Site Visit Questions & Responses – SET #2

FA6633-15-B-0008/QJKL 14-0018

Repair Office Areas, Bldg 801, Minneapolis ARS, MN

SET #2 – 23 July 2015

1. QUESTION: Has there been any hazardous materials testing done in this area, specifically the paint and floor tiles?

RESPONSE: We have not done any testing, however we did not run into any hazardous materials when doing the other portion of this space.

2. QUESTION: The mechanical drawings show a return air plenum ceiling, there is an existing wood ceiling, is the ceiling getting fire rated or does the return need to be ducted?

RESPONSE: Because the area between the new ceiling and roof deck is going to remain sprinklered, a fire rated coating is not required by code.

23 July 2015 Page 1