaced in kind to include any attached hardware unless failing to meet code. The contractor will turn over cross arms identified during walkthrough, laydown area for these cross arms is to be determined.
e. All wiring marked as needing to be replaced will be replaced in kind as existing unless no longer available, not sized for load or failing to meet code.
f. All hardware noted as being broken or missing will be replaced in kind as existing hardware unless no longer available, not sized for load or failing to meet code.
g. All other items noted on the inspection are to be replaced, work performed or removed in accordance with the line item. Any questions on the line item are to be addressed during the walkthrough.
h. All removed poles, hardware, wiring, etc. removed will be disposed of by the contractor, except poles, cross arms, hardware marked as being relocated. All disposal will be in accordance with the environmental specification attached and noted below.
i. Contractor is to coordinate any power interruption or data interruptions with base communications and/or building occupants. Contractor is to minimize power/data interruptions to the fullest extent.
3. A submittal of intended materials is requested for the following items for review before installation: all wiring, hardware and poles. However, see Environmental section below for required submittal documentation.
4. All installation of materials will be per manufacturer’s recommendations and local and state building code requirements. All materials must meet all NEC, NFPA codes and IAW current standards.
5. The Contractor shall be responsible for the proper disposal of all materials removed and shall ensure that the facility is secure and available for use at the end of each duty day.
6. ENVIRONMENTAL MANAGEMENT AND PROTECTION
a. A Demolition Plan meeting the requirements of environmental specification section 01 57 20, must be submitted for review prior to any work.
b. A Storm Water Pollution Prevention Plan (for disturbance less than 1 acre) meeting the requirements of environmental specification section
01 57 20, must be submitted for review prior to any work.
c. Demolition materials to be listed on the Waste / Recycle Materials Log for Contractors
d. The contractor is to remove all lamps, ballasts, thermometers, batteries
(typically found in exit signs) and any other mercury containing devices and turn over to the 914 MSG/CEV for proper disposal.
7. Green Purchasing
Contractor shall comply with the Green Purchasing requirements of the contract. Known / possible EPA Comprehensive Procurement Guideline, USDA Biobased, Green Seal Energy Star, etc., items. Recycled materials must be used to fullest extent in accordance with Executive Order 13101. The
EPA web-site, http://www.epa.gov/cpg, can be accessed for further instruction on what is an EPA-designated material.
http://www.epa.gov/cpg
POLE
NUMBER DESCRIPTION OF OBSERVATION/INSPECTION
3 Loose hardware
4 Loose hardware
13 Improper crimps on wire to 1199, Loose Hardware
13-1 Replace Pole
13-2 Replace Light
17 Loose hardware
18 Street Light Loose
19 Loose hardware
20 Loose hardware
22 Loose hardware
23 Loose Hardware, Pole light missing bolt
24 Loose Hardware. Replace top cross arm
25 Ground Rod sticking up 10 inches, pound ground rod flush with the ground
26 Loose hardware
28 Loose Hardware, pole needs dirt at base
29 Loose Hardware, Needs insulator on north side
33 Remove Pole
34 Remove Pole
34-2 Remove Pole
35 Remove Pole
36 Remove Pole
39 Replace Pole, replace light fixture
40 Loose hardware
41 Loose hardware
42 Loose hardware
43-4 Replace Pole
44 Loose hardware
44-1 Replace Pole
46 Loose hardware
48 Loose hardware, Triplex in between 47-48 bad
50 Bolt missing on street light, Loose hardware
50-1 Loose hardware
51-1 Remove pole, Remove siren and wiring back to source
54 Loose hardware
56 Loose hardware
57 Triplex insulator broken
59 Remove Old H/V wires still in pipe and pipe, Loose hardware
60 Loose hardware
61 Loose hardware
64 Street Light Loose, loose hardware
65 Replace Pole
F15 Utility Pole Inspection 2016
66 Remove CATV wiring
68-1 Replace light fixture, complete
68-2 Replace Pole, replace light fixture
73 Loose hardware
74-1 Loose hardware
75 Pole tag needs to be rescured, loose hardware
76 Ground rod not flush with ground, pound ground rod flush with the ground
77 Loose Hardware
77-1 Comm wire splice box clamp broke, replace clamp
78 Replace Pole, replace cross arms
80 Replace top cross arms that are splitting
85 Remove Pole
85-1 Meter and disconnect on pole not in use to be removed, Replace top cross arms weathered
85-2 Remove pipe and wire for old light
86 Needs dirt at base
94 Ground braids need tape, Triplex is bad
95-1 Replace Pole
95-2 Triplex shot
95-3 Triplex shot - gasket in GPS station deteriorated
95-4 Triplex shot
99 Loose hardware
100 Replace light fixture, complete
102 Loose hardware
104 Ground braids need tape, 105 Needs insulator on North wire, loose hardware
105-1 Replace Pole, remove old wiring
105-2 Replace Pole
105-3 Replace Pole
105-5 Replace Pole
107 Could use its own transformer to feed 612,triplex is maxed out
109 Loose hardware
111 Ground braids need tape, needs dirt at base
111-1 Replace Pole, replace light fixture
114-2 Remove Pole
114-3 Replace Pole, replace light fixture
114-4 Replace Pole, replace light fixture
115 Loose hardware
116-1 Replace Pole, replace light fixture
119 Needs insulator on south cross arm, guy wire loose
123 Loose hardware
127 Replace top cross arm, splitting
130-1 Replace Pole, replace light fixture
131 Loose hardware
131-1 Ground rod needs to be pounded in, remove old ground wires
132 Loose hardware
132-7 Replace Pole
132-9 Replace Pole
134 Loose hardware
135 Loose hardware
136 Loose hardware
138 Loose hardware
139 Loose hardware
140 Cut cable to wire to be removed
141 Loose hardware, needs insulator on east side
142 Replace Pole, replace cross arms
144 Loose hardware/V cover needs reattachment
144-1 Triplex feeding quarters bad, Tree needs trim
146 remove/replace broken Pvc pipe at base
147-1 Replace Pole, replace light fixture
149 Needs new number 9 on pole, Loose hardware
152 Replace cross arms
157 Pole light loose, loose hardware
161 Loose hardware
0-1 Replace Pole
0-3 Needs back guy wire pole leaning due to heavy comm cable, Loose hardware