WagesAttachment1B305.docx
DOCX document 25 KB Posted
- Attached to
- Repair Heating System B305 Federal contract opportunity
- Solicitation number
- FA6656-11-B0002
About this file
FA6656-11-B-0002 Attachment 1 Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Memo Stie Visit Questions.doc | DOC document | |
| Site Visit Attendees.pdf | ||
| SiteVisitMinutesB305.docx | DOCX document | |
| MEP Specs B305.zip | ZIP file | |
| B305 Arch Specs.zip | ZIP file | |
| B305 drawings.zip | ZIP file | |
| B305SolDoc.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: OH100003 02/04/2011 OH3
Superseded General Decision Number: OH20080003
State: Ohio
Construction Type: Building
Counties: Columbiana, Mahoning and Trumbull Counties in Ohio.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 05/07/2010 3 05/21/2010 4 06/04/2010 5 06/25/2010 6 07/02/2010 7 07/23/2010 8 07/30/2010 9 08/13/2010 10 09/10/2010 11 11/19/2010 12 12/03/2010 13 12/10/2010 14 02/04/2011
ASBE0084-003 07/01/2010
Rates Fringes
ASBESTOS WORKER/INSULATOR
(Includes application of all insulating materials, protective coverings coatings & finishings to all types of mechanical systems)..............$ 27.97 14.65
ASBE0207-011 07/01/2009
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 23.60 9.80
BOIL0154-006 06/01/2010
COLUMBIANA
Rates Fringes
BOILERMAKER......................$ 38.75 20.97
BOIL0744-004 07/01/2009
MAHONING & TRUMBULL
Rates Fringes
BOILERMAKER......................$ 36.84 17.48
BROH0006-011 05/01/2010
COLUMBIANA (Knox, Butler, West & Hanover Townships)
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.95 10.58
BROH0008-002 06/01/2010
COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton & Unity Townships and the city of New Waterford), MAHONING &
TRUMBULL
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 24.72 15.24
BROH0008-003 06/01/2010
COLUMBIANA (Center, Elk Run, Fairfield, Middleton, New Waterford, Perry, Salem & Unity Townships) & MAHONING
Marble Setter, Terrazzo Worker & Tile Setter.............$ 24.92 11.94
BROH0008-005 06/01/2010
COLUMBIANA, MAHONING (Excluding Smith Township) & TRUMBULL
Rates Fringes
Marble Setter Finisher, Terrazzo Worker Finisher, Tile Setter Finisher.............$ 22.13 11.94
BROH0010-005 07/01/2010
COLUMBIANA COUNTY (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships)
BRICKLAYER
BRICKLAYERS; CAULKERS;
CLEANERS; CEMENT
BLOCKLAYERS; MARBLE
SETTERS; POINTERS;
STONEMASONS & TERRAZZO
WORKERS.....................$ 25.20 13.71
TILE FINISHER....................$ 20.20 13.71
TILE SETTER......................$ 23.20 13.71
CARP0003-001 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
Carpenter & Soft Floor Layer.....$ 24.12 12.15
CARP0171-004 05/01/2009
COLUMBIANA
Rates Fringes
Carpenter & Soft Floor Layer.....$ 24.12 12.39
CARP1871-016 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
PILEDRIVERMAN....................$ 24.87 12.38
CARP1871-018 05/01/2009
MAHONING & TRUMBULL
Rates Fringes
MILLWRIGHT.......................$ 24.87 12.38
CARP1871-021 05/01/2009
COLUMBIANA
Rates Fringes
MILLWRIGHT.......................$ 26.96 12.14
CARP2235-008 01/01/2009
COLUMBIANA
Rates Fringes
PILEDRIVERMAN....................$ 28.85 12.10
Welder &/or Creosote........$ 29.15 12.10
ELEC0064-002 12/01/2010
COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships) & TRUMBULL (Hubbard & Liberty Townships)
ELECTRICIAN......................$ 30.27 12.42
ELEC0071-007 12/29/2008
Rates Fringes
Line Construction Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15
ELEC0246-002 11/01/2010
COLUMBIANA COUNTY (South of Butler, Fairfield, Knox, Salem & Unity Townships)
ELECTRICIAN......................$ 33.00 22.77+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.
* ELEC0540-004 12/27/2010
COLUMBIANA (Knox Township) and MAHONING (Smith Township)
COUNTIES
ELECTRICIAN......................$ 27.52 18.40
ELEC0573-004 11/29/2010
MAHONING (Milton Township) and TRUMBULL (Except Liberty & Hubbard Townships)
ELECTRICIAN......................$ 29.15 14.59
ELEV0045-003 01/01/2010
Rates Fringes
ELEVATOR MECHANIC................$ 39.52 20.035+a+b
PAID HOLIDAYS:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.
ENGI0066-023 06/01/2010
COLUMBIANA, MAHONING & TRUMBULL COUNTIES
Rates Fringes
OPERATOR: Power Equipment
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 1 - A & B.............$ 35.45 14.81
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 2 - A & B.............$ 35.12 14.81
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 3 - A & B.............$ 31.90 14.81
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 4 - A & B.............$ 28.20 14.81
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 5 - A & B.............$ 24.80 14.81
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 1 - C & D.............$ 32.49 14.81
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 2 - C & D.............$ 32.20 14.81
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 3 - C & D.............$ 29.24 14.81
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 4 - C & D.............$ 25.85 14.81
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 5 - C & D.............$ 22.74 14.81
ALL OTHER WORK
GROUP 1.....................$ 29.54 14.81
ALL OTHER WORK
GROUP 2.....................$ 29.27 14.81
ALL OTHER WORK
GROUP 3.....................$ 26.58 14.81
ALL OTHER WORK
GROUP 4.....................$ 23.50 14.81
ALL OTHER WORK
GROUP 5.....................$ 20.67 14.81
GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached
GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug;
Boring Machine Attached to Tractor; Bullclam; Bulldozer;
C.M.I. Road Builder & Similar Type; Cable Placer & Layer;
Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom;
Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead;
Crane-Rough Terrain; Crane-Side Boom; Crane-Truck;
Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;
Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile;
Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail;
Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum;
Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;
Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine;
Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar);
Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine;
Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing;
Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;
Tractor-Double Boom; Tractor with Attachments; Truck-Boom;
Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)
GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer;
Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork lift & Lulls; Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine; Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden);
Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist
GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor;
Curb Builder, self-propelled; Drill Wagon; Generator Set;
Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven;
Jack-Hydraulic (Railroad); Ladavator; Minor Machine Operator; Mixer-Concrete; Mulching Machine; Pin Puller;
Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter;
Tractor; Trencher Form; Water Blaster; Steam Jenny;
Syphon; Vibrator-Gasoline; & Welding Machine
GROUP 5 - Brakeperson; Fireperson; & Oiler
IRON0207-005 06/01/2010
COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224) & TRUMBULL
IRONWORKER
Layout; Sheeter.............$ 27.81 17.81 Ornamental; Reinforcing;
Structural..................$ 26.81 17.68
IRON0550-002 05/01/2010
COLUMBIANA (W. of a line from Damascus to Highlandtown) & MAHONING (S. of Old Rte #224)
Ironworkers:Structural, Ornamental and Reinforcing.......$ 24.38 16.70
LABO0125-001 06/01/2010
MAHONING & TRUMBULL
Rates Fringes
LABORER
HAZARDOUS WASTE
Level A....................$ 23.42 8.30 Level B....................$ 16.18 8.30 Level C....................$ 23.07 8.30 Level D....................$ 23.42 8.30
ALL OTHER WORK
GROUP 1....................$ 23.12 8.30
GROUP 2....................$ 23.24 8.30
GROUP 3....................$ 23.36 8.30
GROUP 4....................$ 23.42 8.30
GROUP 5....................$ 23.62 8.30
LABORER CLASSIFICATIONS
GROUP 1: Building & Construction Laborer; Asphalt Paving;
Railroad Labor Construction; Carpenter Tender; Asbestos Removal
GROUP 2: Mortar Mixer (Hand or Machine); Mason Tender;
Jackhammer Operator; All Machine Driven Tools (Electric, gas or air) & operation of all Pumps Under 4"; Spiker; All Laborers Working in Concrete Such as Pouring, Puddling, Raking & Conveying; All Scaffold Help; Scrap Iron Burning
GROUP 3: Hod Carrier; Rough Terrain Forklift Driver when tending Masons; Work Done by Laborers 7' or more in Depth
GROUP 4: Laborer (Except Jackhammer) Working on Repair of Blast Furnace or Coke Plant & Auxiliary Facilities;
Jackhammer Operator in Trench or Shaft 7' or more in depth;
Concrete Buster; Pipelayer; Powder & Dynamite; Jackhammer on Blast Furnace or Coke Plant & Auxiliary Facilities
GROUP 5: Wrench Laborer; Miner - Air Tool; Guniting & Sandblasting; Pumpcrete Operations; Build Up Rates - Blast Furnace; Ram Tight; Bellman & Hook-up Man; Lancing Blast Furnace
LABO0809-003 07/01/2010
COLUMBIANA
Rates Fringes
LABORER..........................$ 22.47 8.45
Asbestos Work; Hazardous Waste Work; Instrument & Laser; and Lead Based Paint Removal - Additional $.50 per hour
Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay
PAIN0476-002 06/01/2010
Rates Fringes
PAINTER
GROUP 1.....................$ 23.20 9.60
GROUP 2.....................$ 23.40 9.60
GROUP 3.....................$ 23.41 9.60
GROUP 4.....................$ 23.85 9.60
GROUP 5.....................$ 23.85 9.60
GROUP 6.....................$ 24.10 9.60
GROUP 7.....................$ 24.28 9.60
PAINTER CLASSIFICATIONS:
GROUP 1: Painters, Brush & Roller
GROUP 2: Drywall - Hand Finisher
GROUP 3: Structural Steel
GROUP 4: Wallpaper Hanger - Furnishing Own Tools
GROUP 5: Spray, Except Bar Joist/Deck
GROUP 6: Drywall - Mechanical Tools; Epoxy/Mastic; Spray- Bar Joist/Deck; Working Above 50 feet; and Swingstages
GROUP 7: Sandblasting
PAIN0639-001 05/01/2010
Rates Fringes
Sign Painter & Erector...........$ 20.23 3.25+a+b+c
FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day;
July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1 Floating Day
b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service - 20 days' paid vacation
c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral
PAIN0847-002 06/01/2010
Rates Fringes
GLAZIER..........................$ 25.16 12.39
PLAS0179-001 06/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.11 13.00
PLAS0179-002 06/01/2010
Rates Fringes
PLASTERER........................$ 27.05 12.96
PLUM0396-002 06/01/2010
COLUMBIANA (Excluding Washington & Yellow Creek Townships & Liverpool Township, Secs. 35 & 36, West of County Road #427), MAHONING and TRUMBULL COUNTIES
PLUMBER/PIPEFITTER...............$ 27.66 13.66
PLUM0495-003 06/01/2010
COLUMBIANA COUNTY (Washington & Yellow Creek Townships and Liverpool Township - Sections #35 & #36 - west of County Road #427)
Plumber, Pipefitter, Steamfitter......................$ 32.81 17.26
ROOF0071-004 06/01/2010
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 22.00 13.78
SFOH0669-003 04/01/2010
Rates Fringes
SPRINKLER FITTER.................$ 32.20 17.35
SHEE0033-007 06/01/2009
Rates Fringes
Sheet metal worker...............$ 27.66 14.85
TEAM0092-004 07/01/2008
COLUMBIANA COUNTY
Rates Fringes
Truck drivers:
GROUP 1.....................$ 21.39 9.87
GROUP 2.....................$ 21.43 9.87
GROUP 3.....................$ 21.47 9.87
GROUP 4.....................$ 22.17 9.87
GROUP 5.....................$ 22.29 9.87
CLASSIFICATIONS
GROUP 1 - End Dump; Dumpster; Turnarocker; Ross Carrier;
Athry Wagon; Greaser; Tiremen; Articulated Dump
GROUP 2 - Flatboy Material Tuck, Dump & and Semi-Dump Truck; Semi Trailer & Tractor Trailer
GROUP 3 - Tank Trucks (straight & semi)
GROUP 4 - Mechanic
GROUP 5 - Lowboy Trailer; Winch Truck; A-Frame; Forktruck;
Distributor Truck (front & back end) & Truck Crane
TEAM0377-004 06/01/2009
MAHONING & TRUMBULL COUNTIES
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 22.42 11.51
GROUP 2.....................$ 22.99 11.51
TRUCK DRIVER CLASSIFICATIONS
GROUP 1 - Dump; Water; Stake Body; Batch; Flat Bottom; Pick Up; Tandem
GROUP 2 - Semi; Semi Water; Mixer; Fuel; Distributor; Carry All; Euclid Wagon; DW 10 Caterpillar (Equivalent); Tractor Trailer (Low Boy); Tri-axel
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
FA6656-11-B-0002 Attachment 1 Page 1
File details come from the government source that posted it. Updated .