3. Drawings_Security Cameras.pdf

PDF 9 MB Posted

Attached to
Dorm Camera Refresh
Solicitation number
FA568524Q0004
Issued by

About this file

This document is a solicitation for a Request for Quotation (RFQ) to install a security camera system in dormitory facilities at Incirlik Air Base in Turkey. The project includes upgrading existing camera systems and installing new cameras in several dorm buildings. Key details include:

The solicitation is being issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa. Funds are not currently available, so no award will be made until funding is secured. The government reserves the right to cancel the solicitation at any time. The contract will be for commercial items under FAR Part 12. The solicitation includes drawings, notes, and legends detailing the existing and proposed camera system. Contractors will need to submit installation plans for the new camera systems in each building. The work must be coordinated with dorm management and adhere to base safety and environmental requirements.

View the file

Other files

File Type Posted
39 Combo - Dorm Cameras - FY24.pdf PDF
1. List of Materials.xlsx XLSX spreadsheet
2. Statement of Work - Dorm Camera Upgrade.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INCIRLIK AIR BASE

39 AIR BASE WING

LJYC. 20-1122

NOTE:

NOT:

INSTALL SECURITY CAMERA DORM FACILITIES

NN

FOR OFFICIAL USE ONLY

2 3 4

D

C

B

A

1 2 3 4

D

C

B

A

FOR OFFICIAL USE ONLY

AutoCAD SHX Text

KURECIK

AutoCAD SHX Text

ERHAC

AutoCAD SHX Text

MALATYA

AutoCAD SHX Text

ADIYAMAN

AutoCAD SHX Text

KAHRAMANMARAS

AutoCAD SHX Text

GAZIANTEP

AutoCAD SHX Text

ADANA

AutoCAD SHX Text

INCIRLIK

AutoCAD SHX Text

KOPRUKOY

AutoCAD SHX Text

KARATAS

AutoCAD SHX Text

TURKIYE

AutoCAD SHX Text

YUMURTALIK

AutoCAD SHX Text

MEDITERRANEAN

AutoCAD SHX Text

SEA

AutoCAD SHX Text

AK DENIZ

AutoCAD SHX Text

ISKENDERUN

AutoCAD SHX Text

ANTAKYA

AutoCAD SHX Text

PROJECT SITE

AutoCAD SHX Text

PROJE YERI

AutoCAD SHX Text

NOT TO SCALE /

AutoCAD SHX Text

KEY PLAN /

AutoCAD SHX Text

INCIRLIK HAVA USSU

AutoCAD SHX Text

39. HAVA USSU FILOSU

AutoCAD SHX Text th

AutoCAD SHX Text

PROJE

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

GC1 2 OF 29

AutoCAD SHX Text

SHEET NAME.

AutoCAD SHX Text

PROJECT INDEX

AutoCAD SHX Text

TITLE SHEET / PROJECT INDEX

AutoCAD SHX Text

SITE PLAN AND NOTES

AutoCAD SHX Text

OLCEKSIZ

AutoCAD SHX Text

ANAHTAR PLAN

AutoCAD SHX Text

NOT TO SCALE /

AutoCAD SHX Text

OLCEKSIZ

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

/YORESEL HARITA

AutoCAD SHX Text

NO.

AutoCAD SHX Text

T1 1 OF 29

AutoCAD SHX Text US AIR FORCE SIGN-OFF ON THESE DRAWINGS DOES NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY FOR ANY ERRORS OR OMISSIONS ON THESE DRAWINGS NOR FROM RESPONSIBILITY FOR COMPLYING WITH THE REQUIREMENTS OF THIS CONTRACT; INCLUDING ALL APPLICABLE CODES AND STANDARDS.

AutoCAD SHX Text AMERIKAN HAVA KUVVETLERI`NIN BU CIZIMLERI IMZALAMIS OLMASI MUTEAHHITIN CIZIMLERDEKI HATALARI VEYA EKSIKLIKLERI TAMAMLAMA GOREVINI AZALTMADIGI GIBI GECERLI KODLAR VE STANDARTLAR DA DAHIL OLMAK UZERE KONTRATIN SARTLARINA UYMA SORUMLULUGUNU DA ORTADAN KALDIRMAZ.

AutoCAD SHX Text

PROJE YERI

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

DORM BINALARINA GUVENLIK KAMERASI INSAASI

AutoCAD SHX Text

GC2 3 OF 29

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

SHEET NAME.

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

SHEET NAME.

AutoCAD SHX Text

E1 4 OF 29

AutoCAD SHX Text

NOTES AND LEGEND

AutoCAD SHX Text

E2 5 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #880

AutoCAD SHX Text

E3 6 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #882

AutoCAD SHX Text

E4 7 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #885

AutoCAD SHX Text

E5 8 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #892

AutoCAD SHX Text

E6 9 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #894

AutoCAD SHX Text

E7 10 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #896

AutoCAD SHX Text

E8 11 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #960

AutoCAD SHX Text

E9 12 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #962

AutoCAD SHX Text

E10 13 OF 29

AutoCAD SHX Text

EXISTING CAMERA SYSTEM PLANS, BUILDING #964

AutoCAD SHX Text

E11 14 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #880

AutoCAD SHX Text

E12 15 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #882

AutoCAD SHX Text

E13 16 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #885

AutoCAD SHX Text

E14 17 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #892

AutoCAD SHX Text

E15 18 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #894

AutoCAD SHX Text

E16 19 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #896

AutoCAD SHX Text

E17 20 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #960

AutoCAD SHX Text

E18 21 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #962

AutoCAD SHX Text

E19 22 OF 29

AutoCAD SHX Text

NEW CAMERA SYSTEM PLANS, BUILDING #964

AutoCAD SHX Text

E20 23 OF 29

AutoCAD SHX Text

EXISTING AND NEW CONDITION CCTV SYSTEM RISER DIAGRAM

AutoCAD SHX Text

E21 24 OF 29

AutoCAD SHX Text

EXISTING AND NEW CCTV SYSTEM COMPONENT SCHEDULES

AutoCAD SHX Text

E22 25 OF 29

AutoCAD SHX Text

EXISTING EPDP PANEL DETAILS

AutoCAD SHX Text

E23 26 OF 29

AutoCAD SHX Text

SINGLE LINE DIAGRAMS

AutoCAD SHX Text

E24 27 OF 29

AutoCAD SHX Text

E25 28 OF 29

AutoCAD SHX Text

E26 29 OF 29

AutoCAD SHX Text

NEW CCTV SYSTEM RISER DIAGRAM, BUILDINGS#885,894,896

AutoCAD SHX Text

NEW CCTV SYSTEM RISER DIAGRAM, BUILDINGS#880,882

AutoCAD SHX Text

NEW CCTV SYSTEM RISER DIAGRAM, BUILDINGS#892,960,962,964

AutoCAD SHX Text

CHECKED BY :

AutoCAD SHX Text

39 CIVIL ENGINEER SQUADRON

AutoCAD SHX Text

39 CIVIL ENGINEER SQUADRON

AutoCAD SHX Text

BASE CIVIL ENGINEER

AutoCAD SHX Text

INCIRLIK AIR BASE TURKIYE

AutoCAD SHX Text

TH

AutoCAD SHX Text

DRAWN BY :

AutoCAD SHX Text

DESIGNED BY :

AutoCAD SHX Text

DRAWING CODE :

AutoCAD SHX Text

DESIGN FILE NO :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

PLOT SCALE :

AutoCAD SHX Text

REVISION :

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

MARK

AutoCAD SHX Text

SHEET

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text G

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text Q

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

INSTALL SECURITY CAMERA DORM FACILITIES

AutoCAD SHX Text

PROJECT NO: LJYC 20-1122

AutoCAD SHX Text

AUG '20

AutoCAD SHX Text

DORM BINALARINA GUVENLIK KAMERASI INSAASI

AutoCAD SHX Text

OF 29

AutoCAD SHX Text

A/E FIRM/CONTRACTOR

AutoCAD SHX Text

3 LINES

AutoCAD SHX Text

PROVIDED

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

AutoCAD SHX Text

TITLE SHEET / PROJECT INDEX

AutoCAD SHX Text

NUH MERZIFONLUOGLU

AutoCAD SHX Text

SAIT SEVGENAY

AutoCAD SHX Text

TITLE

AutoCAD SHX Text

35% SUBMITTAL AUG '20

T

H

S

A

V

E

U

S

K

R

D

G

A

Z

I

A

N

T

E

P

E

R

C

E

SITE PLAN

VAZIYET PLANI

PROJECT LOCATION

PROJE YERI

SAFETY NOTES:

IS GUVENLIGI NOTLARI:

GEOBASE & DRAFTING NOTES:

GEOBASE VE CIZIM NOTLARI:

GENERAL ENVIRONMENTAL NOTES: GENEL CEVRE NOTLARI:

FOR OFFICIAL USE ONLY

2 3 4

D

C

B

A

1 2 3 4

D

C

B

A

FOR OFFICIAL USE ONLY

N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE / OLCEK: 1:2000

AutoCAD SHX Text

1. ALL GROUND ADJACENT TO WORK AREAS WILL BE KEPT FREE OF HAZARDOUS ALL GROUND ADJACENT TO WORK AREAS WILL BE KEPT FREE OF HAZARDOUS MATERIALS,TRASH, WEEDS. UNGUARDED PITS, OPENING OR OBSTACLES. ALL OPEN DRAINAGE DITCHES THAT PRESENT A HAZARD WILL BE CLEARLY IDENTIFIED IN THE DAYTIME, GUARDED BY FENCES OR BARRIERS AND ILLUMINATED OR MARKED WITH WARNING FLASHERS AT NIGHT. ALL CONSTRUCTION WORK WILL BE CLEARLY IDENTIFIED BY SIGNS THAT CAN BE READ FROM AT LEAST 15 METERS, IN ADDITION TO BARRIERS MARKED WITH LIGHT REFLECTIVE MATERIALS. ILLUMINATION OR WARNING FLASHERS WILL ALSO BE USED FOR EASY SIGHTING AFTER DARK. 2. THE WALLS AND FACES OF EXCAVATIONS AND TRENCHES OVER 1.50 METER, THE WALLS AND FACES OF EXCAVATIONS AND TRENCHES OVER 1.50 METER, WHERE WORKERS MAY BE EXPOSED TO DANGER, WILL BE GUARDED BY A SHORING SYSTEM, SLOPING OF THE GROUND OR SOME OTHER EQUIVALENT MEANS. TRENCHES LESS THAN 1.50 METER DEEP WITH HAZARDOUS SOIL CONDITIONS WILL ALSO BE EFFECTIVELY PROTECTED. TOOLS, EQUIPMENT AND EXCAVATED MATERIAL WILL BE KEPT 0.60 METER OR MORE FORM THE LIP OF THE TRENCH. WHERE EMPLOYEES ARE REQUIRED TO BE IN OR WORK IN TRENCHES 1.20 METER DEEP OR MORE, AN ADEQUATE MEANS OF EXIT SUCH AS LADDERS OR STEPS SHALL BE PROVIDED (WITHIN 7.50 METER OF TRAVEL) AND USED. DAILY INSPECTIONS WILL BE MADE OF TRENCHES AND EXCAVATIONS BY THE SUPERVISOR IN CHARGE TO ENSURE THERE ARE ADEQUATE SLOPES, SHORING AND BRACING AND NO EVIDENCE OF POSSIBLE SLIDES OR CAVEINS. WORKERS EXPOSED TO TRAFFIC SHALL BE IN A BRIGHT REFLECTIVE VEST. 3. EXISTING AT/FP BOLLARDS SHALL ALWAYS REMAIN. EXISTING AT/FP BOLLARDS SHALL ALWAYS REMAIN.

AutoCAD SHX Text

1. CALISMA ALANLARI VE CIVARI ZARARLI MADDELERDEN COP VE YABANI OTLARDAN CALISMA ALANLARI VE CIVARI ZARARLI MADDELERDEN COP VE YABANI OTLARDAN ARINDIRILACAKTIR. KORUNMAYA ALINMAMIS CUKURLAR, BOSLUKLAR VEYA MADDELER VE TUM ACIK DRENAJ KANALLARI GUNDUZLERI ACIKCA ISARETLENECEK, CITLERLE VEYA BARIYERLERLE CEVRILECEK VE GECELERI AYDINLATILACAK VEYA UYARICI FLASORLERLE ISARETLENECEKTIR.TUM INSAAT ISLERI 15 METREDEN OKUNABILECEK SEKILDE ACIK OLARAK ISARETLERLE BELIRTILECEKTIR, BARIYERLERE ILAVE OLARAK ISIK YANSITICI MALZEMELERLE ISARETLENECEKTIR. KARANLIKTA KOLAY GORUS ICIN AYDINLATMA VEYA UYARI FLASORLERI KULLANILACAKTIR. 2. KAZILARIN VE HENDEKLERIN ISCILERI TEHLIKEYE DUSURECEK 1.50 METREDEN DERIN KAZILARIN VE HENDEKLERIN ISCILERI TEHLIKEYE DUSURECEK 1.50 METREDEN DERIN DUVARLARI VE YUZLERI, IKSA SISTEMLERI, EGIMLI KAZI VEYA DIGER BENZER METODLARLA KORUNACAKTIR. UYGUN OLMAYAN ZEMIN KOSULLARINDA 1.50 METREDEN AZ HENDEKLERDE KORUNACAKTIR. ALETLER, EKIPMAN VE KAZI MALZEMESI HENDEK SINIRINDAN 0.60 METRE VEYA DAHA FAZLA MESAFEDE TUTULACAKTIR.1.20 METREDEN DERIN HENDEKLERDE ISCILER CALISIRKEN MERDIVEN VE BASAMAK GIBI UYGUN CIKISLAR (7.50 METRE ULASIM MESAFESINDEN) SAGLANACAK VE KULLANILACAKTIR. GOREVLI BIR YETKILI HER GUN HENDEK VE KAZILARDA UYGUN SEV, IKSA VE DESTEKLEME OLDUGUNU VE MUHTEMEL BIR KAYMA VEYA COKUNTU BELIRTISI OLMADIGINI KONTROL EDECEKTIR. TRAFIGE ACIK ALANLARDA CALISAN ISCILER ACIK VE YANSITICI YELEK GIYECEKTIR. 3. MEVCUT AT/FP BARIYERLERI DAIMA YERINDE DIKILI OLACAKTIR.MEVCUT AT/FP BARIYERLERI DAIMA YERINDE DIKILI OLACAKTIR.

AutoCAD SHX Text

1. CONTRACTOR SHALL PROVIDE AND SUBMIT GEOSPATIAL DATA FOR NEW CONTRACTOR SHALL PROVIDE AND SUBMIT GEOSPATIAL DATA FOR NEW INSTALLATIONS. COORDINATING WITH THE GEOBASE MANAGER TO OBTAIN RECENT GEOSPATIAL DATA FORMAT. 2. TOPOGRAPHIC SURVEYS SHALL BE CONDUCTED USING GPS SURVEY GRADE TOPOGRAPHIC SURVEYS SHALL BE CONDUCTED USING GPS SURVEY GRADE EQUIPMENT. DATUM SHALL BE IN WGS84, 36N AND ORTOMETRIC ELEVATION FORMAT. OPTICAL TOTAL STATION SURVEY EQUIPMENT SHALL BE USED WHERE SATELLITE SIGNALS ARE NOT AVAILABLE (E.G. BESIDE BUILDINGS, UNDER TREES, ETC.). 3. CONTRACTOR SHALL GPS SURVEY ALL CROSSING UTILITIES THAT ARE ENCOUNTERED CONTRACTOR SHALL GPS SURVEY ALL CROSSING UTILITIES THAT ARE ENCOUNTERED WHILE TRENCHING AND EXCAVATING ON THIS PROJECT. GEODATABASE SHALL CONTAIN THE TABLE A ENTITIES, ATTRIBUTES, AND DOMAIN VALUES FOR UTILITY FEATURES AND THE GPS DATA COLLECTOR SETUP PROPERTIES LISTED IN CONTRACT DOCUMENT “GEOSPATIAL DATA REQUIREMENTS INCIRLIK AB UPDATED GEOSPATIAL DATA REQUIREMENTS INCIRLIK AB UPDATED PDF”. . 4. CONTRACTOR SHALL PREPARE AND FURNISH DRAWINGS TO SHOW THE LAYOUT OF CONTRACTOR SHALL PREPARE AND FURNISH DRAWINGS TO SHOW THE LAYOUT OF THE COMPLETE PROJECT AND TO CLEARLY INDICATE THE EXTENT, TYPE AND DETAILED REQUIREMENTS FOR ALL RELATED WORK. DRAWINGS SHALL BE PREPARED TO COVER ALL EXISTING AND NEW CIVIL WORKS AND APPROPRIATE SDSFIE LAYERS SHALL BE USED. 5. DIMENSIONS AND ELEVATIONS SHALL BE EXPRESSED IN METRIC UNITS. ALL TEXT DIMENSIONS AND ELEVATIONS SHALL BE EXPRESSED IN METRIC UNITS. ALL TEXT AND NOTES SHALL BE IN BOTH THE ENGLISH AND TURKISH LANGUAGES - ENGLISH PRECEDING TURKISH. 6. THE CONTRACTOR SHALL BE PROVIDED THE EXISTING DRAWINGS RELATED TO THE THE CONTRACTOR SHALL BE PROVIDED THE EXISTING DRAWINGS RELATED TO THE PROJECT WHEN PRACTICAL AND APPROVED BY BASE CIVIL ENGINEERING. SUCH DRAWINGS ARE FOR GENERAL INFORMATION PURPOSES ONLY AND SHALL NOT BE RELIED UPON TO PREPARE ANY OF THE DRAWINGS REQUIRED WITHOUT COMPLETE AND THOROUGH FIELD VERIFICATION BY CONTRACTOR. 7. CONTRACTOR SHALL UPDATE EXISTING GOVERNMENT DRAWINGS INCUDING AS BUILT CONTRACTOR SHALL UPDATE EXISTING GOVERNMENT DRAWINGS INCUDING AS BUILT CONDITIONS IN AUTOCAD FORMAT IN ACCORDANCE WITH SDSFIE STANDARDS AND PROVIDE SOFT COPIES IN COMPACT DISC BESIDE THE AS-BUILT DRAWINGS AND SUBMIT REQUIRED DOCUMENTATION FOR CLOSE-OUT PROCEDURE.

AutoCAD SHX Text

1. MUTEAHHIT GEOBASE MUDURU ILE ILETISIME GECIP GUNCEL COGRAFI MEKANSAL MUTEAHHIT GEOBASE MUDURU ILE ILETISIME GECIP GUNCEL COGRAFI MEKANSAL BILGI FORMATINI ALARAK, YENI YAPILAN ISLER ICIN COGRAFI MEKANSAL BILGILERI TEMIN EDIP IDAREYE SUNACAKTIR . 2. TOPOGRAFIK CALISMALAR GPS CIHAZI KULLANILARAK YAPILACAKTIR. BAZ WGS84, TOPOGRAFIK CALISMALAR GPS CIHAZI KULLANILARAK YAPILACAKTIR. BAZ WGS84, 36N VE ORTOMETRIK YUKSEKLIK FORMATINDA OLACAK. UYDU SINYALININ ALINMADIGI DURUMLARDA (ORNEGIN BINA KENARI, AGAC ALTI...) OPTIK TOPOGRAFIK EKIPMAN KULLANILACAKTIR. 3. MUTEAHHIT KAZI HATTINDAN GECEN BUTUN ALTYAPI HATLARININ GPS OKUMALARINI MUTEAHHIT KAZI HATTINDAN GECEN BUTUN ALTYAPI HATLARININ GPS OKUMALARINI YAPACAKTIR. COGRAFI VERITABANI, ALTYAPILARIN TUM TABLO BILGILERINI VE KONTRATTA BELIRTILEN GPS CIHAZI AYARLARINI ICERECEKTIR. 4. MUTEAHHIT TUM PROJENIN YERLESIM PLANLARINI VE IS ILE ILGILI DETAYLARI, MUTEAHHIT TUM PROJENIN YERLESIM PLANLARINI VE IS ILE ILGILI DETAYLARI, ICERIGINI VE TIPINI ACIKCA BELIRTEN CIZIMLERI HAZIRLAYIP TEDARIK EDECEKTIR. CIZIMLER, MEVCUT VE YENI INSAAT ISLERININ HEPSINI KAPSAYACAK VE UYGUN SDSFIE KATMANLARI KULLANILACAKTIR. 5. OLCU VE YUKSEKLIKLERDE METRIK BIRIM KULLANILACAKTIR. TUM YAZILAR VE OLCU VE YUKSEKLIKLERDE METRIK BIRIM KULLANILACAKTIR. TUM YAZILAR VE NOTLAR ONCE INGILIZCE VE ARDINDAN TURKCE OLARAK HER IKI DILDE SAGLANACAKTIR. 6. MUTEAHHITE, IHTIYACI OLMASI DURUMUNDA US INSAAT BIRIMININ ONAYI ILE MEVCUT MUTEAHHITE, IHTIYACI OLMASI DURUMUNDA US INSAAT BIRIMININ ONAYI ILE MEVCUT VE GEREKLI TUM CIZIMLER SAGLANACAKTIR. BU CIZIMLER GENEL BILGILENDIRILME AMACLI OLUP MUTEAHHIT TARAFINDAN SAHA ETUDU VE DOGRULAMASI YAPILMADAN GEREKLI CIZIMLERIN HAZIRLANMASINDA KULLANILMAYACAKTIR. 7. MUTEAHHIT MEVCUT HUKUMET CIZIMLERINI NIHAI DURUMU ICERECEK SEKILDE MUTEAHHIT MEVCUT HUKUMET CIZIMLERINI NIHAI DURUMU ICERECEK SEKILDE AUTOCAD FORMATINDA VE SDSFIE STANDARDINA UYGUN OLARAK GUNCELLEYECEK VE ELEKTRONIK KOPYASINI KOMPAKT DISK ILE IS BITIMI CIZIMLERIYLE BIRLIKTE PROJE KAPANMASI ASAMASINDA SUNACAKTIR.

AutoCAD SHX Text

1. ASBEST ICEREN MALZEMELER OZON TABAKASINI DELEN SINIF 1 VE SINIF II KIMYEVI MADDELER, KURSUN BAZLI BOYALAR, ASBEST ICEREN MALZEMELER OZON TABAKASINI DELEN SINIF 1 VE SINIF II KIMYEVI MADDELER, KURSUN BAZLI BOYALAR, PCB, PCT VE PBB VE EPA 17 DOKUMANINDA BELIRTILEN KIMYEVI MADDELER BU PROJENIN KAPSAMINDA KESINLIKLE KULLANILMAYACAKTIR. 2. BU PROJE KAPSAMINDA KULLANILACAK OLAN BUTUN TEHLIKELI MADDELERLE ILGILI BILGILERIN EESOH-MIS SISTEMINE BU PROJE KAPSAMINDA KULLANILACAK OLAN BUTUN TEHLIKELI MADDELERLE ILGILI BILGILERIN EESOH-MIS SISTEMINE ONCEDEN GIRISLERI YAPILMALIDIR. SDS (GUVENLIK BILGI FORMLARI) TURKCE VE INGILIZCE OLARAK SISTEME YUKLENMELIDIR. TEHLIKELI MADDELER ANCAK EESOH-MIS SISTEMINDE ONAY ISLEMLERININ TAMAMLANMASINDAN SONRA KULLANILABILIR. 3. BU PROJE KAPSAMINDA KULLANILACAK BUTUN TEHLIKELI MADDELER HAVA KUVVETLERI STANDARTLARINA UYGUN OLARAK BU PROJE KAPSAMINDA KULLANILACAK BUTUN TEHLIKELI MADDELER HAVA KUVVETLERI STANDARTLARINA UYGUN OLARAK DEPOLANACAKTIR. IKINCIL TOPLAMA DUZENLERI ILE YANICI MADDE DOLAPLARI BU TIP DEPOLAMA VASITALARIDIR. 4. BUTUN INSAAT MOLOZLARI USSUN DISINDAKI BIR DOKUM NOKTASINA TASINACAKTIR. USSUN ICINDEKI KAPATILMIS DOKUM BUTUN INSAAT MOLOZLARI USSUN DISINDAKI BIR DOKUM NOKTASINA TASINACAKTIR. USSUN ICINDEKI KAPATILMIS DOKUM NOKTASINA MOLOZ ATILMASINA IZIN VERILMEYECEKTIR. 5. MUTEAHHIT TEHLIKELI MADDELERIN IZLENMESI VE RAPORLANMASINDA IZLEME SISTEMINI KULLANARAK, CEVRE MUTEAHHIT TEHLIKELI MADDELERIN IZLENMESI VE RAPORLANMASINDA IZLEME SISTEMINI KULLANARAK, CEVRE MUHENDISLIGINE (39 CES/ CECV) PROJENIN TAMAMLANMASI DURUMUNDA BIR MADDE KULLANMA MEKTUBU SUNACAKTIR. TEHLIKELI PROJENIN TUM FAZLARINDA KULLANILAN TEHLIKELI MADDELERIN HERBIRI ICIN SDS VE MIKTARLARINI LISTE HALINDE SUNACAKTIR. 6. MUTEAHHIT INSAAT MOLOZLARININ YAGMUR SUYU KANALLARINA KARISMAMASI ICIN HER TURLU ONLEMI ALACAKTIR. MUTEAHHIT INSAAT MOLOZLARININ YAGMUR SUYU KANALLARINA KARISMAMASI ICIN HER TURLU ONLEMI ALACAKTIR. 7. INSAAT ISLERINDEN CIKAN ATIKSULAR FGS-T'YE UYGUN OLARAK BERTARAF EDILMELIDIR. INSAAT ISLERINDEN CIKAN ATIKSULAR FGS-T'YE UYGUN OLARAK BERTARAF EDILMELIDIR. 8. YIKIM ISLERI SIRASINDA EGER ASBEST ICEREN MALZEME BULUNURSA, MUTEAHHIT ACILEN INSAAT ALANINI TERK ETMEK VE YIKIM ISLERI SIRASINDA EGER ASBEST ICEREN MALZEME BULUNURSA, MUTEAHHIT ACILEN INSAAT ALANINI TERK ETMEK VE KONTRAT MEMURUNU BILGILENDIRMEK ZORUNDADIR. MUTEAHHIT BIR ASBESTLI MALZEME SOKUMUNE BASLAMADAN ONCE, IS KAPSAMINDA SOKULECEK YADA MUDEHALE EDILECEK ASBESTLI MALZEMELERIN VE BOLGELERIN YERINI TESPIT EDECEKTIR. GEREKTIGINDE ASBESTLI MALZEMENIN IZOLE EDILMESI, TAMIR YADA SOKULMESI FGS-T BOLUM 15, INCIRLIK HAVA USSU ASBEST YONETMELIGI VE ASBEST OPERASYON PLANI SARTNAMELERINE GORE YAPILACAKTIR. ASBESTLI MALZEMENIN ORNEGI VE TESTI SADECE SERTIFIKALI, TECRUBELI VE YETKILENDIRILMIS PERSONEL TARAFINDAN YAPILACAKTIR. MUTEAHHIT ASBESTLI MALZEMENIN SOKUMUNE BASLAMADAN ONCE, KONTRAT SUBAYLIGI VASITASIYLA CEVRE BOLUMUNUN INCELEMESI VE ONAYI ICIN ASBEST CALISMA PLANI HAZIRLAYACAKTIR. ASBESTLI MAZLZEMENIN SOKUMU SIRASINDA KULLANILACAK MALZEME VE METHODLAR ICIN CEVRE BOLUMU ILE KOORDINE KURUP ONAYINI ALACAKTIR. BU KOORDINASYON KONTRAT SUBAYLIGI UZERINDEN YAPILACAKTIR VE CEVRE BOLUMUNUN ONAYI OLMADAN ISE BASLANMAYACAKTIR. SOKULEN ASBESTLI MALZEME TURK TEHLIKELI MALZEME YONETMELIGINE UYGUN OLARAK PAKETLENECEK VE US TEHLIKELI ATIK DEPOLAMA (DRMO) ALANINA BERTARAF ICIN DLA-DS UZERINDEN TESLIM EDILECEKTIR. 9. BU PROJEDE KULLANILAN KIMYASALLARIN HEPSI IDAREYE AF FORM 3952 ILE SUNULACAKTIR. ONAY GUVENLIK VE CEVRE BU PROJEDE KULLANILAN KIMYASALLARIN HEPSI IDAREYE AF FORM 3952 ILE SUNULACAKTIR. ONAY GUVENLIK VE CEVRE MUHENDISLIGI, CEVRE VE ILAC BOLUMLERI TARAFINDAN ONAYLANACAKTIR. MUTEAHHIT TURKCE VE INGILIZCE OLARAK SDS DOKUMANLARINI AF FORM 3952 ILE BIRLIKTE SAGLAYACAKTIR VE BU FORMLAR INSAAT SAHASINDA ULASILABILIR OLACAKTIR. MUTEAHHIT TEHLIKELI MADDE LISTESINI ONAY ALMAK ICIN SUNACAKTIR. 10. SIVI TEHLIKELI MADDELER IKINCIL EMNIYET KONTEYNERINDE DEPOLANMALIDIR. BIRBIRIYLE REAKSIYONA GIRIBILECEK SIVI TEHLIKELI MADDELER IKINCIL EMNIYET KONTEYNERINDE DEPOLANMALIDIR. BIRBIRIYLE REAKSIYONA GIRIBILECEK MALZEMELER AYNI IKINCIL EMNIYET KONTEYNERINDE DEPOLANMAMALIDIR. TEHLIKELI MADDELERIN ISARETLENMEMIS DEPOLARA TRANSFERINE IZIN VERILMEZ. MUTEAHHIT PROJE SAHASINDA DEPOLANAN TEHLIKELI MADDELERIN TIPI VE MIKTARI ILE ILGILI ENVANTERI TUTMAK ZORUNDADIR. MUTEAHHIT SAHADA AYRICA ISCILERIN VE ACIL MUDEHALE EKIBININ KULLANABILMESI ICIN BUTUN SDS RIN TURKCE VE INGILIZCELERININ OLDUGU BIR DOSYA BULUNDURMALIDIR. 11. BUTUN ISLER AMERIKAN CEVRE KURALLARINA, SARTNAMESINE, TUZUGUNE, IDARI PROGRAMINA, HAVA KUVVETLERI BUTUN ISLER AMERIKAN CEVRE KURALLARINA, SARTNAMESINE, TUZUGUNE, IDARI PROGRAMINA, HAVA KUVVETLERI REHBERINE VE KURALLARINA UYGUN OLARAK YAPILACAKTIR. 12. TURK RESMI GAZETE 18 MART 2004/25406 SAYILI HAFRIYAT TOPRAGI, INSAAT VE YIKINTI ATIKLARININ KONTROLU TURK RESMI GAZETE 18 MART 2004/25406 SAYILI HAFRIYAT TOPRAGI, INSAAT VE YIKINTI ATIKLARININ KONTROLU YONETMELIGINE GORE, MUTEAHHIT, ISE BASLAMADAN ONCE 2 TONDAN FAZLA INSAAT VE YIKIM MOLOZU OLUSACAK PROJELERDE AF IMT 103 TAMAMLAYABILMEK ICIN US CEVRE OFISI KOORDINASYONUNDA INSAAT VE YIKIM SINIFINA GORE DOLDURULMUS ATIK NAKLIYAT VE KABUL SERTIFIKA BELGELERINI SAGLAYACAK, VE CEVRE KORUMA PLANI ILE BIRLIKTE VEYA “SERTIFIKASYON VE KALIBRASYON SUNUMU” ILE BIRLIKTE 39 CES/CECV INCELEMESI ICIN SUNACAKTIR. SERTIFIKASYON VE KALIBRASYON SUNUMU” ILE BIRLIKTE 39 CES/CECV INCELEMESI ICIN SUNACAKTIR. ILE BIRLIKTE 39 CES/CECV INCELEMESI ICIN SUNACAKTIR. 13. CIVA ICEREN FLORESAN LAMBA VE BALASTLARI UYGUN SEKILDE DEPOLANMALI VE DONUSUM ICIN 39 CES/CECV CIVA ICEREN FLORESAN LAMBA VE BALASTLARI UYGUN SEKILDE DEPOLANMALI VE DONUSUM ICIN 39 CES/CECV UZERINDEN BERTERAF EDILMELIDIR. 14. ESKI KLIMA UNITELERI VEYA BUZDOLABI MAKINELERININ SOGUTUCULARI CIKARILMALIDIR VE CIKARILAN SINIF I/II ESKI KLIMA UNITELERI VEYA BUZDOLABI MAKINELERININ SOGUTUCULARI CIKARILMALIDIR VE CIKARILAN SINIF I/II SOGUTUCULARIN 39 CES / CECV'E TESLIMI GEREKIR. KLIMA UNITESI, DLA-DS GEREKLILIKLERINE GORE BOSALTILMALI, UC DEFA DURULANMALI VE ETIKETLENEREK BINA 200 DLA-DS YE GELMEDEN ONCE BINA 202 YE GOTURULMELIDIR. 15. MUTEAHHIT FAALIYETLERINE BASLAMADAN EK-2 DE SAGLANAN (TU 25406) ATIK TASIMA VE DEPOLAMA ILE ILGILI ATIK MUTEAHHIT FAALIYETLERINE BASLAMADAN EK-2 DE SAGLANAN (TU 25406) ATIK TASIMA VE DEPOLAMA ILE ILGILI ATIK TASIMA VE KABUL BELGELERINI ALMALIDIR.

AutoCAD SHX Text

1. ASBESTOS CONTAINING MATERIALS, CLASS I AND CLASS II ODCS, LEAD BASED PAINTS, PCBS/PCTS/PBBS AND MATERIALS ASBESTOS CONTAINING MATERIALS, CLASS I AND CLASS II ODCS, LEAD BASED PAINTS, PCBS/PCTS/PBBS AND MATERIALS CONTAINING ANY OF THE EPA 17 CHEMICALS MUST NOT BE USED WITHIN THE SCOPE OF THE PROJECT. 2. ALL HAZARDOUS MATERIALS WHICH WILL BE USED IN THE PROJECT MUST BE SUBMITTED ELECTRONICALLY BY ENTERING ALL HAZARDOUS MATERIALS WHICH WILL BE USED IN THE PROJECT MUST BE SUBMITTED ELECTRONICALLY BY ENTERING THE INFORMATION INTO THE EESOH-MIS (ENTERPRISE ENVIRONMENTAL SAFETY OCCUPATIONAL HEALTH-MANAGEMENT INFORMATION SYSTEM. THE SDS IN BOTH ENGLISH AND TURKISH SHOULD BE UPLOADED INTO THE SYSTEM. THE HAZMAT CAN BE USED AFTER THE APPROVAL PROCESS. 3. ALL HAZMAT STORED ON THE PROJECT SITE MUST COMPLY WITH AIR FORCE STANDARDS. THIS INCLUDES SECONDARY ALL HAZMAT STORED ON THE PROJECT SITE MUST COMPLY WITH AIR FORCE STANDARDS. THIS INCLUDES SECONDARY CONTAINMENT AND FLAMMABLE CABINETS. 4. ALL CONSTRUCTION DEBRIS MUST BE TAKEN TO AN OFF BASE LAND FILL. DISPOSAL AT THE CLOSED LANDFILL AND AT ALL CONSTRUCTION DEBRIS MUST BE TAKEN TO AN OFF BASE LAND FILL. DISPOSAL AT THE CLOSED LANDFILL AND AT THE ROADS AND GROUNDS STORAGE AREA ON THE BASE IS NOT ALLOWED. 5. CONTRACTOR MUST USE A TRACKING SYSTEM FOR TRACKING AND REPORTING HAZMAT TRANSACTIONS AND SHALL SUBMIT CONTRACTOR MUST USE A TRACKING SYSTEM FOR TRACKING AND REPORTING HAZMAT TRANSACTIONS AND SHALL SUBMIT A LETTER OF HAZMAT USAGE UPON THE COMPLETION OF THE PROJECT TO ENVIRONMENTAL (39 CES/CECV). THE LETTER SHALL LIST THE HAZMAT, THE INDIVIDUAL COMPONENTS LISTED ON THE SDS AND THE QUANTITIES USED DURING ALL PHASES OF THE PROJECT. 6. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO AVOID PENETRATION OF DEBRIS INTO STORM WATER SYSTEM. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO AVOID PENETRATION OF DEBRIS INTO STORM WATER SYSTEM. 7. WASTEWATER FROM CONSTRUCTION ACTIVITIES SHALL BE DISPOSED IN ACCORDANCE WITH FGS-T. WASTEWATER FROM CONSTRUCTION ACTIVITIES SHALL BE DISPOSED IN ACCORDANCE WITH FGS-T. 8. IF ASBESTOS CONTAINING MATERIAL (ACM) IS DISCOVERED DURING THE DEMOLITION WORK, THE CONTRACTOR MUST IF ASBESTOS CONTAINING MATERIAL (ACM) IS DISCOVERED DURING THE DEMOLITION WORK, THE CONTRACTOR MUST IMMEDIATELY CEASE WORK EVACUATE THE CONSTRUCTION AREA, AND INFORM THE CONTRACTING OFFICER. CONTRACTOR SHALL IDENTIFY PRIOR TO BEGINNING OF THE CONSTRUCTION, THE LOCATION OF ALL ASBESTOS CONTAINING MATERIALS (ACM) WHICH MAY BE DISTURBED OR REMOVED BY THE WORK. WHEN REQUIRED, THE ISOLATION, REPAIR OR REMOVAL OF ACM WILL BE CONDUCTED IAW FGS-T CHAPTER 15 AND THE IAB ASBESTOS MANAGEMENT AND ASBESTOS OPERATIONS PLANS. ACM SHALL ONLY BE SAMPLED, TESTED, REPAIRED AND REMOVED BY AUTHORIZED, CERTIFIED AND EXPERIENCED PERSONNEL. CONTRACTOR SHALL PREPARE AN ASBESTOS WORK PLAN FOR APPROVAL AND COORDINATION BY THE ENVIRONMENTAL OFFICE TO THE CONTRACTING OFFICER PRIOR TO THE DISTURBANCE OR REMOVAL OF ACM. CONTRACTOR SHALL COORDINATE WITH THE BASE ENVIRONMENTAL DEPARTMENT FOR THE APPROVAL OF THE METHODS AND EQUIPMENT THAT SHALL BE USED DURING THE ASBESTOS WORK. SUCH COORDINATION SHALL BE MADE THROUGH THE CONTRACTING OFFICER AND NO WORK SHALL START PRIOR TO THE APPROVAL OF THE ENVIRONMENTAL OFFICE. REMOVED ACM SHALL BE PACKAGED IN ACCORDANCE WITH TURKISH DANGEROUS GOODS REGULATIONS AND DELIVERED TO THE BASE HAZARDOUS WASTE STORAGE AREA FOR DISPOSAL VIA DLA-DS. 9. ALL CHEMICALS THAT ARE BEING USED FOR THIS PROJECT SHALL BE SUBMITTED FOR APPROVAL ON AF FORM 3952. ALL CHEMICALS THAT ARE BEING USED FOR THIS PROJECT SHALL BE SUBMITTED FOR APPROVAL ON AF FORM 3952. APPROVAL WILL BE PROVIDED BY SAFETY, BIOENVIRONMENTAL ENGINEERING, ENVIRONMENTAL AND PHARMACY. SDS IN BOTH TURKISH AND ENGLISH SHALL BE PROVIDED WITH THE AF FORM 3952 AND THEY SHALL BE AVAILABLE AT THE JOB SITE. CONTRACTOR SHALL SUBMIT HAZARDOUS MATERIAL LIST FOR APPROVAL. 10. LIQUID HAZMAT ITEMS MUST BE STORED WITHIN A SECONDARY CONTAINMENT. INCOMPATIBLE MATERIALS MUST NOT BE LIQUID HAZMAT ITEMS MUST BE STORED WITHIN A SECONDARY CONTAINMENT. INCOMPATIBLE MATERIALS MUST NOT BE STORED IN THE SAME SECONDARY CONTAINMENT. TRANSFER OF HAZMAT INTO UNMARKED CONTAINERS IS NOT ALLOWED. THE CONTRACTOR SHALL MAINTAIN AN INVENTORY OF THE TYPES AND QUANTITY OF HAZMAT STORED AT THE PROJECT SITE AND MUST ALSO HAVE A BINDER WITH ALL OF THE SDS IN BOTH TURKISH AND ENGLISH AVAILABLE FOR USE BY EMPLOYEES AND EMERGENCY RESPONDERS. 11. ALL WORK WILL CONFORM TO US ENVIRONMENTAL LAWS, ENVIRONMENTAL COMPLIANCE ASSESSMENT AND MANAGEMENT ALL WORK WILL CONFORM TO US ENVIRONMENTAL LAWS, ENVIRONMENTAL COMPLIANCE ASSESSMENT AND MANAGEMENT PROGRAM (ECAMP) PROVISION, AIR FORCE ENVIRONMENTAL POLICY GUIDELINES AND REGULATIONS. 12. "PRIOR TO STARTING ANY WORK PRODUCING MORE THAN 2 TONS OF CONSTRUCTION AND DEMOLITION (C&D) DEBRIS "PRIOR TO STARTING ANY WORK PRODUCING MORE THAN 2 TONS OF CONSTRUCTION AND DEMOLITION (C&D) DEBRIS WASTE, THE CONTRACTOR SHALL PROVIDE COMPLETED WASTE TRANSPORTATION AND ACCEPTANCE CERTIFICATES (TRANSPORTATION CERTIFICATION AND STORAGE CERTIFICATION) FILLED PER C&D CLASSIFICATIONS IN ORDER TO MAKE AF IMT 103 COORDINATION WITH BASE ENVIRONMENTAL OFFICE, AS REQUIRED BY THE REGULATION ON CONTROL OF EXCAVATION SOIL, CONSTRUCTION AND DEMOLITION WASTE, TURKISH OFFICIAL GAZETTE 18 MARCH, 2004/25406, AND SUBMIT THE DOCUMENT ALONG WITH THE ENVIRONMENTAL PROTECTION PLAN (EPP) OR TOGETHER WITH “CERTIFICATION AND CALIBRATION SUBMITTAL” TO 39 CES/CECV FOR REVIEW.” CERTIFICATION AND CALIBRATION SUBMITTAL” TO 39 CES/CECV FOR REVIEW.” TO 39 CES/CECV FOR REVIEW.” 13. FLUORESCENT LIGHTS AND BALLASTS CONTAINING MERCURY MUST BE STORED PROPERLY AND DISPOSED THROUGH 39 FLUORESCENT LIGHTS AND BALLASTS CONTAINING MERCURY MUST BE STORED PROPERLY AND DISPOSED THROUGH 39 CES/CECV FOR RECYCLING. 14. THE OLD AIR CONDITIONING UNITS OR REFRIGERATORS MUST HAVE THE COOLANTS REMOVED AND THE REMOVED CLASS THE OLD AIR CONDITIONING UNITS OR REFRIGERATORS MUST HAVE THE COOLANTS REMOVED AND THE REMOVED CLASS I/II REFRIGERANTS SHOULD BE TURNED INTO 39 CES/CECV. THE A/C UNIT SHOULD BE DRAINED, TRIPLE-RINSED AND LABELED IN ACCORDANCE WITH DLA-DS REQUIREMENTS AND TURNED INTO DLA-DS. LABELED CONTAINERS SHOULD BE TAKEN TO BLDG#202 TAGGED WITH A CERTIFICATE OF PURGING BEFORE TURNING THE CONTAINER INTO DLA-DS AT BLDG#200. 15. THE CONTRACTOR SHOULD OBTAIN THE WASTE TRANSPORTATION AND ACCEPTANCE CERTIFICATE PROVIDED IN ANNEX-2 THE CONTRACTOR SHOULD OBTAIN THE WASTE TRANSPORTATION AND ACCEPTANCE CERTIFICATE PROVIDED IN ANNEX-2 (TU 25406) REGARDING WASTE TRANSPORTATION AND STORAGE BEFORE STARTING THEIR ACTIVITIES.

AutoCAD SHX Text

CHECKED BY :

AutoCAD SHX Text

39 CIVIL ENGINEER SQUADRON

AutoCAD SHX Text

39 CIVIL ENGINEER SQUADRON

AutoCAD SHX Text

BASE CIVIL ENGINEER

AutoCAD SHX Text

INCIRLIK AIR BASE TURKIYE

AutoCAD SHX Text

TH

AutoCAD SHX Text

DRAWN BY :

AutoCAD SHX Text

DESIGNED BY :

AutoCAD SHX Text

DRAWING CODE :

AutoCAD SHX Text

DESIGN FILE NO :

AutoCAD SHX Text

DATE :

AutoCAD SHX Text

PLOT SCALE :

AutoCAD SHX Text

REVISION :

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

MARK

AutoCAD SHX Text

SHEET

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text G

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text Q

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

INSTALL SECURITY CAMERA DORM FACILITIES

AutoCAD SHX Text

PROJECT NO: LJYC 20-1122

AutoCAD SHX Text

AUG '20

AutoCAD SHX Text

DORM BINALARINA GUVENLIK KAMERASI INSAASI

AutoCAD SHX Text

OF 29

AutoCAD SHX Text

A/E FIRM/CONTRACTOR

AutoCAD SHX Text

3 LINES

AutoCAD SHX Text

PROVIDED

AutoCAD SHX Text

GC1

AutoCAD SHX Text

35% SUBMITTAL AUG '20

AutoCAD SHX Text 1:2000

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

AutoCAD SHX Text

SITE PLAN AND NOTES

AutoCAD SHX Text

VAZIYET PLANI VE NOTLAR

AutoCAD SHX Text

NUH MERZIFONLUOGLU

AYTAC URUC

GENEL NOTLAR:

GENERAL NOTES:

FOR OFFICIAL USE ONLY

2 3 4

D

C

B

A

1 2 3 4

D

C

B

A

FOR OFFICIAL USE ONLY

AutoCAD SHX Text

1. MUTEAHHIT PROJE ESASLARINA GORE KOMPLE VE KULLANILABILIR YAPI VEYA SISTEM SAGLAMAKTAN SORUMLUDUR. MUTEAHHIT PROJE ESASLARINA GORE KOMPLE VE KULLANILABILIR YAPI VEYA SISTEM SAGLAMAKTAN SORUMLUDUR. 2. MUTEAHHIT PROJE ILE ILGILI CIZIMLERIN ONAYINI ALMADAN HIC BIR ISE BASLAMAMALIDIR. MUTEAHHIT PROJE ILE ILGILI CIZIMLERIN ONAYINI ALMADAN HIC BIR ISE BASLAMAMALIDIR. 3. MUTEAHHIT BIR ISE BASLAMADAN ONCE FORM INC 1106 DA ISTENEN CIZIMLERI SAHA ETUTU YAPARAK SUNACAKTIR. MUTEAHHIT BIR ISE BASLAMADAN ONCE FORM INC 1106 DA ISTENEN CIZIMLERI SAHA ETUTU YAPARAK SUNACAKTIR. 4. MUTEAHHIT TESISLERE GECICI OLARAK SUREKLI ULASIM SAGLAMAKTAN SORUMLUDUR. MUTEAHHIT TESISLERE GECICI OLARAK SUREKLI ULASIM SAGLAMAKTAN SORUMLUDUR. 5. CIZIMLERDE ACIKCA GOSTERILMESE BILE TUM GEREKLI SOKUM VE YENIDEN YAPIM ISLERI MUTEAHHIT TARAFINDAN YAPILACAKTIR. CIZIMLERDE ACIKCA GOSTERILMESE BILE TUM GEREKLI SOKUM VE YENIDEN YAPIM ISLERI MUTEAHHIT TARAFINDAN YAPILACAKTIR. 6. GEREKLI TUM ISARET, IKAZ LEVHALARI, BARIKAT VE TRAFIK CEVIRMESI MUTEAHHIT TARAFINDAN TEMIN EDILECEKTIR. GEREKLI TUM ISARET, IKAZ LEVHALARI, BARIKAT VE TRAFIK CEVIRMESI MUTEAHHIT TARAFINDAN TEMIN EDILECEKTIR. 7. MUTEAHHIT ISE BASLAMADAN ONCE ARAZI SARTLARINI KONTROL EDECEK VE DRENAJ GUZERGAHINI DIGER SISTEMLER, TESISATLAR, ISARETLER VE MUTEAHHIT ISE BASLAMADAN ONCE ARAZI SARTLARINI KONTROL EDECEK VE DRENAJ GUZERGAHINI DIGER SISTEMLER, TESISATLAR, ISARETLER VE YAYA YOLLARIYLA CAKISMASINI ONLEYECEK SEKILDE GEREKTIGINDE DEGISTIRECEKTIR. CAKISMALAR NEDENIYLE YAPILACAK OLAN HER TURLU GUZERGAH TADILATI, IHALE SUBAYI'NIN ONAYINA BAGLIDIR. 8. MUTEAHHIT DIGER SISTEMLERE BIR ZARAR GELMESINI ONLEMEK ICIN KAZI ISLERINE BASLAMADAN ONCE TUM MEVCUT YERALTI VE YERUSTU MUTEAHHIT DIGER SISTEMLERE BIR ZARAR GELMESINI ONLEMEK ICIN KAZI ISLERINE BASLAMADAN ONCE TUM MEVCUT YERALTI VE YERUSTU TESISATLARININ, OLCULERINI VE YERLERINI KONTROL EDECEKTIR. 9. IS BOYUNCA TUM TESISATLAR CALISIR HALDE TUTULACAKTIR. IS BOYUNCA TUM TESISATLAR CALISIR HALDE TUTULACAKTIR. 10. INSAAT ESNASINDA YANGIN HIDRANTLARININ SOKULMESI VEYA HASAR GORMESINDE MUTEAHHIT ITFAIYE BOLUMUNU DERHAL HABERDAR EDECEKTIR. INSAAT ESNASINDA YANGIN HIDRANTLARININ SOKULMESI VEYA HASAR GORMESINDE MUTEAHHIT ITFAIYE BOLUMUNU DERHAL HABERDAR EDECEKTIR. 11. MUTEAHHIT ISTEN DOGACAK INSAAT ARTIKLARI VE CAMURUN CADDELERE VE CEVRE ALANLARA YAYILMAMASI ICIN TUM ONLEMLERI ALACAKTIR. MUTEAHHIT ISTEN DOGACAK INSAAT ARTIKLARI VE CAMURUN CADDELERE VE CEVRE ALANLARA YAYILMAMASI ICIN TUM ONLEMLERI ALACAKTIR. KAMYONLARDAN UCACAK, DUSECEK, ISCILER VEYA INSAAT MAKINALARINCA CEVREYE YAYILACAK ARTIKLAR ANINDA TEMIZLENECEKTIR. 12. MUTEAHHIT, BU KONTRATTA OLMAYAN, BIR HATTI/CIHAZI BESLEYEN ELEKTRIK/KOMINIKASYON CIHAZININ VEYA HATTININ SOKULMESI GEREKTIGI MUTEAHHIT, BU KONTRATTA OLMAYAN, BIR HATTI/CIHAZI BESLEYEN ELEKTRIK/KOMINIKASYON CIHAZININ VEYA HATTININ SOKULMESI GEREKTIGI DURUMLARDA DEVRE CALISACAK DURUMA GETIRILECEK SEKILDE DUZENLENECEK VEYA BAKIMI VE ONARIMINI YAPACAKTIR. 13. INSAAT SAHASI, INSAAT BITIMINDEN SONRA MUTEAAHIT TARAFINDAN DOGAL VE ORJINAL HALINE GETIRILECEKTIR. BU ALANLAR INSAAT ICINI VE INSAAT SAHASI, INSAAT BITIMINDEN SONRA MUTEAAHIT TARAFINDAN DOGAL VE ORJINAL HALINE GETIRILECEKTIR. BU ALANLAR INSAAT ICINI VE DISINI KAPSAMAKTADIR. 14. BASLANGIC 103 FORMU GEREKLI TUM US BOLUMLERIYLE TAM OLARAK KOORDINE EDILECEK VE PROJENIN BASLANGICINDA ONAYA SUNULACAKTIR. BASLANGIC 103 FORMU GEREKLI TUM US BOLUMLERIYLE TAM OLARAK KOORDINE EDILECEK VE PROJENIN BASLANGICINDA ONAYA SUNULACAKTIR. 15. SONRAKI 103 FORMU HERBIR ALTYAPI KONTROLU ISTEGINDEN VE HER BIR FAZDAN (EGER BIR ONCEKI 103 FORMU 90 GUNDEN DAHA ESKI ISE) SONRAKI 103 FORMU HERBIR ALTYAPI KONTROLU ISTEGINDEN VE HER BIR FAZDAN (EGER BIR ONCEKI 103 FORMU 90 GUNDEN DAHA ESKI ISE) 30 GUN ONCE ONAYA SUNULACAKTIR. TUM SONRAKI 103 FORMLARI SADECE MUHENDISLIK BAKIM ONARIM ATOLYELERI VE KOMUNIKASYON BOLUMU ILE KOORDINE EDILECEK VE ONCEKI BUTUN 103 FORMLARI ILE BIRLIKTE SUNULACAKTIR. 16. MUTEAHHIT ISE BASLAMADAN ONCE INSAAT DENETLEME OFISINDEN ONAYLI AF IMT 103 FORMUNU TEMIN ETMELIDIR VE BU FORMUN KOPYASINI MUTEAHHIT ISE BASLAMADAN ONCE INSAAT DENETLEME OFISINDEN ONAYLI AF IMT 103 FORMUNU TEMIN ETMELIDIR VE BU FORMUN KOPYASINI HERZAMAN SAHADA BULUNDURMALIDIR. 17. ON KABUL VE KABUL DENETLEMELERI, BAKIM ONARIM BOLUMU EGITIMLERI, VS ICIN PROJE SONUNA UC HAFTA EKLENMELIDIR (EGER BAKIM ON KABUL VE KABUL DENETLEMELERI, BAKIM ONARIM BOLUMU EGITIMLERI, VS ICIN PROJE SONUNA UC HAFTA EKLENMELIDIR (EGER BAKIM ONARIM BOLUMU ILK TALEBE KARSILIK VEREMEZSE TALEP BIR SONRAKI HAFTAYA KAYABILIR). 18. FAR KANUNU 52.236-21 (E VE F) METNI GEREGINCE INSAAT ICIN SARTNAMELER VE CIZIMLER: FAR KANUNU 52.236-21 (E VE F) METNI GEREGINCE INSAAT ICIN SARTNAMELER VE CIZIMLER: (E) IMALAT CIZIMLERININ KONTRAT SUBAYLIGI TARAFINDAN ONAYLANMASI MUTEAHHITIN BU CIZIMLERDEKI HATA VEYA EKSIKLIKLERI TAMAMLAMA IMALAT CIZIMLERININ KONTRAT SUBAYLIGI TARAFINDAN ONAYLANMASI MUTEAHHITIN BU CIZIMLERDEKI HATA VEYA EKSIKLIKLERI TAMAMLAMA GOREVINI AZALTMADIGI GIBI, MUTEAHHITIN BU KONTRATIN GEREKLILIKLERINE UYMA SORUMLULUGUNU DA ORTADAN KALDIRMAZ, ASAGIDA (F) PARAGRAFI DOGRULTUSUNDA TANIMLANMIS VE ONAYLANMIS VARYASYONLAR HARICTIR. (F) EGER IMALAT CIZIMLERI KONTRAT GEREKLILIKLERINDEN OLAN VARYASYONLARI GOSTERIYORSA MUTEAHHIT SUNUM ZAMANINDA BU VARYASYONLARI EGER IMALAT CIZIMLERI KONTRAT GEREKLILIKLERINDEN OLAN VARYASYONLARI GOSTERIYORSA MUTEAHHIT SUNUM ZAMANINDA BU VARYASYONLARI YAZIYA DOKECEKTIR, CIZIMLERDEN AYIRACAKTIR. 19. MUTEAHHIT SAHADA INGILIZCE BILEN BIR PROJE YETKILISI BULUNDURMAK ZORUNDADIR. MUTEAHHIT SAHADA INGILIZCE BILEN BIR PROJE YETKILISI BULUNDURMAK ZORUNDADIR. 20. BUTUN TEST KURULUSLARI, TEST TIPLERI VE METHOTLARI, TEST CIHAZLARI VE TEST YAPAN KISILERIN SERTIFIKALARI ONAY ICIN SUNULMALIDIR. BUTUN TEST KURULUSLARI, TEST TIPLERI VE METHOTLARI, TEST CIHAZLARI VE TEST YAPAN KISILERIN SERTIFIKALARI ONAY ICIN SUNULMALIDIR. 21. MUTEAHHIT BUTUN OLCULERI INCELEYIP DOGRULADIKTAN SONRA TEKLIFINI SUNACAKTIR. MUTEAHHIT BUTUN OLCULERI INCELEYIP DOGRULADIKTAN SONRA TEKLIFINI SUNACAKTIR. 22. BU PROJEDE HERHANGI BIR ITHAL MALZEME KULLANILACAGI ONGORULMEMISTIR. EGER MUTEAHHIT PROJEDE ITHAL MALZEME KULLANACAGINI BU PROJEDE HERHANGI BIR ITHAL MALZEME KULLANILACAGI ONGORULMEMISTIR. EGER MUTEAHHIT PROJEDE ITHAL MALZEME KULLANACAGINI ONGORURSE, TURK GENEL KURMAYDAN ONAY ALMAK ICIN BU MALZEMELERIN LISTESINI SUNACAKTIR. 23. INSAAT SIRASINDA CIKAN BUTUN INSAAT MOLOZLARI MUTEAHHIT TARAFINDAN PROJE SAHASINDAN ALINIP US KURALLARINA UYGUN OLARAK US INSAAT SIRASINDA CIKAN BUTUN INSAAT MOLOZLARI MUTEAHHIT TARAFINDAN PROJE SAHASINDAN ALINIP US KURALLARINA UYGUN OLARAK US DISINDA BUNUN ICIN AYRILMIS DOLGU ALANLARINA GOTURULECEKTIR. KAPALI DOLGU ALANLARINA VEYA ROADS AND GROUND ATOLYE DEPO ALANINA DOKULMESINE IZIN VERILMEYECEKTIR. 24. MUTEAHHIT INSAAT SIRASINDA ZARAR VERDIGI HERHANGI BIR HUKUMET MALINI TAMIR ETMEKTEN SORUMLUSUR. MUTEAHHIT INSAAT SIRASINDA ZARAR VERDIGI HERHANGI BIR HUKUMET MALINI TAMIR ETMEKTEN SORUMLUSUR. 25. MUTEAHHIT U.S. ARMY CORPS OF ENGINEERS KLAVUZUNUN SON SURUMU, OSHA VE UYGULANABILIR TURK GUVENLIK YONETMELIKLERINE UYGUN MUTEAHHIT U.S. ARMY CORPS OF ENGINEERS KLAVUZUNUN SON SURUMU, OSHA VE UYGULANABILIR TURK GUVENLIK YONETMELIKLERINE UYGUN OLARAK IS SAHASINDA GUVENLI CALISMA ORTAMI SAGLAMAK ICIN BUTUN GEREKLI ONLEMLERI ALMAK ILE SORUMLU OLACAKTIR. 26. HERHANGI BIR ISE BASLAMADAN ONCE MUTEAHHIT, INSAAT SAHASININ CEVRESINDE IHALE SUBAYININ ONAYLAYACAGI SEKILDE GECICI CITI TEMIN VE HERHANGI BIR ISE BASLAMADAN ONCE MUTEAHHIT, INSAAT SAHASININ CEVRESINDE IHALE SUBAYININ ONAYLAYACAGI SEKILDE GECICI CITI TEMIN VE TESIS EDECEKTIR. TUM EMNIYET ISARETLERI VE BARIYERLERI KONTRAT DOKUMANLARINA UYGUN TEMIN EDILECEKTIR. 27. MEVCUT DURUM VE YIKIM PAFTALARI, IS YERINDE YAPILAN ROLEVE, TESPIT VE IZLENIMLERDEN ELDE EDILEN BILGILERE DAYANILARAK MEVCUT DURUM VE YIKIM PAFTALARI, IS YERINDE YAPILAN ROLEVE, TESPIT VE IZLENIMLERDEN ELDE EDILEN BILGILERE DAYANILARAK GELISTIRILMISTIR. BU NEDENLE, YIKIM ISLEMLERI SIRASINDA FARKLI BIR DURUMLA KARSILASACAK OLDUGU TAKDIRDE, MUTEAHHIT IHALE SUBAYI VEYA TEKNIK TEMSILCISINI DERHAL HABERDAR EDECEKTIR. 28. DETAYLI UYGULAMA PLANI ONAYA SUNULACAKTIR. DETAYLI UYGULAMA PLANI ONAYA SUNULACAKTIR. 29. PROJE PAKETINDEKI HUKUMET TARAFINDAN SAGLANAN IS BITIMI CIZIMLERI YALNIZCA REFERANS AMACLIDIR. MEVCUT DURUM VE BOYUTLAR PROJE PAKETINDEKI HUKUMET TARAFINDAN SAGLANAN IS BITIMI CIZIMLERI YALNIZCA REFERANS AMACLIDIR. MEVCUT DURUM VE BOYUTLAR MUTEAHHIT TARAFINDAN SAHADA DOGRULANACAKTIR. 30. MUTEAHHIT, INSAAT BASLAMADAN ONCE IHALE SUBAYI ARACILIGI ILE TESIS KULLANICILARI ILE KOORDINE KURARAK FAZ PLANI HAZIRLAYACAKTIR. MUTEAHHIT, INSAAT BASLAMADAN ONCE IHALE SUBAYI ARACILIGI ILE TESIS KULLANICILARI ILE KOORDINE KURARAK FAZ PLANI HAZIRLAYACAKTIR. ETKIYI AZALTMAK ICIN PROJE ASAMALI OLARAK INSAA EDILECEKTIR. FAZ PLANI HER FAZ ICIN INSAAT FALIYETININ GOREV SIRASINI TANIMLAYACAKTIR. MUTEAHHIT DETAYLI BIR FAZ PLANI SUNACAK VE FAZ PLANINI OLUSTURMAK ICIN KULLANICI VE IHALE SUBAYININ TEKNIK TEMSILCISI ILE BIRLIKTE CALISACAKTIR.FAZ PLANI HUKUMETIN TAKDIRINE BAGLI OLARAK DEGISEBILIR. HUKUMET, HER BIR FAZIN BASLAMASINI ONAYLAR VE HER FAZIN BASLAMASINI ERTELEME HAKKINI SAKLI TUTAR. 31. MUTEAHHIT ISI TAMAMLAMAK ICIN GEREKLI ZAMANIN ONAYLANMASI ICIN BELIRITILEN AKTIVITELERI ICERECEK SEKILDE ILERLEME RAPORU MUTEAHHIT ISI TAMAMLAMAK ICIN GEREKLI ZAMANIN ONAYLANMASI ICIN BELIRITILEN AKTIVITELERI ICERECEK SEKILDE ILERLEME RAPORU SUNACAKTIR: 1) FABRIKASYON IMALAT CIZIMLERININ ONAYA SUNULMASI ICIN GEREKEN SURE. RAPOR, INCELEME, ONAY VE IMALAT CIZIMLERININ GERI DONMESI ICIN 10 GUNE OLANAK TANIMALIDIR. 2) IMALAT CIZIMLERININ ONAYLANMASINDAN SONRA, GEREKLI OLAN MALZEMELERIN SIPARIS VE TEMINI. 32. PROJENIN ONAYLANMASINI TAKIBEN, MUTEAHHIT MEVCUT HUKUMET CIZIMLERINI AUTOCAD KULLANARAK IS BITIMI CIZIMLERI OLARAK PROJENIN ONAYLANMASINI TAKIBEN, MUTEAHHIT MEVCUT HUKUMET CIZIMLERINI AUTOCAD KULLANARAK IS BITIMI CIZIMLERI OLARAK GUNCELLEYECEK VE SDSFIE STANDARDLARINDA HAZIRLANMIS DIJITAL KOPYALARINI KOMPAKT DISK ILE DOSYA KAPATMA PROSEDURU ICIN ONAYA SUNACAKTIR. 33. KONTRAT KAPANIS SORUMLULUGU, IS BITIMI CIZIMLERININ, ISARETLENMIS UYGULAMA CIZIMLERININ, TURAF'A TESLIM EDILEN MALZEMELERIN KONTRAT KAPANIS SORUMLULUGU, IS BITIMI CIZIMLERININ, ISARETLENMIS UYGULAMA CIZIMLERININ, TURAF'A TESLIM EDILEN MALZEMELERIN LISTESININ VE EKIPMAN GARANTI SERTIFIKALARININ IHALE SUBAYINA SUNULMASI ILE SINIRLANDIRLACAKTIR. 34. MUTEAHHIT, UFC 3-260-01, EK 15, INSAAT FAZ PLANI VE INSAAT ESNASINDA HAVAALANINDA OPERASYONEL GUVENLIK'E UYACAKTIR. MUTEAHHIT, UFC 3-260-01, EK 15, INSAAT FAZ PLANI VE INSAAT ESNASINDA HAVAALANINDA OPERASYONEL GUVENLIK'E UYACAKTIR. 35. MUTEAHHIT TASARIM PERFORMANSI INSAAT VE TASARIM ASAMALARI ICIN DD2361 ( MIMARI-MUHENDISLIK ) PERFORMANS DEGERLENDIRME FORMU MUTEAHHIT TASARIM PERFORMANSI INSAAT VE TASARIM ASAMALARI ICIN DD2361 ( MIMARI-MUHENDISLIK ) PERFORMANS DEGERLENDIRME FORMU ILE DEGERLENDIRILECEKTIR, DEGERLENDIRME SONUCLARI HTTP://WWW.ACQ.OSD.MIL/DPAP/DARS/DFARS/HTML/PREVIOUS/DD2631.PDF. LINKINDEN HTTP://WWW.ACQ.OSD.MIL/DPAP/DARS/DFARS/HTML/PREVIOUS/DD2631.PDF. LINKINDEN . LINKINDEN INCELENEBILECEKTIR. DEGERLENDIRME SONUCLARI AMERIKAN HAVA KUVVETLERI CPARS SISTEMINE KALICI OLRAK KAYDEDILECEKTIR. 36. CALISMA SAATLERI CUMARTESI VE PAZAR HARIC 07:30 A.M.-16:30P.M. ARASINDA OLACAKTIR. MUTEAHHIT, HAFTASONU CALISMASI ICIN EN AZ 1 CALISMA SAATLERI CUMARTESI VE PAZAR HARIC 07:30 A.M.-16:30P.M. ARASINDA OLACAKTIR. MUTEAHHIT, HAFTASONU CALISMASI ICIN EN AZ 1 HAFTA ONCE IHALE OFISI ILE KOORDINE KURUP ONAY TALEP EDECEKTIR. BU KONU AYNI ZAMANDA TURAF TARAFINDAN US GIRIS ONAYINA TABIDIR VE ONAY ALMAK MUTEAHHIDIN SORUMLULUGUNDADIR. 37. MUTEAHHIT, YAPILACAK ISLERI BITIRDIGINDE IHALE KONTRAT IDARECISINI IS KABULUNE HAZIR OLDUGUNU KONTRAT BITIS TARIHININ 20 GUN MUTEAHHIT, YAPILACAK ISLERI BITIRDIGINDE IHALE KONTRAT IDARECISINI IS KABULUNE HAZIR OLDUGUNU KONTRAT BITIS TARIHININ 20 GUN ONCESINDEN GEC OLMAYACAK SEKILDE BILDIRECEKTIR.

AutoCAD SHX Text

1. THE CONTRACTOR IS SOLELY RESPONSIBLE TO PROVIDE THE GOVERNMENT A COMPLETE AND USEABLE FACILITY OR END PRODUCT IAW THE SCOPE OF THIS PROJECT. THE CONTRACTOR IS SOLELY RESPONSIBLE TO PROVIDE THE GOVERNMENT A COMPLETE AND USEABLE FACILITY OR END PRODUCT IAW THE SCOPE OF THIS PROJECT. 2. THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION WORK UNTIL THE GOVERNMENT HAS REVIEWED THE CONTRACTOR'S SHOP DRAWINGS. THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION WORK UNTIL THE GOVERNMENT HAS REVIEWED THE CONTRACTOR'S SHOP DRAWINGS. 3. CONTRACTOR SHALL SURVEY AND SUBMIT SHOP DRAWINGS AS REQUESTED IN FORM INC 1106 FOR REVIEW PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL SURVEY AND SUBMIT SHOP DRAWINGS AS REQUESTED IN FORM INC 1106 FOR REVIEW PRIOR TO COMMENCEMENT OF WORK. 4. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN TEMPORARY CONTINUOUS ACCESS TO ALL FACILITIES. CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN TEMPORARY CONTINUOUS ACCESS TO ALL FACILITIES. 5. ALL NECESSARY DEMOLITION AND RECONSTRUCTION WORK SHALL BE DONE BY THE CONTRACTOR EVEN IF IT IS NOT SHOWN EXPLICITLY ON THE DRAWINGS. ALL NECESSARY DEMOLITION AND RECONSTRUCTION WORK SHALL BE DONE BY THE CONTRACTOR EVEN IF IT IS NOT SHOWN EXPLICITLY ON THE DRAWINGS. 6. ALL NECESSARY SIGNS, BARRICADES AND TRAFFIC DIVERSION WARNINGS SHALL BE PROVIDED BY CONTRACTOR. ALL NECESSARY SIGNS, BARRICADES AND TRAFFIC DIVERSION WARNINGS SHALL BE PROVIDED BY CONTRACTOR. 7. CONTRACTOR SHALL EXAMINE SITE CONDITIONS PRIOR TO STARTING WORK AND ADJUST DRAINAGE ROUTE WHEN NECESSARY TO AVOID CONFLICTS WITH OTHER SYSTEMS, CONTRACTOR SHALL EXAMINE SITE CONDITIONS PRIOR TO STARTING WORK AND ADJUST DRAINAGE ROUTE WHEN NECESSARY TO AVOID CONFLICTS WITH OTHER SYSTEMS, UTILITIES, SIGNS AND WALKWAYS. ANY ROUTE REVISION WHICH SHALL BE DEEMED NECESSARY DUE TO CONFLICTS SHALL BE SUBJECT TO THE CONTRACTING OFFICER'S APPROVAL. 8. IN ORDER TO AVOID ANY DAMAGE TO OTHER SYSTEMS THE CONTRACTOR SHALL INVESTIGATE ALL EXISTING UNDERGROUND AND ABOVEGROUND INSTALLATIONS AND/OR IN ORDER TO AVOID ANY DAMAGE TO OTHER SYSTEMS THE CONTRACTOR SHALL INVESTIGATE ALL EXISTING UNDERGROUND AND ABOVEGROUND INSTALLATIONS AND/OR UTILITIES AND SHALL VERIFY ALL DIMENSIONS AND LOCATIONS IN THE FIELD, PRIOR TO EXCAVATION WORKS. 9. ALL UTILITY SYSTEMS SHALL BE MAINTAINED OPERATIONAL DURING THE WORK. ALL UTILITY SYSTEMS SHALL BE MAINTAINED OPERATIONAL DURING THE WORK. 10. CONTRACTOR SHALL NOTIFY THE FIRE DEPARTMENT IMMEDIATELY, IF EXISTING FIRE HYDRANTS ARE TO BE REMOVED OR DISTURBED DURING CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE FIRE DEPARTMENT IMMEDIATELY, IF EXISTING FIRE HYDRANTS ARE TO BE REMOVED OR DISTURBED DURING CONSTRUCTION. 11. THE CONTRACTOR SHALL TAKE ALL MEASURES TO AVOID THE SPREADING OF DEBRIS AND MUD RESULTING FROM WORK ON THE EXISTING STREETS AND SURROUNDING THE CONTRACTOR SHALL TAKE ALL MEASURES TO AVOID THE SPREADING OF DEBRIS AND MUD RESULTING FROM WORK ON THE EXISTING STREETS AND SURROUNDING AREAS. ALL DEBRIS OR RUBBISH FALLEN-BLOWN FROM TRUCKS, OR CONSTRUCTION EQUIPMENTS, SHALL IMMEDIATELY BE CLEANED. 12. WHEREVER ELECTRICAL/COMMUNICATION DEVICES AND LINES IN CONSTRUCTION AREAS NOT IN CONTRACT AREA FED THROUGH THOSE DEVICES BEING REMOVED; THE WHEREVER ELECTRICAL/COMMUNICATION DEVICES AND LINES IN CONSTRUCTION AREAS NOT IN CONTRACT AREA FED THROUGH THOSE DEVICES BEING REMOVED; THE CIRCUIT SHALL BE MODIFIED/MAINTAINED AS NECESSARY TO REMAIN OPERATIONAL. 13. THE CONSTRUCTION SITE NEEDS TO BE RESTORED TO NATURAL STATE AFTER CONSTRUCTION BY THE CONTRACTOR. THIS INCLUDES ALL AREAS IN & OUT OF THE THE CONSTRUCTION SITE NEEDS TO BE RESTORED TO NATURAL STATE AFTER CONSTRUCTION BY THE CONTRACTOR. THIS INCLUDES ALL AREAS IN & OUT OF THE CONSTRUCTION SITE. 14. AN INITIAL AF IMT 103 SHALL BE FULLY COORDINATED WITH ALL REQUIRED BASE AGENCIES AND SUBMITTED AT THE BEGINNING OF THE PROJECT FOR THE GENERAL AN INITIAL AF IMT 103 SHALL BE FULLY COORDINATED WITH ALL REQUIRED BASE AGENCIES AND SUBMITTED AT THE BEGINNING OF THE PROJECT FOR THE GENERAL PROJECT ITSELF. 15. A SUBSEQUENT AF IMT 103 SHALL BE SUBMITTED 30 DAYS PRIOR EACH UTILITY CHECK REQUESTS AND "PHASES" OF THE PROJECT (IF THE PREVIOUS AF IMT 103 IS A SUBSEQUENT AF IMT 103 SHALL BE SUBMITTED 30 DAYS PRIOR EACH UTILITY CHECK REQUESTS AND "PHASES" OF THE PROJECT (IF THE PREVIOUS AF IMT 103 IS MORE THAN 90 DAYS OLD). ALL SUBSEQUENT AF IMT 103S SHALL BE COORDINATED W/ ONLY THE CE O&M SHOPS AND THE COMMUNICATION SQUADRON AND SUBMITTED WITH COPIES OF ALL PREVIOUS AF IMT 103S. 16. CONTRACTOR SHALL OBTAIN APPROVED AF IMT 103 FROM THE CONSTRUCTION MANAGEMENT OFFICE BEFORE STARTING ANY WORK AND HAVE A COPY OF THE AF IMT 103 CONTRACTOR SHALL OBTAIN APPROVED AF IMT 103 FROM THE CONSTRUCTION MANAGEMENT OFFICE BEFORE STARTING ANY WORK AND HAVE A COPY OF THE AF IMT 103 AND DRAWINGS ON SITE AT ALL TIMES. 17. INCLUDE 3 WEEKS AT THE END OF THE PROJECT FOR PRE-FINAL/FINAL INSPECTIONS, O&M TRAINING, ETC. (IF O&M CANNOT MAKE IT AT FIRST REQUEST, IT CAN BE INCLUDE 3 WEEKS AT THE END OF THE PROJECT FOR PRE-FINAL/FINAL INSPECTIONS, O&M TRAINING, ETC. (IF O&M CANNOT MAKE IT AT FIRST REQUEST, IT CAN BE SLIPPED FOR TO THE FOLLOWING WEEK). 18. IN ACCORDANCE WITH FAR CLAUSE 52.236-21 (E AND F) SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION: IN ACCORDANCE WITH FAR CLAUSE 52.236-21 (E AND F) SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION: (E) APPROVAL OF SHOP DRAWINGS BY THE CONTRACTING OFFICER SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ANY ERRORS OR OMISSIONS IN SUCH APPROVAL OF SHOP DRAWINGS BY THE CONTRACTING OFFICER SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ANY ERRORS OR OMISSIONS IN SUCH DRAWINGS, NOR FROM RESPONSIBILITY FOR COMPLYING WITH THE REQUIREMENTS OF THIS CONTRACT, EXCEPT WITH RESPECT TO VARIATIONS DESCRIBED AND APPROVED IN ACCORDANCE WITH (F) BELOW.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .