Technical_Specifications.pdf

PDF 242 KB Posted

Attached to
Repair & Maintain Aircraft Parking Apron Federal contract opportunity
Solicitation number
FA6633-17-R0001
Issued by
Department of the Air Force Reserve Command

About this file

Atch 1 - Technical Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Repair & Maintain Aircraft Parking Apron, newest first.
File Type Posted
Site_Visit_Sign_In_Roster.pdf PDF
QJKL_18-0016_-_Site_Visit_Questions.pdf PDF
FA6633-17-R-0001_Repair_and_Maintain_AC_Parking_Apron.pdf PDF
Drawings.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.doc DOC document
SF_24_Bid_Bond_Form.pdf PDF
20170303_Wage_Determination_MN96.pdf PDF
Sample_Consent_Letter.docx DOCX document
Financial_Responsibility_Sheet.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

934 Airlift Wing Minneapolis – St. Paul Air Reserve Station

Minneapolis, MN 55450-2100

Project No. QJKL 18-0016

REPAIR AND MAINTAIN AIRCRAFT PARKING APRON

934th Civil Engineering 760 Military Highway, Building 744

Minneapolis, MN 55450

23 March 2017

QJKL 18-0016

Repair and Maintain Aircraft Parking Apron

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 JOINTS IN CONCRETE PAVEMENTS

32 17 24.00 10 PAVEMENT MARKINGS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

01 11 00.00 40 SUMMARY OF WORK

01 33 00 SUBMITTAL PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

QJKL 18-0016 23 March 2017

SECTION 01 11 00.00 40 Page 1

SECTION 01 11 00.00 40

SUMMARY OF WORK

PART 1 GENERAL

1.1 ATTACHMENTS

AF IMT 3064 (Construction Progress Schedule)

AF IMT 3065 (Progress Report)

1.2 DESCRIPTION OF WORK

The scope of this project is to furnish all plant, labor, materials, and equipment and performing all work to Repair and Paint Airfield.

1.3 CONTRACT DRAWINGS AND SPECIFICATIONS

1.3.1 SETS FURNISHED

The Contractor shall check be responsible for making copies of specifications including amendments. The bid drawings as amended shall be utilized in the performance of the work the contract drawings (i.e., bid drawings that have been posted with all amendment changes) are provided to the contractor. See the paragraph below for contract drawing and distribution requirements. The work shall conform to the contract drawings, set out in the drawing index, all of which form a part of these specifications. The work shall also conform to any standard details bound or referenced herein.

1.3.2 NOTIFICATIONS OF DISCREPANCIES

The Contractor shall check all drawing files furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. Dimensions marked on drawings shall be followed in lieu of scale measurements. Enlarged plans and details shall govern where the same work is shown at smaller scales. All scales shown are based on a standard drawing size of 24" x 36". If any other size drawings are furnished or plotted the contractor shall adjust the scales accordingly. The Contractor shall also advise sub-contractors of the above. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.

1.3.3 OMISSIONS

Omissions from the drawings or specifications or the mis-description of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or mis-described details of the work and will be responsible for any errors which might have been avoided thereby.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When

SECTION 01 11 00.00 40 Page 2 used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Submit the following items to the Contracting Officer:

Construction Progress Schedule (AF IMT 3064); G Material Approval Schedule (AF IMT 3000); G

SD-11 Closeout Submittals

Submit the following items to the Contracting Officer:

AF IMT 3065 (Progress Report); G

Contractor shall submit for approval within 10 days after NTP. Close coordination with Base Security personnel and the Contracting Officer's Representative is required.

1.5 SCHEDULING OF WORK

The Contractor shall, within five days after the work commences or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval, three (3) copies of a Construction Progress Schedule (AF IMT 3064) showing the order in which the Contractor proposes to perform the work. The schedule shall separate the work into phases developed in cooperation with the Government. The schedule shall include the dates on which the Contractor contemplates starting and completing the salient elements of the work. The Contractor shall also specifically identify on each progress report, any apparent, anticipated or proposed deviation form the previously approved schedule.

1.6 REGULATIONS

The Contractor shall comply with all standard and special safety and fire regulations, including those in the Corps of Engineers Safety Manual, the American General Contractors Safety Manual, OSHA, and certain base regulations. Prior to the start of the work, the Contractor may be required to meet with the Contracting Officer to review specific safety and fire regulations.

1.7 TESTING

The contractor shall furnish all material testing and certifications as required by this contract. Any expense associated with the use of an independent testing agency, as may be required by this contract shall be provided unless otherwise specified.

SECTION 01 11 00.00 40 Page 3

1.8 WARRANTIES AND OPERATING INSTRUCTIONS

Warranties and operating instructions are required to be submitted directly to the Contracting Officer at the completion of the contract work. Four copies of all warranties and operating instructions shall be provided unless otherwise specified.

1.9 GOVERNMENT OCCUPANCY

The Government will occupy areas adjacent to the work site during construction. Contractor shall schedule and perform the work so as not to interfere with the Government's operations. The Contractor shall cooperate fully with the Government during construction operations to minimize conflicts and to facilitate Government usage.

1.10 BASE HOURS

Base operation hours are 7:00 a.m. to 5:00 p.m. daily (Monday through Friday), excluding federal holidays. Access to the base during other times must be requested in writing from the Contracting Officer and will be granted only for extenuating circumstances.

1.11 BASE ACCESS

Access onto and across the grounds shall be as directed by the Government.

Employee parking shall be as directed by the Contracting Officer. Also, the Government may impose restrictions regarding methods and points of contractor access in order to maintain orderly operation of the facility during the construction period.

1.12 TEMPORARY BARRICADES AND FENCES

Not required

1.13 TEMPORARY CONSTRUCTION FACILITIES

1.13.1 Contractor Office

Not required

1.13.2 Sanitary Facilities

The Contractor is required to furnish and maintain a temporary water closet or privy. The water closet/privy type and location will be approved by the Contracting Officer. The Contractor shall allow every person associated with the project use of the water closet/privy.

SECTION 01 11 00.00 40 Page 4

1.14 AVAILABILITY OF UTILITY SERVICES

The Contractor may use Government utilities in the vicinity of the project area. The Contractor shall not be wasteful of the Government utilities and the Government reserves the right to assess the Contractor for utility use upon discovery of negligence with respect to utility usage. All temporary lines shall be maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner prior to final acceptance of the construction.

1.15 UTILITY SERVICE INTERRUPTIONS

The Contractor shall submit written notification not less than 15 calendar days in accordance of each interruption of each utility and communication service to or within existing buildings and facilities being used by others. No single outage will exceed 4 hours unless approved in writing.

The time and duration of all outages will be coordinated and approved with the using agency by the Contracting Officer.

1.16 PERMITS

1.16.1 Digging Permit

To ensure personnel safety and utility safety when work is to be done below grade, it is the responsibility of the Contractor to obtain an on-base (AF IMT 103) digging permit and a GOPHER ONE digging permit. For an on-base digging permit the Contractor shall provide the Contracting Officer with not less than 10 calendar days written notice of the intent to perform digging or excavation work to allow the Government the opportunity to locate and mark its utilities which may interfere with the proposed work.

For a GOPHER ONE digging permit, the Contractor shall follow standard Minnesota State procedures.

1.16.2 MAC Public Works Permit

If any of the work affects property (buildings, facilities, utilities, etc.) belonging to the Metropolitan Airports Commission (MAC), the Contractor is responsible for obtaining a MAC Public Works Permit through Civil Engineering prior to starting the work.

1.16.3 Aerospace Clearances

MAC Aerospace Evaluation Application: If any of the work requires a crane, boom truck or any other type of equipment that will affect local aerospace;

the Contractor is responsible for obtaining prior clearance from MAC through Civil Engineering.

FAA Form 7460-1, Notice of Proposed Construction or Alteration: In addition to obtaining clearance from MAC, the Contractor shall also be required to ensure the necessary coordination and/or clearance is obtained for an approved FAA Form 7460-1 from the Federal Aviation Administration through Civil Engineering.

1.16.4 Free Zone Letter

Not required.

1.17 PROTECTION OF FACILITIES

The Contractor shall preserve and protect all structures, equipment, SECTION 01 11 00.00 40 Page 5 pavements and vegetation on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall repair or replace any damage resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. Any repair or replacement shall be accomplished at the expense of the Contractor and to the satisfaction of the Contracting Officer.

1.18 DD FORM 1394 CHECK LIST

Contractor shall complete and provide a completed DD Form 1394 check list upon the completion of the project. A copy of the DD Form 1394 check list is included in these specifications.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

-- End of Section --

SECTION 01 33 00 – PAGE 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Submittal

Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."

1.1.2 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections. Submittals are identified by SD numbers and titles as follows.

SD-01 Preconstruction Submittals

Submittals which are required prior to a notice to proceed on a new contract.

Submittals required prior to the start of the next major phase of the construction on a multi-phase contract. Schedules or tabular list of data or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work, submitted prior to contract notice to proceed or next major phase of construction.

Certificates of insurance. Surety bonds. List of proposed subcontractors.

List of proposed products. Construction Progress Schedule.

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work. Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged. Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project. Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies

SECTION 01 33 00 – PAGE 2

which are to be incorporated into the project and those which will be removed at conclusion of the work.

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports.

Daily logs and checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

Confined space entry permits.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Special requirements necessary to properly close out a construction contract. For example, Record Drawings, manufacturer's help and product lines necessary to maintain and install equipment. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

1.1.3 Approving Authority

Office or designated person authorized to approve submittal.

SECTION 01 33 00 – PAGE 3

1.1.4 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.3 PROCEDURES FOR SUBMITTALS

1.3.1 Reviewing, Certifying, Approving Authority

The 934th Civil Engineering Division shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements.

Approving authority on submittals is the Contracting Officer.

1.3.2 Constraints

a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.

b. Submittals shall be complete for each definable feature of work;

components of definable feature interrelated as a system shall be submitted at same time.

c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.

d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.

1.3.3 Scheduling

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.

b. Except as specified otherwise, allow a review period, beginning with receipt by approving authority, that includes at least 10 working days for submittals for Contracting Officer approval. Period of review for each resubmittal is the same as for initial submittal.

1.4 FORMAT OF SUBMITTALS

1.4.1 Transmittal Form

APPROVAL MUST BE OBTAINED FROM THE CONTRACTING OFFICER PRIOR TO INITIATING ANY

WORK WHICH INCLUDES MATERIAL FROM THIS LIST. All submittals shall be submitted to the Contracting Officer for approval. All submittals shall be accomplished by the use of the AF IMT 3000. All submittals except warranties and operating instructions, as noted below, shall be furnished for review no later than 10 calendar days after receipt of the Notice to Proceed, or at a time frame specified by the Contracting Officer. All submittals shall be submitted in THREE ORIGINAL COPIES, except for the AF Form 3000. This form will be submitted in one original and two copies with the attachments. The Contracting Officer shall return one copy of the same to the Contractor within 10 calendar days after receipt, or at a time frame specified by the Contracting Officer. The submittal shall be appropriately marked either APPROVED or DISAPPROVED, and may include additional comments. If submittals can not be made within 10 calendar days after receipt

SECTION 01 33 00 – PAGE 4

of the Notice to Proceed, or within a time frame specified by the Contracting Officer, the Contracting Officer shall be advised of the difficulty and of any extension of the time being requested.

1.4.2 Identifying Submittals

Identify submittals with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:

a. Project title and location.

b. Construction contract number.

c. Section number of the specification section by which submittal is required.

d. Submittal description (SD) number of each component of submittal.

e. When a resubmission, add alphabetic suffix on submittal description, for example, SD-10A, to indicate resubmission.

f. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other second tier Contractor associated with submittal.

g. Product identification and location in project.

1.4.3 Format for SD-02 Shop Drawings

a. Shop drawings shall not be less than 8 1/2 by 11 inches nor more than 30 by 42 inches.

b. Present 8 1/2 by 11 inches sized shop drawings as part of the bound volume for submittals required by section. Present larger drawings in sets.

c. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph entitled "Identifying Submittals."

d. Dimension drawings, except diagrams and schematic drawings; prepare drawings demonstrating interface with other trades to scale. Shop drawing dimensions shall be the same unit of measure as indicated on the contract drawings.

Identify materials and products for work shown.

e. Drawings shall include the nameplate data, size and capacity. Also include applicable federal, military, industry and technical society publication references.

1.4.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instruction

a. Present product data submittals for each section as a complete, bound volume. Include table of contents, listing page and catalog item numbers for product data.

b. Indicate, by prominent notation, each product which is being submitted;

indicate specification section number and paragraph number to which it pertains.

c. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project, with information and format as required for submission of SD-07 Certificates.

SECTION 01 33 00 – PAGE 5

e. Product data shall include the manufacturer's name, trade name, place of manufacture, and catalog model or number. Submittals shall also include applicable federal, military, industry and technical society publication references. Should manufacturer's data require supplemental information for clarification, the supplemental information shall be submitted as specified for SD-07 Certificates.

f. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations such as American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), and Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.

g. Submit manufacturer's instruction prior to installation.

1.4.5 Format of SD-04 Samples

a. Furnish samples in sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately same size as specified:

(1) Sample of Equipment or Device: Full size.

(2) Sample of Materials Less Than 2 by 3 inches: Built up to 8 1/2 by 11 inches.

(3) Sample of Materials Exceeding 8 1/2 by 11 inches: Cut down to 8

1/2 by 11 inches and adequate to indicate color, texture, and material variations.

(4) Sample of Linear Devices or Materials: 10 inch length or length to be supplied, if less than 10 inches. Examples of linear devices or materials are conduit and handrails.

(5) Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.

(6) Color Selection Samples: 2 by 4 inches.

b. Samples Showing Range of Variation: Where variations are unavoidable due to nature of the materials, submit sets of samples of not less than three units showing extremes and middle of range.

c. Reusable Samples: Incorporate returned samples into work only if so specified or indicated. Incorporated samples shall be in undamaged condition at time of use.

d. Recording of Sample Installation: Note and preserve the notation of area constituting sample installation but remove notation at final cleanup of project.

e. When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.

1.4.6 Format of SD-05 Design Data and SD-07 Certificates

a. Provide design data and certificates on 8 1/2 by 11 inches paper.

Provide a bound volume for submittals containing numerous pages.

1.4.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports

SECTION 01 33 00 – PAGE 6

a. Provide reports on 8 1/2 by 11 inches paper in a complete bound volume.

b. Indicate by prominent notation, each report in the submittal. Indicate specification number and paragraph number to which it pertains.

1.4.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout

Submittals

a. When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply Contractor's approval stamp to document, but to a separate sheet accompanying document.

1.5 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error which may exist.

After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.6 DISAPPROVED SUBMITTALS

The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" shall be given promptly to the Contracting Officer.

1.7 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

1.8 GENERAL

The Contractor shall make submittals as required by the specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list);

certifications; warranties; and other such required submittals. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby. Samples remaining upon completion of the work shall be picked up and disposed of in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.9 SCHEDULING

SECTION 01 33 00 – PAGE 7

Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently.

Certifications to be submitted with the pertinent drawings shall be so scheduled. Adequate time shall be allowed.

1.10 TRANSMITTAL FORM (AF IMT 3000)

The sample transmittal form (AF IMT 3000) attached to this section shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted.

Special care shall be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

-- End of Section –

Repair and Maintaion Aircraft Parking Apron

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

PART 1 GENERAL

1.1 REFERENCES

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization, (e.g. ASTM B 564 Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

1.2 ORDERING INFORMATION

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.

ACI INTERNATIONAL (ACI)

38800 Country Club Drive Farmington Hills, MI 48331 Ph: 248-848-3700 Fax: 248-848-3701 E-mail: bkstore@concrete.org Internet: http://www.concrete.org

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

444 North Capital Street, NW, Suite 249 Washington, DC 20001 Ph: 202-624-5800 Fax: 202-624-5806 E-Mail: info@aashto.org Internet: http://www.aashto.org

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

1800 East Oakton Street Des Plaines, IL 60018-2187 Ph: 847-699-2929 Fax: 847-768-3434 E-mail: customerservice@asse.org Internet: http://www.asse.org

ASTM INTERNATIONAL (ASTM)

100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9500 Fax: 610-832-9555

SECTION 01 42 00 Page 1

E-mail: service@astm.org Internet: http://www.astm.org

NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)

900 Spring Street Silver Spring, MD 20910 Ph: 301-587-1400 Fax: 301-585-4219 Internet: http://www.nrmca.org

U.S. ARMY CORPS OF ENGINEERS (USACE)

Order CRD-C DOCUMENTS from:

U.S. Army Engineer Waterways Experiment Station ATTN: Technical Report Distribution Section, Services Branch, TIC 3909 Halls Ferry Road Vicksburg, MS 39180-6199 Ph: 601-634-2664 Fax: 601-634-2388 E-mail: mtc-info@erdc.usace.army.mil Internet: http://www.wes.army.mil/SL/MTC/handbook.htm

Order Other Documents from:

USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.usace.army.mil/publications or http://www.hnd.usace.army.mil/techinfo/engpubs.htm

U.S. DEPARTMENT OF DEFENSE (DOD)

Directorate for Public Inquiry and Analysis Office of the Secretary of Defense (Public Affairs) Room 3A750 -- The Pentagon 1400 Defense Pentagon Washington, DC 20301-1400 Ph: 703-428-0711 E-mail: pia@hq.afis.asd.mil Internet: http://www.dod.gov

Order DOD Documents from:

National Technical Information Service (NTIS) 5285 Port Royal Road Springfield, VA 22161 Ph: 703-605-6585

FAX: 703-605-6900

E-mail: info@ntis.gov Internet: http://www.ntis.gov

Order Military Specifications, Standards and Related Publications from:

Department of Defense Single Stock Point for (DODSSP) Defense Automation and Production Service (DAPS) Building 4D 700 Robbins Avenue Philadelphia, PA 19111-5098

SECTION 01 42 00 Page 2

Ph: 215-697-2179 Fax: 215-697-1462 Internet: http://www.dodssp.daps.mil www.daps.dla.mil

- - - - - Detail Series Documents - - - - -

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

General Services Administration 1800 F Street, NW Washington, DC 20405 Ph: 202-501-1021 Internet: www.GSA.gov

Order from:

General Services Administration Federal Supply Service Bureau 1941 Jefferson Davis Highway Arlington, VA 22202 Ph: 703-605-5400 Internet: http://apps.fss.gsa.gov/pub/fedspecs/index.cfm

- - - - - Commercial Item Description Documents - - - - -

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

8601 Adelphi Road College Park, MD 20740-6001 Ph: 866-272-6272 Fax: 301-837-0483 Internet: http://www.archives.gov

Order documents from:

Superintendent of Documents U.S.Government Printing Office (GPO) 732 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov

-- End of Section --

SECTION 01 42 00 Page 3

SECTION 01 57 20.00 10 – PAGE 1

SECTION 01 57 20.00 10 ENVIRONMENTAL PROTECTION

PART 1 GENERAL

1.1 ATTACHMENT

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

33 CFR 328 Definitions 40 CFR 68 Chemical Accident Prevention Provisions 40 CFR 260 Hazardous Waste Management System: General 40 CFR 261 Identification and Listing of Hazardous Waste 40 CFR 262 Standards Applicable to Generators of Hazardous Waste 40 CFR 279 Standards for the Management of Used Oil 40 CFR 302 Designation, Reportable Quantities, and Notification 40 CFR 355 Emergency Planning and Notification 49 CFR 171 - 178 Hazardous Materials Regulations

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2003) Safety -- Safety and Health Requirements

WETLAND MANUAL Corps of Engineers Wetlands Delineation Manual Technical Report Y-87-1

1.3 DEFINITIONS

1.3.1 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.

1.3.2 Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction.

The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.3.3 Contractor Generated Hazardous Waste

Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet he definition of a hazardous waste. These waste

SECTION 01 57 20.00 10 – PAGE 2

streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.

1.3.4 Hazardous Material

Hazardous Material is defined as any item or chemical, which is a "health hazard" or "physical hazard" as defined by OSHA in 29 CFR

1910.1200 which include the following:

• Chemicals which are carcingogens, toxic or highly toxic agents, reproductive toxins, irritants, corrosives, sensitizers, hepatoxins, nephrotoxins, neourtoxins, agents which act on the hematopoietic system, and agents which damage the lungs, skin, eyes, or mucuos membranes;

• Chemicals, which are combustible liquids, compressed gases, explosives, flammable liquids, flammable solids, organic peroxides, oxidizers, pyrophorics, unstable (reactive) or water-reactive;

• Chemicals, which in the course of normal handling, use, or storage operations may produce or release dusts, gases, fumes, vapors, mists or smoke which have any of the above characteristics.

1.3.5 Historical, Archaeological, and Cultural Resources

Historical, archaeological, and cultural resources include any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, pavings, wall, or other constructed features; and any indication of agricultural or other historical human activities.

1.3.6 Land Application for Discharge Water

The term "Land Application" for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur. Land Application must be in compliance with all applicable Federal, State, and local laws and regulations.

1.3.7 Pesticide

Pesticide is defined as any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant. All pesticides are also considered hazardous materials.

1.3.8 Surface Discharge

SECTION 01 57 20.00 10 – PAGE 3

The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "waters of the United States" and would require a permit to discharge water from the governing agency.

1.3.9 Waters of the United States

All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328.

1.3.10 Wetlands

Wetlands means those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with WETLAND MANUAL.

1.4 GENERAL REQUIREMENTS

The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract. The Contractor shall comply with all applicable environmental Federal, State, and local laws and regulations. The Contractor shall be responsible for any delays resulting from failure to comply with environmental laws and regulations.

1.5 SUBCONTRACTORS

The Contractor shall ensure compliance with this section by sub-contractors.

1.6 PAYMENT

No separate payment will be made for work covered under this section.

The Contractor shall be responsible for payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor. All costs associated with this section must be included in the contract price. The Contractor shall be responsible for payment of all fines/fee for violation or non-compliance with Federal, State, Regional and local laws and regulations.

1.7 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SECTION 01 57 20.00 10 – PAGE 4

SD-01 Preconstruction Submittals

Material Safety Data Sheet (MSDS); G

1.8 ENVIRONMENTAL PROTECTION PLAN

Not Used.

1.9 PROTECTION FEATURES

This paragraph supplements Section 01 11 00.00 40, Subsection 1.19 PROTECTION OF FACILITIES. Prior to start of any onsite construction activities, the Contractor and the Contracting Officer will make a joint condition survey. Immediately following the survey, the Contractor shall prepare a brief report including a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. This survey report will be signed by both the the Contractor and the Contracting Officer upon mutual agreement as to its accuracy and completeness. The Contractor must protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the work under the contract.

1.10 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS

Any deviations from the drawings, plans and specifications, requested by the Contractor and which may have an environmental impact, will be subject to approval by the Contracting Officer and may require an extended review, processing, and approval time. The Contracting Officer reserves the right to disapprove alternate methods, even if they are more cost effective, if the Contracting Officer determines that the proposed alternate method will have an adverse environmental impact.

1.11 NOTIFICATION

The Contracting Officer will notify the Contractor in writing of any observed noncompliance with Federal, State or local environmental laws or regulations, permits, and other elements of the Contractor's Environmental Protection plan. After receipt of such notice, the Contractor will inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the contract, or in accordance with the Federal Acquisition Regulation or Federal Law.

PART 2 PRODUCTS (NOT USED)

SECTION 01 57 20.00 10 – PAGE 5

3.1 ENVIRONMENTAL PERMITS, NOTICES, REVIEWS, AND/OR APPROVALS

The Contractor shall be responsible for obtaining and complying with all environmental permits, and providing all notices and requests for review or approval, required by Federal, State, Regional, and local environmental laws and regulations. The following is a listing for permits, notices, reviews, and/or approvals which may be required for this project. This listing and requirements are not to be considered all-inclusive by the Contractor, but is provided as information that may be used in successfully accomplishing the environmental compliance.

3.1.1 NPDES Permit for Minnesota Construction Activities

The State of Minnesota, Pollution Control Agency has authority for the National Pollutant Discharge Elimination System (NPDES) program. For construction activities which result in disturbance of one acre of land or more, coverage under Minnesota's Storm Water General Permit for Construction Activities (Permit No. MN R100001) is required. The Contractor and the Installation shall be co-permitees. The permit application must be mailed at least seven (7) days prior to construction.

The Contractor shall be responsible for complying with Specification

SECTION 01 57 23.00 10 NPDES PERMIT REQUIREMENTS FOR STORM WATER

DISCHARGES FROM CONSTRUCTION SITES.

3.1.2 Expansion of Domestic Wastewater Sewer Lines

Not Used.

3.1.3 Water Lines

Not Used.

3.1.4 Hydrostatic Testing

Not Used.

3.2 LAND RESOURCES

The Contractor shall confine all activities to areas defined by the drawings and specifications. Identify any land resources to be preserved within the work area prior to the beginning of any construction. Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and land forms without approval, except in areas indicated on the drawings or specified to be cleared. Ropes, cables, or guys will not be fastened to or attached to any trees for anchorage unless specifically authorized. Provide effective protection for land and vegetation resources at all times, as defined in the following subparagraphs. Stone, soil, or other materials displaced into un-cleared areas shall be removed by the Contractor.

3.2.1 Work Area Limits

SECTION 01 57 20.00 10 – PAGE 6

Prior to commencing construction activities, the Contractor shall mark the areas that need not be disturbed under this contract. Isolated areas within the general work area which are not to be disturbed shall be marked or fenced. Monuments and markers shall be protected before construction operations commence. Where construction operations are to be conducted during darkness, any markers shall be visible in the dark. The Contractor's personnel shall be knowledgeable of the purpose for marking and/or protecting particular objects.

3.2.2 Landscape

Trees, shrubs, vines, grasses, land forms and other landscape features indicated and defined on the drawings to be preserved must be clearly identified by marking, fencing, or wrapping with boards, or any other approved techniques. The Contractor shall restore landscape features damaged or destroyed during construction operations outside the limits of the approved work area.

3.2.3 Erosion and Sediment Controls

The Contractor shall be responsible for providing erosion and sediment control measures in accordance with Federal, State, and local laws and regulations, and as identified in the Erosion and Sediment Control Plan or the Storm Water Pollution Prevention Plan for the site. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. The Contractor shall construct or install, and maintain in operable condition, temporary and permanent erosion and sediment control best management practices (BMPs). BMPs may include, but not be limited to, vegetation cover, stream bank stabilization, silt fences, construction of terraces, interceptor channels, and sedimentation basins. Any temporary measures shall be removed after the area has been stabilized.

3.2.4 Fuel Contaminated Soil and Water

Not Used.

3.2.5 Contractor Facilities and Work Areas

The Contractor's field offices, staging areas, stockpile storage, and temporary buildings shall be placed in areas designated on the drawings or as directed by the Contracting Officer. Temporary movement or relocation of Contractor facilities shall be made only when approved.

Erosion and sediment controls shall be provided for on-site borrow and spoil areas to prevent sediment from entering nearby waters. Temporary excavation and embankments for plant and/or work areas shall be controlled to protect adjacent areas.

3.3 WATER RESOURCES

The Contractor shall monitor all water areas affected by construction

SECTION 01 57 20.00 10 – PAGE 7

activities to prevent pollution of surface and ground waters. Toxic or hazardous chemicals shall not be applied to soil or vegetation unless otherwise indicated. All water areas affected by construction activities shall be monitored by the Contractor. For construction activities immediately adjacent to impaired surface waters, the Contractor must be capable of quantifying sediment or pollutant loading to that surface water when required by State or Federally issued Clean Water Act permits.

3.3.1 Wetlands

The Contractor shall not enter, disturb, destroy, or allow discharge of contaminants into any wetlands except as authorized herein.

Authorization to enter specific wetlands identified will not relieve the Contractor from any obligation to protect other wetlands within, adjacent to, or in the vicinity of the construction site and associated boundaries.

3.3.2 Waste Water

Disposal of waste water shall be as specified below.

a. Waste water from construction activities, such as onsite material processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc. shall not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants.

The Contractor shall dispose of the construction related waste water off-Government property in accordance with all Federal, State, Regional and Local laws and regulations.

• For discharge of ground water, the Contractor shall obtain a State or Federal permit specific for pumping and discharging ground water prior to surface discharging.

• Water generated from the flushing of lines after disinfection or disinfection in conjunction with hydrostatic testing shall be land applied in accordance with all Federal, State, and local laws and regulations for land application or discharged into the sanitary sewer with prior approval and/or notification to the Waste Water Treatment Plant's Operator.

3.4 AIR RESOURCES

Equipment operation, activities, or processes will be in accordance with all Federal and State air emission and performance laws and standards.

3.4.1 Particulates

Dust particles; aerosols and gaseous by-products from construction activities; and processing and preparation of materials, such as from asphaltic batch plants; must be controlled at all times, including weekends, holidays and hours when work is not in progress. Maintain excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and other work areas within or outside the project boundaries free from particulates which would

SECTION 01 57 20.00 10 – PAGE 8

cause the Federal, State, and local air pollution standards to be exceeded or which would cause a hazard or a nuisance. Sprinkling, chemical treatment of an approved type, baghouse, scrubbers, electrostatic precipitators or other methods will be permitted to control particulates in the work area. Sprinkling, to be efficient, must be repeated to keep the disturbed area damp at all times. Provide sufficient, competent equipment available to accomplish these tasks. Perform particulate control as the work proceeds and whenever a particulate nuisance or hazard occurs. Comply with all State and local visibility regulations.

3.4.2 Odors

Odors from construction activities must be controlled at all times. The odors shall not cause a health hazard and shall be in compliance with State regulations and/or local ordinances.

3.4.3 Sound Intrusions

The Contractor shall keep construction activities under surveillance and control to minimize environment damage by noise. The Contractor shall comply with the provisions of the State of Minnesota rules.

3.4.4 Burning

Burning is prohibited on the Government premises.

3.5 HAZARDOUS MATERIALS MANAGEMENT AND WASTE DISPOSAL

Disposal of wastes shall be as directed below, unless otherwise specified in other sections and/or shown on the drawings.

3.5.1 Hazardous Material

The Government requires the identification and accurate tracking of all hazardous materials used for work performed on Government property.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .