- Solicitation number
- FA6648-18-R-0001
About this file
Questions to RFI from Contractors - 1st set
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DSC_0116.jpg | JPG image | |
| DSC_0115.jpg | JPG image | |
| Third_Wave_of_Questions_from_Contractors.pdf | ||
| Second_Wave_of_questions_from_Contractors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
First Wave of questions from Contractors:
1. Who should we contact for the fire alarm quote?
Peter Hordern with Code Plus @ (305) 525-9333, email FAMNSdesign@aol.com
2. Who should we contact for the security quote?
Sandra Kinney with Advantor Systems @ 1-800-238-2686, ext. 6937, email: kinney@advantor.com
3. Do you have site and building as-builts?
Response: We have limited access to as-builts we will share as possible subject to approval from the user/owner.
4. Other than paint are there any finishes we need to include / furnish?
Response: As indicated in SOW page 3 Para A. “STUCCO AND PAINT ALL SURFACES TO MATCH
EXISTING”.
5. Are we to remove the asphalt and place a concrete slab for between the new masonry walls?
Response: As indicated in SOW Page 1, Para A. “Construction and installation of new vestibule with reinforced concrete foundation, concrete floor slab”.
6. Are we to insulate the concrete roof deck? If so what R rating are you looking for?
Response: The thermal resistance value (R value) of 19 or more. Insulation tested as part of a roof construction assembly shall bear UL or FM labels attesting to the ratings specified herein. Roof insulation system shall be as listed in the Miami-Dade County Product Control approval notice of acceptance (NOA) for roof membrane system.
7. Is there a preferred roofing subcontractor for Homestead ARB? (This way you only have to know one phone number to call for warranty issues).
Response: No.
8. What type of Roofing membrane are you looking for us to install?
Response: Roof insulation system shall be as listed in the Miami-Dade County Product Control approval notice of acceptance (NOA) for roof membrane system. Reference UFGS 03 52 00
Note: Per Para 1.1. of the SOW all work shall be done IAW the latest specifications and latest county, state and federal regulations. Para 1.2.1 A- contractor is required to comply with the most current and stringent applicable requirements.