CCEB 21-1047.xls
XLS spreadsheet 185 KB Posted
- Solicitation number
- FA568223R0009
About this file
This is a construction cost estimate breakdown for the ASHE 21-1047 project to renovate a medium voltage substation facility 1305 at Aviano Air Base in Italy. The estimate includes line items for demolition, architectural and civil work, mechanical work, electrical work, fire prevention work, and a total proposed price. It provides unit costs and quantities for materials, labor hours and rates, and other direct costs for each work item. The attached federal contract opportunity notice indicates the solicitation will be issued in June 2023 for the ASHE 21-1047 project with a magnitude of construction between $500,000 and $1,000,000. Interested vendors must possess a current Statement of Capabilities certification for category OG10. The work will be performed in Italy according to DFARS provisions and must comply with Italian labor law D.Lgs. 81/2008.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE 21-1047_Dwgs_100.pdf | ||
| ASHE 21-1047_Dwgs 1_2.pdf | ||
| ASHE 21-1047_PSC.pdf | ||
| ASHE 21-1047_CCEB.pdf | ||
| ASHE 21-1047_Tech Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASHE 21-1047
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||||
| CONTRACTOR | ADDRESS | ||||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||
| RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305 | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||
| ASHE 21-1047 | AREA F - AVIANO AIR BASE | ||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||
| Ia Architectural Demolitions - Demolizioni Architettoniche | |||||||||||||
| 1 | ACM/PACM REMOVAL | ||||||||||||
| Rimozione materiali contenente amianto | IT. No. Art. n. | 1 | Ls/Ac | ||||||||||
| 2 | REMOVAL OF CONCRETE STEPS | ||||||||||||
| Rimozione di gradini in calcestruzzo | IT. No. Art. n. | 2 | Ls/Ac | ||||||||||
| 3 | REMOVAL OF CNC PAD AND METAL RAILS | ||||||||||||
| Rimozione di basamento in calcestruzzo e guide metalliche | IT. No. Art. n. | 3 | Ls/Ac | ||||||||||
| 4 | REMOVAL OF PLASTER FROM CEILINGS | ||||||||||||
| Rimozione di intonaco dai soffitti | IT. No. Art. n. | 4 | Sq.m/Mq | ||||||||||
| 5 | SLOTS OPENING ON ROOF SLAB FOR NEW FAN | ||||||||||||
| Apertura di asole su solaio copertura per nuovi ventilatori | IT. No. Art. n. | 5 | Ea/No | ||||||||||
| 6 | SURVEYED DEMOLITION OF BEARING WALLS | ||||||||||||
| demolizione controllata di murature portanti | IT. No. Art. n. | 6 | Cu.m/Mc | ||||||||||
| 7 | DOORS PASSAGEWAY OPENINGS | ||||||||||||
| Apertura vani porta | IT. No. Art. n. | 7 | Sq.m/Mq | ||||||||||
| 8 | STEEL DOOR AND GRATES REMOVAL | ||||||||||||
| Rimozione porta e grata in acciaio | IT. No. Art. n. | 8 | Ea/No | ||||||||||
| 9 | REMOVAL OF 4+4mm WATERPROOFING MEMBRANE | ||||||||||||
| Rimozione di doppia guaina impermeabile, 4+4mmi | IT. No. Art. n. | 9 | Sq.m/Mq | ||||||||||
| Total Architectural - Totale Architettonico | |||||||||||||
| Ib Civil Demolitions - Demolizioni Civili | |||||||||||||
| 10 | REMOVAL OF METAL FENCES, H=250cm | ||||||||||||
| Rimozione di recinzione metallica, H=250cm | IT. No. Art. n. | 10 | Sq.m/Mq | ||||||||||
| 11 | EXCAVATION IN ANY KIND OF SOIL AND COMPACTNESS | ||||||||||||
| Scavo in terreno di qualsiasi natura e compattezza | IT. No. Art. n. | 11 | Cu.m/Mc | ||||||||||
| Total Civil - Totale Civile | |||||||||||||
| Ic Mechanical Demolitions - Demolizioni Meccaniche | |||||||||||||
| 12 | REMOVAL OF EXISTING VENTILATION SYSTEM | ||||||||||||
| Rimozione di impianto di ventilazione esistente | IT. No. Art. n. | 12 | Ls/Ac | ||||||||||
| Total Mechanical - Totale Meccanico | |||||||||||||
| Id Electrical Demolitions - Demolizioni Elettriche | |||||||||||||
| 13 | REMOVAL OF CAST RESIN TRANSFORMER, INCL METAL ENCLOSURE | ||||||||||||
| Rimozione di Trasformatore in resina, incl box metallico | IT. No. Art. n. | 13 | Ls/Ac | ||||||||||
| 14 | REMOVAL OF ELECTRICAL LV SWITCHGEARS AND PANELS INCLUDING CABLES AND CONDUITS | ||||||||||||
| Rimozione di quadri elettrici e pannelli compresi cavi e tubazioni | IT. No. Art. n. | 14 | Ls/Ac | ||||||||||
| 15 | REMOVAL OF ELECTRICAL HV AND LV CABLES AND CONDUITS | ||||||||||||
| Rimozione di cavi e tubazioni di MT e BT | IT. No. Art. n. | 15 | Ls/Ac | ||||||||||
| 16 | REMOVAL OF TELEMETERING/TELEMONITORING PANEL | ||||||||||||
| Rimozione di Quadro Telemisura/Telemonitoraggio | IT. No. Art. n. | 16 | Ls/Ac | ||||||||||
| 17 | REMOVAL OF LIGHTING FIXTURES AND OUTLETS, INCL WIRINGS | ||||||||||||
| Rimozione elementi illuminanti, incluso pese e cablaggi | IT. No. Art. n. | 17 | Ls/Ac | ||||||||||
| 18 | REMOVAL OF BACK_UP GENERATOR | ||||||||||||
| Rimozione Generatore di riserva | IT. No. Art. n. | 18 | Ls/Ac | ||||||||||
| 19 | REMOVE FIRE ALARM SYSTEM | ||||||||||||
| Rimozione Impianto Allarme Incendi | IT. No. Art. n. | 19 | Ls/Ac | ||||||||||
| Total Electrical - Totale Elettrico | |||||||||||||
| TOTAL PART I / Totale Parte I | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||
| PART II - ARCHITECTURAL AND CIVIL WORK / Parte II - Lavori Architettonici e Civili | |||||||||||||
| IIa Architectural and Structural Work - IIa Lavori Architettonici e Strutturali | |||||||||||||
| 20 | PAINTING OF INTERIOR SURFACES. CEILINGS | ||||||||||||
| Pitturazione delle superfici interne. Soffitti | IT. No. Art. n. | 1a | Sq.m/Mq | ||||||||||
| 21 | PAINTING OF INTERIOR SURFACES. WALLS | ||||||||||||
| Pitturazione delle superfici interne, Pareti | IT. No. Art. n. | 1b | Sq.m/Mq | ||||||||||
| 22 | PAINTING OF EXTERIOR SURFACES, INCL PREPARATION | ||||||||||||
| Pitturazione delle superfici esterne, incl preparazione | IT. No. Art. n. | 2 | Sq.m/Mq | ||||||||||
| 23 | PAINTING OF METAL SURFACES | ||||||||||||
| Tinteggiatura delle superfici metalliche | IT. No. Art. n. | 3 | Sq.m/Mq | ||||||||||
| 24 | NEW 4+4mm WATERPROOFING MEMBRANE | ||||||||||||
| Nuova doppia guaina impermeabile, 4+4mm | IT. No. Art. n. | 4 | Sq.m/Mq | ||||||||||
| 25 | NEW VERMICULITE BASED PLASTER ON CEILINGS | ||||||||||||
| Nuovo intonaco a base di vermiculite sui soffitti | IT. No. Art. n. | 5 | Sq.m/Mq | ||||||||||
| 26 | EXISTING INDUSTRIAL CNC FLOOR RENOVATION | ||||||||||||
| Ripristino pavimentazione industriale in calcestruzzo | IT. No. Art. n. | 6 | Sq.m/Mq | ||||||||||
| 27 | NEW MOUSE SCREEN, INCL, FRAME | ||||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 7 | Ea/No | ||||||||||
| 28 | EXISTING DOOR RENOVATION | ||||||||||||
| Manutenzione porte esistenti | IT. No. Art. n. | 8 | Ls/Ac | ||||||||||
| 29 | PANIC BAR INSTALLATION | ||||||||||||
| Installazione barra antipanico | IT. No. Art. n. | 9 | EA/NO | ||||||||||
| 30 | NEW GENSET CNC PAD | ||||||||||||
| Nuovo basamento generatore | IT. No. Art. n. | 10 | Sq.m/Mq | ||||||||||
| 31 | EXISTING LOUVER BLOCK-UP | ||||||||||||
| Chiusura vani griglia | IT. No. Art. n. | 11 | Cu.m/Mc | ||||||||||
| 32 | NEW PARTITION WALL, W1 TYPE | ||||||||||||
| Nuovo tramezzo, tipo W1 | IT. No. Art. n. | 12 | Sq.m/Mq | ||||||||||
| 33 | NEW STEEL DOOR, Di1 TYPE - 140*220 | ||||||||||||
| Nuova porta in acciaio, tipo Di1 | IT. No. Art. n. | 13a | Ea/No | ||||||||||
| 34 | NEW STEEL DOOR, Di2 TYPE - 90*210 | ||||||||||||
| Nuova porta in acciaio, tipo Di2 | IT. No. Art. n. | 13b | Ea/No | ||||||||||
| 35 | NEW VENTILATION GRILLE | ||||||||||||
| Nuova griglia di ventilazione | IT. No. Art. n. | 14 | Ea/No | ||||||||||
| 36 | CLEANING AND SEALING OF CABLE CROSSINGS | ||||||||||||
| Pulizia trincee e sigillatura attraversamenti cavi | IT. No. Art. n. | 15 | Ls/Ac | ||||||||||
| 37 | EXISTING CABLE TRENCH CLOSURE | ||||||||||||
| Chiusura trincee esistenti | IT. No. Art. n. | 16 | Sq.m/Mq | ||||||||||
| 38 | NEW FLOOR CABLE TRENCH | ||||||||||||
| Nuova trincea cavi a pavimento | IT. No. Art. n. | 17 | Lm/Ml | ||||||||||
| 39 | SAFETY GALVANIZED STEEL RAIL | ||||||||||||
| Parapetto di sicurezza in acciaio zincato | IT. No. Art. n. | 18 | Kg | ||||||||||
| 40 | NEW STEEL SHEET FLASHING | ||||||||||||
| Nuove scosaline in lamiere di acciaio | IT. No. Art. n. | 19 | Sq.m/Mq | ||||||||||
| 41 | CALCIUM SILICATE LINING | ||||||||||||
| Rivestimento in silicato di calcio | IT. No. Art. n. | 20 | Sq.m/Mq | ||||||||||
| 42 | S275JR STEEL FRAME | ||||||||||||
| Telaio in acciaio S275JR | IT. No. Art. n. | 21 | Kg | ||||||||||
| Total Architectural and Structural Work - Totale Lavori Architettonici e Strutturali | |||||||||||||
| IIb Civil Work - IIb Lavori Civili | |||||||||||||
| 43 | EXISTING EXT CNC SIDEWALK REPAIR | ||||||||||||
| Ripristino marciapiede esistente in cls | IT. No. Art. n. | 1 | Sq.m/Mq | ||||||||||
| 44 | NEW BITUMINOUS CONCRETE PAVEMENT | ||||||||||||
| Nuova pavimentazione in conglomerato bituminoso | IT. No. Art. n. | 2 | Sq.m/Mq | ||||||||||
| 45 | NEW CHAIN LINK FENCE AND GATES, H=250cm | ||||||||||||
| Nuova recinzione a maglie metalliche e cancelli, H=250cm | IT. No. Art. n. | 3 | Lm/Ml | ||||||||||
| 46 | RENOVATION OF EXISTING MANHOLES | ||||||||||||
| Ripristino pozzetti esistenti | IT. No. Art. n. | 4 | Ls/Ac | ||||||||||
| 47 | INFILTRATION SWALE | ||||||||||||
| Cunetta drenante | IT. No. Art. n. | 5 | Ls/Ac | ||||||||||
| Total Civil Work - Totale Lavori Civili | |||||||||||||
| TOTAL PART II / Totale Parte II | |||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||||||||||||
| 48 | DUCTED AXIAL EXHAUST FAN | ||||||||||||
| Estrattori assiali | IT. No. Art. n. | 1 | Ea/No | ||||||||||
| 49 | FUEL FEEDING SYSTEM FOR GENSET | ||||||||||||
| Sistema di alimentazione del gasolio | IT. No. Art. n. | 2 | LS/AC | ||||||||||
| Total Mechanical Work - Totale Lavori Meccanici | |||||||||||||
| TOTAL PART III / Totale Parte III | |||||||||||||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | |||||||||||||
| IVa Power System - IVa Impianto FM | |||||||||||||
| 50 | INSTALLATION OF EQUIPMENT PREVIOUSLY REMOVED | ||||||||||||
| Installazione di apparecchiature precedentemente rimosse | IT. No. Art. n. | 1 | Ls/Ac | 0.00 | |||||||||
| 51 | HV TRANSFORMER PROTECTION UIT | ||||||||||||
| Unità di MT Protezione trasformatore | IT. No. Art. n. | 2 | Ea/No | 0.00 | |||||||||
| 52 | HV SWITCHGEAR UPGRADING | ||||||||||||
| Adeguamento Unità di MT | IT. No. Art. n. | 3 | Ls/Ac | 0.00 | |||||||||
| 53 | TRANSFORMER 250 kVA | ||||||||||||
| Trasformatore 250 kVA | IT. No. Art. n. | 4 | Ea/No | 0.00 | |||||||||
| 54 | TRANSFORMER 250 kVA BOX | ||||||||||||
| Contenitore Trasformatore 250 kVA | IT. No. Art. n. | 5 | Ea/No | 0.00 | |||||||||
| 55 | BACK-UP GENERATOR 250 kVA | ||||||||||||
| Generatore di riserva 250 KVA | IT. No. Art. n. | 6 | Ea/No | 0.00 | |||||||||
| 56 | MANUAL TRANSFER SWITCH SYSTEM | ||||||||||||
| Sistema commutazione manuale | IT. No. Art. n. | 7 | Ls/Ac | 0.00 | |||||||||
| 57 | LOAD BENCH SYSTEM | ||||||||||||
| Impianto carico in prova | IT. No. Art. n. | 8 | Ls/Ac | 0.00 | |||||||||
| 58 | 400V LOW VOLTAGE SWITCHGEAR | ||||||||||||
| Quadro BT 400V | IT. No. Art. n. | 9 | Ea/No | 0.00 | |||||||||
| 59 | SPD | ||||||||||||
| SPD | IT. No. Art. n. | 10 | Ea/No | 0.00 | |||||||||
| 60 | HV CABLES | ||||||||||||
| Cavi MT | IT. No. Art. n. | 11a | Lm/Ml | 0.00 | |||||||||
| 61 | LV CABLES 3x1x240+1x120N+1x120PE FG16M16 | ||||||||||||
| Cavi BT 3x1x240+1x120N+1x120PE FG16M16 | IT. No. Art. n. | 11b | Lm/Ml | 0.00 | |||||||||
| 62 | LV CABLES 3x1x240+1x120N+1x120PE FG16M16 | ||||||||||||
| Cavi BT 3x1x240+1x120N+1x120PE FG16M16 | IT. No. Art. n. | 11c | Lm/Ml | 0.00 | |||||||||
| 63 | LV CABLES 3x1x240+1x120N+1x120PE FG16M16 | ||||||||||||
| Cavi BT 3x1x240+1x120N+1x120PE FG16M16 | IT. No. Art. n. | 11d | Lm/Ml | 0.00 | |||||||||
| 64 | LV CABLES 3x1x120+1x70N+1x70PE FG16M16 | ||||||||||||
| Cavi BT 3x1x120+1x70N+1x70PE FG16M16 | IT. No. Art. n. | 11e | Lm/Ml | 0.00 | |||||||||
| 65 | LV CABLES 3x1x240+1x120N+1x120PE FG16M16 | ||||||||||||
| Cavi BT 3x1x240+1x120N+1x120PE FG16M16 | IT. No. Art. n. | 11f | Lm/Ml | 0.00 | |||||||||
| 66 | LV CABLES 3,5x70+35PE FG16OM16 | ||||||||||||
| Cavi BT 3,5x70+35PE FG16OM16 | IT. No. Art. n. | 11g | Lm/Ml | 0.00 | |||||||||
| 67 | LV CABLES 3,5x70+35PE FG16OM16 | ||||||||||||
| Cavi BT 3,5x70+35PE FG16OM16 | IT. No. Art. n. | 11h | Lm/Ml | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 68 | LV CABLES 3x1x240+120PE FG16OM16 | ||||||||||||
| Cavi BT 3x1x240+120PE FG16OM16 | IT. No. Art. n. | 11i | Lm/Ml | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 69 | 50 KVA AUTOTRANSFORMER INCL METAL ENCLOSURE | ||||||||||||
| Autotrasformatore 50kVA incl box metallico | IT. No. Art. n. | 12 | Ea/No | 0.00 | |||||||||
| 70 | SUBSTATION SERVICE PANEL | ||||||||||||
| Quadro servizi cabina | IT. No. Art. n. | 13 | Ea/No | 0.00 | |||||||||
| 71 | EXHAUST FAN CONTROL PANEL | ||||||||||||
| Quadro Sistema Ventilazione | IT. No. Art. n. | 14 | Ea/No | 0.00 | |||||||||
| 72 | DDC PANEL | ||||||||||||
| Quadro Dcc | IT. No. Art. n. | 15 | Ea/No | 0.00 | |||||||||
| 73 | AUTOMATIC POWER FACTOR CORRECTION UNIT | ||||||||||||
| Unità di rifasamento automatico | IT. No. Art. n. | 16 | Ea/No | 0.00 | |||||||||
| 74 | 100x50 METAL CABLE TRAY | ||||||||||||
| Canaletta metallica 100x50 | IT. No. Art. n. | 17a | Lm/Ml | 0.00 | |||||||||
| 75 | 300x100 METAL CABLE TRAY | ||||||||||||
| Canaletta metallica 300x100 | IT. No. Art. n. | 17b | Lm/Ml | 0.00 | |||||||||
| 76 | 16A INTERLOCKED OUTLET | ||||||||||||
| Presa interbloccata 16 A | IT. No. Art. n. | 18 | Ea/No | 0.00 | |||||||||
| 77 | OUTLET POINT | ||||||||||||
| Punto Presa | IT. No. Art. n. | 19 | Ea/No | 0.00 | |||||||||
| 78 | WALL BOX | ||||||||||||
| Contenitore a parete | IT. No. Art. n. | 20 | Ea/No | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | |||
| 79 | NEW TEL/TEL SYSTEM AND WIRING SYSTEM | ||||||||||||
| Nuovo impianto TEL/TEL e Cablaggio | IT. No. Art. n. | 21 | Ls/Ac | 0.00 | 0.00 | ||||||||
| 80 | NEW GROUNDING SYSTEM | ||||||||||||
| Nuovo impianto di Terra | IT. No. Art. n. | 22 | Ls/Ac | 0.00 | 0.00 | ||||||||
| 81 | NEW GROUNDING TESTS | ||||||||||||
| Nuove Prove Impianto di terra | IT. No. Art. n. | 23 | Ls/Ac | 0.00 | 0.00 | 0.00 | |||||||
| Total Power System - Torale Impianto FM | 0.00 | 0.00 | |||||||||||
| IVb Lighting system - IVb Impianto Illuminazione | |||||||||||||
| 82 | 36 W LED LIGHTING FIXTURE | ||||||||||||
| Lampada a LED 36 W | IT. No. Art. n. | 24 | Ea/No | 0.00 | 0.00 | ||||||||
| 83 | 8 W LED EMERGENCY LIGHTING FIXTURE | ||||||||||||
| Lampada di emergenza LED 8 W | IT. No. Art. n. | 25 | Ea/No | 0.00 | 0.00 | ||||||||
| 84 | 53 W LED FLOODLIGHT | ||||||||||||
| Proiettore da 53 W a LED | IT. No. Art. n. | 26 | Ea/No | 0.00 | 0.00 | ||||||||
| 85 | LIGHTING POINT | ||||||||||||
| PunLuce | IT. No. Art. n. | 27 | Ea/No | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | |||
| Total Lighting system - Totale Impianto Illuminazione | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||
| IVc Fire Alarm System - IVc Impianto Allarme Incendio | |||||||||||||
| 86 | OPTICAL SMOKE DETECTORS | ||||||||||||
| Rilavatori di Fumo Ottiici | IT. No. Art. n. | 28 | EA/NO | 0.00 | 0.00 | 0.00 | |||||||
| 87 | RATE OF RISE DETECTORS | ||||||||||||
| Rilavatori di Fumo termovelocimetrici | IT. No. Art. n. | 29 | EA/NO | 0.00 | 0.00 | 0.00 | |||||||
| 88 | MANUAL PULLING STATIONS | ||||||||||||
| Pulsanti Manuali di Allarme | IT. No. Art. n. | 30 | EA/NO | 0.00 | 0.00 | 0.00 | |||||||
| 89 | AUDIO/VISUAL DEVICES | ||||||||||||
| Dispositivi audiovisivi | IT. No. Art. n. | 31 | EA/NO | 0.00 | 0.00 | 0.00 | |||||||
| 90 | FIRE ALARM VISUAL PANEL | ||||||||||||
| Pannelli di allarme incendio | IT. No. Art. n. | 32 | EA/NO | 0.00 | 0.00 | 0.00 | |||||||
| 91 | AM 8200 FIRE ALARM PANEL | ||||||||||||
| Centrale antincendio AM 8200 | IT. No. Art. n. | 33 | EA/NO | 0.00 | 0.00 | 0.00 | |||||||
| 92 | FTG10OM1 2X1,5sq.mm CABLE | ||||||||||||
| Cavo FTG10OM1 2x1,5mm2 | IT. No. Art. n. | 34 | LM/ML | 0.00 | 0.00 | 0.00 | |||||||
| 93 | TESTING ON F/A SYSTEM | ||||||||||||
| Prove impianto F/A | IT. No. Art. n. | 35 | LS/LC | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Total Fire Alarm System - Total Impianto Allarme Incendio | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||
| Total Substation - Totale Cabina Elettrica | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||
| IVd Site Work - Ivd Lavori Esterni | |||||||||||||
| 94 | TEMPORARY SUBSTATION | ||||||||||||
| Cabina Temporanea | IT. No. Art. n. | 36 | Ls/Ac | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | |||
| Total Site Work - Totale Lavori Esterni | |||||||||||||
| TOTAL PART IV - Totale Parte IV | |||||||||||||
| PART V - FIRE PREVENTION/ Parte V - Prevenzione Incendi | |||||||||||||
| 95 | CPI PROCUREMENTS | ||||||||||||
| Ottenimento Certificato Prevenzioen incendi | IT. No. Art. n. | 1 | LS/AC | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 96 | FIRE ESTINGUISHER | ||||||||||||
| Estintore | IT. No. Art. n. | 2 | EA/NO | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | ||
| 97 | FIRE PREVENTION SIGNS | ||||||||||||
| Segnaletica antincendio | IT. No. Art. n. | 3 | LS/AC | 0.00 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | ||
| Total Fire Prevention - Totale Prevenzione Incendi | 0.00 | 0.00 | 0.00 | 0.00 | |||||||||
| SUMMARY / Riepilogo | |||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||||||||
| PART III - MECHANICAL WORK | |||||||||||||
| PART IV - ELECTRICAL WORK | |||||||||||||
| PART V - FIRE PREVENTION | |||||||||||||
| TOTAL PRICE / Costo Totale |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N
Grand Total
| ASHE 21-1047 RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305 | |||
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | |||
| TOTAL MATERIAL COSTS | € | ||
| TOTAL LABOR COSTS | € | ||
| TOTAL OTHER DIRECT COSTS | € | ||
| TOTAL DIRECT COSTS | € | ||
| OVERHEAD | € | ||
| SUBTOTAL | € | ||
| PROFIT | € | ||
| TOTAL PRICE | € | ||
| DATE | FIRM NAME | ||
| TITLE | BY | ||
| INSTRUCTIONS TO OFFERORS |
&R&P of &N Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
File details come from the government source that posted it. Updated .