QandA for RFQ AC Parking Apron.pdf

PDF 613 KB Posted

Attached to
Maintain Aircraft Parking Apron
Solicitation number
FA663324Q0009
Issued by

About this file

This document is a Questions and Answers (Q&A) related to Request for Quote (RFQ) # FA6633-24-Q-0009 for the Maintain Aircraft Parking Apron project at the Minneapolis Air Reserve Station in Minneapolis, Minnesota. The RFQ requires the contractor to provide all professional services, permits, supervision, labor, materials, and equipment necessary to maintain the aircraft parking apron. Key details include:

The contractor will not be required to reseal the 2" wide expansion joint in front of Building B870, but will need to clean and repaint the pavement markings. Potential staging areas are identified on a map provided. A temporary fence is required around the work area to contain debris. This is a 100% Small Business set-aside acquisition, with the Government seeking the Lowest Price Technically Acceptable quote. The Period of Performance is 120 calendar days from the notice to proceed. The applicable Wage Determination is for Hennepin County, Minnesota. Contractors must submit written questions to the Contracting Officer and Contract Specialist within 5 days after the site visit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers for RFQ # FA6633-24-Q-0009 Maintain Aircraft Parking Apron

Contractor shall provide all professional services, permits, supervision, labor, materials, and equipment necessary to fully meet all requirements of the Statement of Work, Construction Specifications, Construction Drawings and all other Contract Documents related to and/or titled MAINTAIN AIRCRAFT PARKING APRON at the Minneapolis Air Reserve Station, Minneapolis Minnesota.

The performed tasks shall be based on the project description, other data furnished in the Statement of Work (SOW), and information covered during the Pre-Construction (Pre-CON) meeting. THE SCOPE OF THIS

PROJECT INCLUDES THE MAINTAINING THE AIRCRAFT PARKING APRON.

1. Will Contractor be required to reseal the 2” wide expansion joint that is in front of building B870?

No

2. Will all the pavement markings need to be removed prior to repainting them or will they just to be cleaned and repainted?

No, just clean and re-paint.

3. Please provide a location for a staging area. Staging will be dependent on size, type, quantity of the materials and equipment to be staged.

See potential staging areas on the map below, identified in dark blue bordered in red.

4. It appears from the plan notes that a temporary fence is to be installed around the work areas. Is this required or can the contractor simply use low profile barricades or cones to separate the work area from the active aircraft apron so long as the barricades or cones are properly weighted down?

A temporary fence is required to establish the free zone/work area to aid in containing debris as mentioned at the site visit.