Answers to questions from contractors

View the file

Other files for this federal contract opportunity

Other files attached to Secure Vault Fiber Premise Wiring, newest first.
File Type Posted
Wage_Determination.pdf PDF
Q_&_A_final_set.docx DOCX document
03-Evaluation_of_Proposals.pdf PDF
01-Q_&_A_Secure_Vault_Fiber_Premise_Wiring_Solicitation_FA6648-17-R-0007.pdf PDF
02-191_TELECOMMUNICATIONS_PLAN.pdf PDF
Post_site_visit_questions_&_answers_-_1st_set.docx DOCX document
As-Built_191_AREA_A.pdf PDF
SOW_-_B191_Secure_Vault_Fiber_PW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1st set of questions:

1. What is the fiber type requirement (OM2, OM3, 0M4, OM5)?

A: The contractor may use the following HTML links as a reference only. These are illustrated materials/hardware needed for this project.

Materials and prices are subjected to change without advice or notice from the vendors.

a. Optical Cable Corporation 62.5/125 Micron Tight Buffer Multimode Distribution Fiber, Type OFNR, Laser Ultra-Fox Fiber, Industrial Black PVC Jacket, 2 Fiber, Price per Foot (500 Foot Minimum Order Quantity).

Contractor may have to contact the company for pre-order on different color.

b. Gigabit 850nm Multi Mode SFP Fiber Optical Transceiver - LC 550m http://www.startech.com/Networking-IO/Media-Converters/Transceivers/1000Base -SX-Gigabit-Multi-Mode-SFP-LC-Fiber-Transceiver-Module~SFPSXMM

c. Transition Networks PCIE Express NIC-1000BFX SC MM 220M/550M
http://www.provantage.com/transition-networks-gxe-sc-01~7TRN91J1.htm

d. Series II Faceplate, two 1-unit 30 degree angled openings, single gang, Fog White https://www.legrand.us/ortronics/copper/clarity-premium-utp-solutions/workst ation/plates-and-boxes/or-40300664.aspx

e. 1m LC-SC 62.5/125 OM1 Duplex Multimode PVC Fiber Optic Cable - Orange http://www.cablestogo.com/product/33154/1m-lc-sc-62.5-125-om1-duplex-multimo de-pvc-fiber-optic-cable-orange

f. 3m LC-SC 62.5/125 OM1 Duplex Multimode PVC Fiber Optic Cable -http://www.cablestogo.com/product/33156/3m-lc-sc-62.5-125-om1-duplex-multimo

g. 3m SC-SC 62.5/125 OM1 Duplex Multimode PVC Fiber Optic Cable -http://www.cablestogo.com/product/09115/3m-sc-sc-62.5-125-om1-duplex-multimo

h. 6m SC-SC 62.5/125 OM1 Duplex Multimode PVC Fiber Optic Cable -http://www.cablestogo.com/product/09163/6m-sc-sc-62.5-125-om1-duplex-multimo

2. What are the core diameter requirements (62 micron or 50 micron)?

A: 62.5/125 Micron

3. Is there existing cable tray that can be utilized for horizontal runs?

A: Yes

4. Will new rough-in conduit/boxes for the work-area drops or will existing drop conduit be re-used?

A: re-use the 4" square box with single gang plaster ring, flush mounted in wall and the 1" conduit to telecomm room or to cable tray in corridor.

5. Can I get a picture of the existing racks (for rack spacing availability) in the MDF/TR/IDF/Comm Rooms?

R: No, You can visually inspect the site during the walk-thru.

2nd question:

Is there or will there be any drawings to get an idea off cable lengths and routes?

R: No drawings, You can visually inspect the site and take measurements during the walk-thru.

3rd question:

The attached file only provides basic information on scope for the secure vault work. There are no other details provided for the other areas specified in the scope, and no drawings that show the facilities layout, and distances of where services need to be installed.

Can requirement details for these areas (in question) be provided?

A: Refer to the attached facilities layout. Drawing is not to scale as it only serves as a general planning purpose. Distances are subjected to change based upon a contractor walk-through. Any distances provided in this Drawing are approximations and should NOT be used for ordering materials or determining lengths. Contractors will be required to determining lengths during the site walk-through.