ASHE 21-1047_CCEB.pdf

PDF 305 KB Posted

Attached to
ASHE 21-1047, RENOVATE MEDIUM VOLTAGE SUBSTATION FAC. 1305, AVIANO AB, ITALY
Solicitation number
FA568223R0009
Issued by

About this file

This document is a construction cost estimate breakdown for the renovation of a medium voltage substation facility at Aviano Air Base in Italy. The estimate includes line items for demolition, architectural, civil, mechanical and electrical work. Demolition items include the removal of existing ventilation systems, electrical switchgear and panels, lighting fixtures, and a backup generator. Architectural work comprises painting, waterproofing, plastering and installation of doors, partitions and ventilation grilles. Electrical work includes installation of a 250kVA transformer and generator, switchgear, cables, lighting fixtures and a fire alarm system. The total estimated cost is provided in Euros along with calculations for overhead, profit and total price.

View the file

Other files

File Type Posted
ASHE 21-1047_Dwgs_100.pdf PDF
CCEB 21-1047.xls XLS spreadsheet
ASHE 21-1047_Dwgs 1_2.pdf PDF
ASHE 21-1047_PSC.pdf PDF
ASHE 21-1047_Tech Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared and Submitted by:

Architecture, Engineering and Consulting Services

Via di Sacco Pastore n. 4 - Rome, Italy Tel. +39.06.97848041 fax +39.06.97848175

E-mail: design@soinci.it

31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON

31st CES/CENM PROJECT MANAGEMENT ELEMENT

PROJECT ASHE 21-1047

RENOVATE MEDIUM VOLTAGE SUBSTATION

FAC.1305

AVIANO AIR BASE, ITALY

CONSTRUCTION COST ESTIMATE BREAKDOWN

FINAL SUBMITTAL (100%)

Date: May 2023

A/E CONTRACT No.: FA568220D0006 Task Order FA568222F0081

FOR OFFICIAL USE ONLY

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Pa rte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolitions - Demolizioni Architet toniche

1 ACM/PACM REMOVAL

Rimozione materiali contenente amianto

IT. No.

Art. n.

1 Ls/Ac

2 REMOVAL OF CONCRETE STEPS

Rimozione di gradini in calcestruzzo

IT. No.

Art. n.

2 Ls/Ac

3 REMOVAL OF CNC PAD AND METAL RAILS

Rimozione di basamento in calcestruzzo e guide metalliche

IT. No.

Art. n.

3 Ls/Ac

4 REMOVAL OF PLASTER FROM CEILINGS

Rimozione di intonaco dai soffitti

IT. No.

Art. n.

4 Sq.m/Mq

5 SLOTS OPENING ON ROOF SLAB FOR NEW FAN

Apertura di asole su solaio copertura per nuovi ventilatori

IT. No.

Art. n.

5 Ea/No

6 SURVEYED DEMOLITION OF BEARING WALLS

demolizione controllata di murature portanti

IT. No.

Art. n.

6 Cu.m/Mc

7 DOORS PASSAGEWAY OPENINGS

Apertura vani porta

IT. No.

Art. n.

7 Sq.m/Mq

8 STEEL DOOR AND GRATES REMOVAL

Rimozione porta e grata in acciaio

IT. No.

Art. n.

8 Ea/No

9 REMOVAL OF 4+4mm WATERPROOFING MEMBRANE Rimozione di doppia guaina impermeabile, 4+4mmi

IT. No.

Art. n.

9 Sq.m/Mq

Total Architectural - Totale Architettonico

Ib Civil Demolitions - Demolizioni Civili

10 REMOVAL OF METAL FENCES, H=250cm Rimozione di recinzione metallica, H=250cm

IT. No.

Art. n.

10 Sq.m/Mq

11 EXCAVATION IN ANY KIND OF SOIL AND COMPACTNESS

Scavo in terreno di qualsiasi natura e compattezza

IT. No.

Art. n.

11 Cu.m/Mc

Total Civil - Totale Civile

FOR OFFICIAL USE ONLY 1 of 10

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Ic Mechanical Demolitions - Demolizioni Meccaniche

12 REMOVAL OF EXISTING VENTILATION SYSTEM

Rimozione di impianto di ventilazione esistente

IT. No.

Art. n.

12 Ls/Ac

Total Mechanical - Totale Meccanico

Id Electrical Demolitions - Demolizioni Elettriche

REMOVAL OF CAST RESIN TRANSFORMER, INCL METAL

ENCLOSURE

Rimozione di Trasformatore in resina, incl box metallico

IT. No.

Art. n.

13 Ls/Ac

REMOVAL OF ELECTRICAL LV SWITCHGEARS AND PANELS

INCLUDING CABLES AND CONDUITS

Rimozione di quadri elettrici e pannelli compresi cavi e tubazioni

IT. No.

Art. n.

14 Ls/Ac

REMOVAL OF ELECTRICAL HV AND LV CABLES AND

CONDUITS

Rimozione di cavi e tubazioni di MT e BT

IT. No.

Art. n.

15 Ls/Ac

16 REMOVAL OF TELEMETERING/TELEMONITORING PANEL

Rimozione di Quadro Telemisura/Telemonitoraggio

IT. No.

Art. n.

16 Ls/Ac

REMOVAL OF LIGHTING FIXTURES AND OUTLETS, INCL

WIRINGS

Rimozione elementi illuminanti, incluso pese e cablaggi

IT. No.

Art. n.

17 Ls/Ac

18 REMOVAL OF BACK_UP GENERATOR

Rimozione Generatore di riserva

IT. No.

Art. n.

18 Ls/Ac

19 REMOVE FIRE ALARM SYSTEM

Rimozione Impianto Allarme Incendi

IT. No.

Art. n.

19 Ls/Ac

Total Electrical - Totale Elettrico

TOTAL PART I / Totale Parte I

FOR OFFICIAL USE ONLY 2 of 10

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART II - ARCHITECTURAL AND CIVIL WORK / Parte II - Lavori Architettonici e Civili

IIa Architectural and Structural Work - IIa Lavori Architettonici e Strutturali

20 PAINTING OF INTERIOR SURFACES. CEILINGS

Pitturazione delle superfici interne. Soffitti

IT. No.

Art. n.

1a Sq.m/Mq

21 PAINTING OF INTERIOR SURFACES. WALLS

Pitturazione delle superfici interne, Pareti

IT. No.

Art. n.

1b Sq.m/Mq

22 PAINTING OF EXTERIOR SURFACES, INCL PREPARATION

Pitturazione delle superfici esterne, incl preparazione

IT. No.

Art. n.

2 Sq.m/Mq

23 PAINTING OF METAL SURFACES

Tinteggiatura delle superfici metalliche

IT. No.

Art. n.

3 Sq.m/Mq

24 NEW 4+4mm WATERPROOFING MEMBRANE Nuova doppia guaina impermeabile, 4+4mm

IT. No.

Art. n.

4 Sq.m/Mq

25 NEW VERMICULITE BASED PLASTER ON CEILINGS

Nuovo intonaco a base di vermiculite sui soffitti

IT. No.

Art. n.

5 Sq.m/Mq

26 EXISTING INDUSTRIAL CNC FLOOR RENOVATION

Ripristino pavimentazione industriale in calcestruzzo

IT. No.

Art. n.

6 Sq.m/Mq

27 NEW MOUSE SCREEN, INCL, FRAME

Nuova rete antitopo, incluso telaio

IT. No.

Art. n.

7 Ea/No

28 EXISTING DOOR RENOVATION

Manutenzione porte esistenti

IT. No.

Art. n.

8 Ls/Ac

29 PANIC BAR INSTALLATION

Installazione barra antipanico

IT. No.

Art. n.

9 EA/NO

30 NEW GENSET CNC PAD

Nuovo basamento generatore

IT. No.

Art. n.

10 Sq.m/Mq

31 EXISTING LOUVER BLOCK-UP

Chiusura vani griglia

IT. No.

Art. n.

11 Cu.m/Mc

32 NEW PARTITION WALL, W1 TYPE

Nuovo tramezzo, tipo W1

IT. No.

Art. n.

12 Sq.m/Mq

33 NEW STEEL DOOR, Di1 TYPE - 140*220 Nuova porta in acciaio, tipo Di1

IT. No.

Art. n.

13a Ea/No

34 NEW STEEL DOOR, Di2 TYPE - 90*210 Nuova porta in acciaio, tipo Di2

IT. No.

Art. n.

13b Ea/No

35 NEW VENTILATION GRILLE

Nuova griglia di ventilazione

IT. No.

Art. n.

14 Ea/No

36 CLEANING AND SEALING OF CABLE CROSSINGS

Pulizia trincee e sigillatura attraversamenti cavi

IT. No.

Art. n.

15 Ls/Ac

FOR OFFICIAL USE ONLY 3 of 10

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

37 EXISTING CABLE TRENCH CLOSURE

Chiusura trincee esistenti

IT. No.

Art. n.

16 Sq.m/Mq

38 NEW FLOOR CABLE TRENCH

Nuova trincea cavi a pavimento

IT. No.

Art. n.

17 Lm/Ml

39 SAFETY GALVANIZED STEEL RAIL

Parapetto di sicurezza in acciaio zincato

IT. No.

Art. n.

18 Kg

40 NEW STEEL SHEET FLASHING

Nuove scosaline in lamiere di acciaio

IT. No.

Art. n.

19 Sq.m/Mq

41 CALCIUM SILICATE LINING

Rivestimento in silicato di calcio

IT. No.

Art. n.

20 Sq.m/Mq

42 S275JR STEEL FRAME

Telaio in acciaio S275JR

IT. No.

Art. n.

21 Kg

Total Architectural and Structural Work - Totale La vori Architettonici e Strutturali

IIb Civil Work - IIb Lavori Civili

43 EXISTING EXT CNC SIDEWALK REPAIR

Ripristino marciapiede esistente in cls

IT. No.

Art. n.

1 Sq.m/Mq

44 NEW BITUMINOUS CONCRETE PAVEMENT

Nuova pavimentazione in conglomerato bituminoso

IT. No.

Art. n.

2 Sq.m/Mq

45 NEW CHAIN LINK FENCE AND GATES, H=250cm Nuova recinzione a maglie metalliche e cancelli, H=250cm

IT. No.

Art. n.

3 Lm/Ml

46 RENOVATION OF EXISTING MANHOLES

Ripristino pozzetti esistenti

IT. No.

Art. n.

4 Ls/Ac

47 INFILTRATION SWALE

Cunetta drenante

IT. No.

Art. n.

5 Ls/Ac

Total Civil Work - Totale Lavori Civili

TOTAL PART II / Totale Parte II

FOR OFFICIAL USE ONLY 4 of 10

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Mec canici

48 DUCTED AXIAL EXHAUST FAN

Estrattori assiali

IT. No.

Art. n.

1 Ea/No

49 FUEL FEEDING SYSTEM FOR GENSET

Sistema di alimentazione del gasolio

IT. No.

Art. n.

2 LS/AC

Total Mechanical Work - Totale Lavori Meccanici

TOTAL PART III / Totale Parte III

PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettr ici

IVa Power System - IVa Impianto FM

50 INSTALLATION OF EQUIPMENT PREVIOUSLY REMOVED

Installazione di apparecchiature precedentemente rimosse

IT. No.

Art. n.

1 Ls/Ac

51 HV TRANSFORMER PROTECTION UIT

Unità di MT Protezione trasformatore

IT. No.

Art. n.

2 Ea/No

52 HV SWITCHGEAR UPGRADING

Adeguamento Unità di MT

IT. No.

Art. n.

3 Ls/Ac

53 TRANSFORMER 250 kVA Trasformatore 250 kVA

IT. No.

Art. n.

4 Ea/No

54 TRANSFORMER 250 kVA BOX Contenitore Trasformatore 250 kVA

IT. No.

Art. n.

5 Ea/No

55 BACK-UP GENERATOR 250 kVA Generatore di riserva 250 KVA

IT. No.

Art. n.

6 Ea/No

56 MANUAL TRANSFER SWITCH SYSTEM

Sistema commutazione manuale

IT. No.

Art. n.

7 Ls/Ac

57 LOAD BENCH SYSTEM

Impianto carico in prova

IT. No.

Art. n.

8 Ls/Ac

58 400V LOW VOLTAGE SWITCHGEAR

Quadro BT 400V

IT. No.

Art. n.

9 Ea/No

59 SPD

SPD

IT. No.

Art. n.

10 Ea/No

FOR OFFICIAL USE ONLY 5 of 10

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

60 HV CABLES

Cavi MT

IT. No.

Art. n.

11a Lm/Ml

61 LV CABLES 3x1x240+1x120N+1x120PE FG16M16 Cavi BT 3x1x240+1x120N+1x120PE FG16M16

IT. No.

Art. n.

11b Lm/Ml

62 LV CABLES 3x1x240+1x120N+1x120PE FG16M16 Cavi BT 3x1x240+1x120N+1x120PE FG16M16

IT. No.

Art. n.

11c Lm/Ml

63 LV CABLES 3x1x240+1x120N+1x120PE FG16M16 Cavi BT 3x1x240+1x120N+1x120PE FG16M16

IT. No.

Art. n.

11d Lm/Ml

64 LV CABLES 3x1x120+1x70N+1x70PE FG16M16 Cavi BT 3x1x120+1x70N+1x70PE FG16M16

IT. No.

Art. n.

11e Lm/Ml

65 LV CABLES 3x1x240+1x120N+1x120PE FG16M16 Cavi BT 3x1x240+1x120N+1x120PE FG16M16

IT. No.

Art. n.

11f Lm/Ml

66 LV CABLES 3,5x70+35PE FG16OM16 Cavi BT 3,5x70+35PE FG16OM16

IT. No.

Art. n.

11g Lm/Ml

67 LV CABLES 3,5x70+35PE FG16OM16 Cavi BT 3,5x70+35PE FG16OM16

IT. No.

Art. n.

11h Lm/Ml

68 LV CABLES 3x1x240+120PE FG16OM16 Cavi BT 3x1x240+120PE FG16OM16

IT. No.

Art. n.

11i Lm/Ml

69 50 KVA AUTOTRANSFORMER INCL METAL ENCLOSURE

Autotrasformatore 50kVA incl box metallico

IT. No.

Art. n.

12 Ea/No

70 SUBSTATION SERVICE PANEL

Quadro servizi cabina

IT. No.

Art. n.

13 Ea/No

71 EXHAUST FAN CONTROL PANEL

Quadro Sistema Ventilazione

IT. No.

Art. n.

14 Ea/No

72 DDC PANEL

Quadro Dcc

IT. No.

Art. n.

15 Ea/No

73 AUTOMATIC POWER FACTOR CORRECTION UNIT

Unità di rifasamento automatico

IT. No.

Art. n.

16 Ea/No

74 100x50 METAL CABLE TRAY Canaletta metallica 100x50

IT. No.

Art. n.

17a Lm/Ml

75 300x100 METAL CABLE TRAY Canaletta metallica 300x100

IT. No.

Art. n.

17b Lm/Ml

76 16A INTERLOCKED OUTLET

Presa interbloccata 16 A

IT. No.

Art. n.

18 Ea/No

77 OUTLET POINT

Punto Presa

IT. No.

Art. n.

19 Ea/No

78 WALL BOX

Contenitore a parete

IT. No.

Art. n.

20 Ea/No

FOR OFFICIAL USE ONLY 6 of 10

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

79 NEW TEL/TEL SYSTEM AND WIRING SYSTEM

Nuovo impianto TEL/TEL e Cablaggio

IT. No.

Art. n.

21 Ls/Ac

80 NEW GROUNDING SYSTEM

Nuovo impianto di Terra

IT. No.

Art. n.

22 Ls/Ac

81 NEW GROUNDING TESTS

Nuove Prove Impianto di terra

IT. No.

Art. n.

23 Ls/Ac

Total Power System - Torale Impianto FM

IVb Lighting system - IVb Impianto Illuminazione

82 36 W LED LIGHTING FIXTURE

Lampada a LED 36 W

IT. No.

Art. n.

24 Ea/No

83 8 W LED EMERGENCY LIGHTING FIXTURE

Lampada di emergenza LED 8 W

IT. No.

Art. n.

25 Ea/No

84 53 W LED FLOODLIGHT

Proiettore da 53 W a LED

IT. No.

Art. n.

26 Ea/No

85 LIGHTING POINT

PunLuce

IT. No.

Art. n.

27 Ea/No

Total Lighting system - Totale Impianto Illuminazio ne

IVc Fire Alarm System - IVc Impianto Allarme Incend io

86 OPTICAL SMOKE DETECTORS

Rilavatori di Fumo Ottiici

IT. No.

Art. n.

28 EA/NO

87 RATE OF RISE DETECTORS

Rilavatori di Fumo termovelocimetrici

IT. No.

Art. n.

29 EA/NO

88 MANUAL PULLING STATIONS

Pulsanti Manuali di Allarme

IT. No.

Art. n.

30 EA/NO

89 AUDIO/VISUAL DEVICES

Dispositivi audiovisivi

IT. No.

Art. n.

31 EA/NO

90 FIRE ALARM VISUAL PANEL

Pannelli di allarme incendio

IT. No.

Art. n.

32 EA/NO

91 AM 8200 FIRE ALARM PANEL

Centrale antincendio AM 8200

IT. No.

Art. n.

33 EA/NO

FOR OFFICIAL USE ONLY 7 of 10

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

92 FTG10OM1 2X1,5sq.mm CABLE Cavo FTG10OM1 2x1,5mm2

IT. No.

Art. n.

34 LM/ML

93 TESTING ON F/A SYSTEM

Prove impianto F/A

IT. No.

Art. n.

35 LS/LC

Total Fire Alarm System - Total Impianto Allarme In cendio

Total Substation - Totale Cabina Elettrica

IVd Site Work - Ivd Lavori Esterni

94 TEMPORARY SUBSTATION

Cabina Temporanea

IT. No.

Art. n.

36 Ls/Ac

Total Site Work - Totale Lavori Esterni

PART V - FIRE PREVENTION/ Parte V - Prevenzione Inc endi

95 CPI PROCUREMENTS

Ottenimento Certificato Prevenzioen incendi

IT. No.

Art. n.

1 LS/AC

96 FIRE ESTINGUISHER

Estintore

IT. No.

Art. n.

2 EA/NO

97 FIRE PREVENTION SIGNS

Segnaletica antincendio

IT. No.

Art. n.

3 LS/AC

Total Fire Prevention - Totale Prevenzione Incendi

TOTAL PART IV - Totale Parte IV

FOR OFFICIAL USE ONLY 8 of 10

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 21-1047 AREA F - AVIANO AIR BASE

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOURS

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

-$ -$ -$ -$ OR US DOLLARS (RATE 1$ = 0,9381€)

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART III - MECHANICAL WORK

PART IV - ELECTRICAL WORK

TOTAL PRICE / Costo Totale

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART V - FIRE PREVENTION

FOR OFFICIAL USE ONLY 9 of 10

ASHE 21-1047 RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305

INSTRUCTIONS FOR COMPLETING AF FORM 3052

TOTAL MATERIAL COSTS € $

TOTAL LABOR COSTS € $

TOTAL OTHER DIRECT COSTS € $

TOTAL DIRECT COSTS € $

OVERHEAD % € $

SUBTOTAL € $

PROFIT % € $

TOTAL PRICE € $

DATE FIRM NAME

TITLE BY

INSTRUCTIONS TO OFFERORS

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unitof measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.

Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submita certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representativeupon request.

4. By submission of this proposal the offeror grants to the contracting officer,or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

File details come from the government source that posted it. Updated .