This document is a construction cost estimate breakdown for the renovation of a medium voltage substation facility at Aviano Air Base in Italy. The estimate includes line items for demolition, architectural, civil, mechanical and electrical work. Demolition items include the removal of existing ventilation systems, electrical switchgear and panels, lighting fixtures, and a backup generator. Architectural work comprises painting, waterproofing, plastering and installation of doors, partitions and ventilation grilles. Electrical work includes installation of a 250kVA transformer and generator, switchgear, cables, lighting fixtures and a fire alarm system. The total estimated cost is provided in Euros along with calculations for overhead, profit and total price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE 21-1047_Dwgs_100.pdf | ||
| CCEB 21-1047.xls | XLS spreadsheet | |
| ASHE 21-1047_Dwgs 1_2.pdf | ||
| ASHE 21-1047_PSC.pdf | ||
| ASHE 21-1047_Tech Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared and Submitted by:
Architecture, Engineering and Consulting Services
Via di Sacco Pastore n. 4 - Rome, Italy Tel. +39.06.97848041 fax +39.06.97848175
E-mail: design@soinci.it
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
PROJECT ASHE 21-1047
RENOVATE MEDIUM VOLTAGE SUBSTATION
FAC.1305
AVIANO AIR BASE, ITALY
CONSTRUCTION COST ESTIMATE BREAKDOWN
FINAL SUBMITTAL (100%)
Date: May 2023
A/E CONTRACT No.: FA568220D0006 Task Order FA568222F0081
FOR OFFICIAL USE ONLY
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Pa rte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolitions - Demolizioni Architet toniche
1 ACM/PACM REMOVAL
Rimozione materiali contenente amianto
IT. No.
Art. n.
1 Ls/Ac
2 REMOVAL OF CONCRETE STEPS
Rimozione di gradini in calcestruzzo
IT. No.
Art. n.
2 Ls/Ac
3 REMOVAL OF CNC PAD AND METAL RAILS
Rimozione di basamento in calcestruzzo e guide metalliche
IT. No.
Art. n.
3 Ls/Ac
4 REMOVAL OF PLASTER FROM CEILINGS
Rimozione di intonaco dai soffitti
IT. No.
Art. n.
4 Sq.m/Mq
5 SLOTS OPENING ON ROOF SLAB FOR NEW FAN
Apertura di asole su solaio copertura per nuovi ventilatori
IT. No.
Art. n.
5 Ea/No
6 SURVEYED DEMOLITION OF BEARING WALLS
demolizione controllata di murature portanti
IT. No.
Art. n.
6 Cu.m/Mc
7 DOORS PASSAGEWAY OPENINGS
Apertura vani porta
IT. No.
Art. n.
7 Sq.m/Mq
8 STEEL DOOR AND GRATES REMOVAL
Rimozione porta e grata in acciaio
IT. No.
Art. n.
8 Ea/No
9 REMOVAL OF 4+4mm WATERPROOFING MEMBRANE Rimozione di doppia guaina impermeabile, 4+4mmi
IT. No.
Art. n.
9 Sq.m/Mq
Total Architectural - Totale Architettonico
Ib Civil Demolitions - Demolizioni Civili
10 REMOVAL OF METAL FENCES, H=250cm Rimozione di recinzione metallica, H=250cm
IT. No.
Art. n.
10 Sq.m/Mq
11 EXCAVATION IN ANY KIND OF SOIL AND COMPACTNESS
Scavo in terreno di qualsiasi natura e compattezza
IT. No.
Art. n.
11 Cu.m/Mc
Total Civil - Totale Civile
FOR OFFICIAL USE ONLY 1 of 10
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Ic Mechanical Demolitions - Demolizioni Meccaniche
12 REMOVAL OF EXISTING VENTILATION SYSTEM
Rimozione di impianto di ventilazione esistente
IT. No.
Art. n.
12 Ls/Ac
Total Mechanical - Totale Meccanico
Id Electrical Demolitions - Demolizioni Elettriche
REMOVAL OF CAST RESIN TRANSFORMER, INCL METAL
ENCLOSURE
Rimozione di Trasformatore in resina, incl box metallico
IT. No.
Art. n.
13 Ls/Ac
REMOVAL OF ELECTRICAL LV SWITCHGEARS AND PANELS
INCLUDING CABLES AND CONDUITS
Rimozione di quadri elettrici e pannelli compresi cavi e tubazioni
IT. No.
Art. n.
14 Ls/Ac
REMOVAL OF ELECTRICAL HV AND LV CABLES AND
CONDUITS
Rimozione di cavi e tubazioni di MT e BT
IT. No.
Art. n.
15 Ls/Ac
16 REMOVAL OF TELEMETERING/TELEMONITORING PANEL
Rimozione di Quadro Telemisura/Telemonitoraggio
IT. No.
Art. n.
16 Ls/Ac
REMOVAL OF LIGHTING FIXTURES AND OUTLETS, INCL
WIRINGS
Rimozione elementi illuminanti, incluso pese e cablaggi
IT. No.
Art. n.
17 Ls/Ac
18 REMOVAL OF BACK_UP GENERATOR
Rimozione Generatore di riserva
IT. No.
Art. n.
18 Ls/Ac
19 REMOVE FIRE ALARM SYSTEM
Rimozione Impianto Allarme Incendi
IT. No.
Art. n.
19 Ls/Ac
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
FOR OFFICIAL USE ONLY 2 of 10
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART II - ARCHITECTURAL AND CIVIL WORK / Parte II - Lavori Architettonici e Civili
IIa Architectural and Structural Work - IIa Lavori Architettonici e Strutturali
20 PAINTING OF INTERIOR SURFACES. CEILINGS
Pitturazione delle superfici interne. Soffitti
IT. No.
Art. n.
1a Sq.m/Mq
21 PAINTING OF INTERIOR SURFACES. WALLS
Pitturazione delle superfici interne, Pareti
IT. No.
Art. n.
1b Sq.m/Mq
22 PAINTING OF EXTERIOR SURFACES, INCL PREPARATION
Pitturazione delle superfici esterne, incl preparazione
IT. No.
Art. n.
2 Sq.m/Mq
23 PAINTING OF METAL SURFACES
Tinteggiatura delle superfici metalliche
IT. No.
Art. n.
3 Sq.m/Mq
24 NEW 4+4mm WATERPROOFING MEMBRANE Nuova doppia guaina impermeabile, 4+4mm
IT. No.
Art. n.
4 Sq.m/Mq
25 NEW VERMICULITE BASED PLASTER ON CEILINGS
Nuovo intonaco a base di vermiculite sui soffitti
IT. No.
Art. n.
5 Sq.m/Mq
26 EXISTING INDUSTRIAL CNC FLOOR RENOVATION
Ripristino pavimentazione industriale in calcestruzzo
IT. No.
Art. n.
6 Sq.m/Mq
27 NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaio
IT. No.
Art. n.
7 Ea/No
28 EXISTING DOOR RENOVATION
Manutenzione porte esistenti
IT. No.
Art. n.
8 Ls/Ac
29 PANIC BAR INSTALLATION
Installazione barra antipanico
IT. No.
Art. n.
9 EA/NO
30 NEW GENSET CNC PAD
Nuovo basamento generatore
IT. No.
Art. n.
10 Sq.m/Mq
31 EXISTING LOUVER BLOCK-UP
Chiusura vani griglia
IT. No.
Art. n.
11 Cu.m/Mc
32 NEW PARTITION WALL, W1 TYPE
Nuovo tramezzo, tipo W1
IT. No.
Art. n.
12 Sq.m/Mq
33 NEW STEEL DOOR, Di1 TYPE - 140*220 Nuova porta in acciaio, tipo Di1
IT. No.
Art. n.
13a Ea/No
34 NEW STEEL DOOR, Di2 TYPE - 90*210 Nuova porta in acciaio, tipo Di2
IT. No.
Art. n.
13b Ea/No
35 NEW VENTILATION GRILLE
Nuova griglia di ventilazione
IT. No.
Art. n.
14 Ea/No
36 CLEANING AND SEALING OF CABLE CROSSINGS
Pulizia trincee e sigillatura attraversamenti cavi
IT. No.
Art. n.
15 Ls/Ac
FOR OFFICIAL USE ONLY 3 of 10
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
37 EXISTING CABLE TRENCH CLOSURE
Chiusura trincee esistenti
IT. No.
Art. n.
16 Sq.m/Mq
38 NEW FLOOR CABLE TRENCH
Nuova trincea cavi a pavimento
IT. No.
Art. n.
17 Lm/Ml
39 SAFETY GALVANIZED STEEL RAIL
Parapetto di sicurezza in acciaio zincato
IT. No.
Art. n.
18 Kg
40 NEW STEEL SHEET FLASHING
Nuove scosaline in lamiere di acciaio
IT. No.
Art. n.
19 Sq.m/Mq
41 CALCIUM SILICATE LINING
Rivestimento in silicato di calcio
IT. No.
Art. n.
20 Sq.m/Mq
42 S275JR STEEL FRAME
Telaio in acciaio S275JR
IT. No.
Art. n.
21 Kg
Total Architectural and Structural Work - Totale La vori Architettonici e Strutturali
IIb Civil Work - IIb Lavori Civili
43 EXISTING EXT CNC SIDEWALK REPAIR
Ripristino marciapiede esistente in cls
IT. No.
Art. n.
1 Sq.m/Mq
44 NEW BITUMINOUS CONCRETE PAVEMENT
Nuova pavimentazione in conglomerato bituminoso
IT. No.
Art. n.
2 Sq.m/Mq
45 NEW CHAIN LINK FENCE AND GATES, H=250cm Nuova recinzione a maglie metalliche e cancelli, H=250cm
IT. No.
Art. n.
3 Lm/Ml
46 RENOVATION OF EXISTING MANHOLES
Ripristino pozzetti esistenti
IT. No.
Art. n.
4 Ls/Ac
47 INFILTRATION SWALE
Cunetta drenante
IT. No.
Art. n.
5 Ls/Ac
Total Civil Work - Totale Lavori Civili
TOTAL PART II / Totale Parte II
FOR OFFICIAL USE ONLY 4 of 10
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PART III - MECHANICAL WORK / Parte III - Lavori Mec canici
48 DUCTED AXIAL EXHAUST FAN
Estrattori assiali
IT. No.
Art. n.
1 Ea/No
49 FUEL FEEDING SYSTEM FOR GENSET
Sistema di alimentazione del gasolio
IT. No.
Art. n.
2 LS/AC
Total Mechanical Work - Totale Lavori Meccanici
TOTAL PART III / Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettr ici
IVa Power System - IVa Impianto FM
50 INSTALLATION OF EQUIPMENT PREVIOUSLY REMOVED
Installazione di apparecchiature precedentemente rimosse
IT. No.
Art. n.
1 Ls/Ac
51 HV TRANSFORMER PROTECTION UIT
Unità di MT Protezione trasformatore
IT. No.
Art. n.
2 Ea/No
52 HV SWITCHGEAR UPGRADING
Adeguamento Unità di MT
IT. No.
Art. n.
3 Ls/Ac
53 TRANSFORMER 250 kVA Trasformatore 250 kVA
IT. No.
Art. n.
4 Ea/No
54 TRANSFORMER 250 kVA BOX Contenitore Trasformatore 250 kVA
IT. No.
Art. n.
5 Ea/No
55 BACK-UP GENERATOR 250 kVA Generatore di riserva 250 KVA
IT. No.
Art. n.
6 Ea/No
56 MANUAL TRANSFER SWITCH SYSTEM
Sistema commutazione manuale
IT. No.
Art. n.
7 Ls/Ac
57 LOAD BENCH SYSTEM
Impianto carico in prova
IT. No.
Art. n.
8 Ls/Ac
58 400V LOW VOLTAGE SWITCHGEAR
Quadro BT 400V
IT. No.
Art. n.
9 Ea/No
59 SPD
SPD
IT. No.
Art. n.
10 Ea/No
FOR OFFICIAL USE ONLY 5 of 10
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
60 HV CABLES
Cavi MT
IT. No.
Art. n.
11a Lm/Ml
61 LV CABLES 3x1x240+1x120N+1x120PE FG16M16 Cavi BT 3x1x240+1x120N+1x120PE FG16M16
IT. No.
Art. n.
11b Lm/Ml
62 LV CABLES 3x1x240+1x120N+1x120PE FG16M16 Cavi BT 3x1x240+1x120N+1x120PE FG16M16
IT. No.
Art. n.
11c Lm/Ml
63 LV CABLES 3x1x240+1x120N+1x120PE FG16M16 Cavi BT 3x1x240+1x120N+1x120PE FG16M16
IT. No.
Art. n.
11d Lm/Ml
64 LV CABLES 3x1x120+1x70N+1x70PE FG16M16 Cavi BT 3x1x120+1x70N+1x70PE FG16M16
IT. No.
Art. n.
11e Lm/Ml
65 LV CABLES 3x1x240+1x120N+1x120PE FG16M16 Cavi BT 3x1x240+1x120N+1x120PE FG16M16
IT. No.
Art. n.
11f Lm/Ml
66 LV CABLES 3,5x70+35PE FG16OM16 Cavi BT 3,5x70+35PE FG16OM16
IT. No.
Art. n.
11g Lm/Ml
67 LV CABLES 3,5x70+35PE FG16OM16 Cavi BT 3,5x70+35PE FG16OM16
IT. No.
Art. n.
11h Lm/Ml
68 LV CABLES 3x1x240+120PE FG16OM16 Cavi BT 3x1x240+120PE FG16OM16
IT. No.
Art. n.
11i Lm/Ml
69 50 KVA AUTOTRANSFORMER INCL METAL ENCLOSURE
Autotrasformatore 50kVA incl box metallico
IT. No.
Art. n.
12 Ea/No
70 SUBSTATION SERVICE PANEL
Quadro servizi cabina
IT. No.
Art. n.
13 Ea/No
71 EXHAUST FAN CONTROL PANEL
Quadro Sistema Ventilazione
IT. No.
Art. n.
14 Ea/No
72 DDC PANEL
Quadro Dcc
IT. No.
Art. n.
15 Ea/No
73 AUTOMATIC POWER FACTOR CORRECTION UNIT
Unità di rifasamento automatico
IT. No.
Art. n.
16 Ea/No
74 100x50 METAL CABLE TRAY Canaletta metallica 100x50
IT. No.
Art. n.
17a Lm/Ml
75 300x100 METAL CABLE TRAY Canaletta metallica 300x100
IT. No.
Art. n.
17b Lm/Ml
76 16A INTERLOCKED OUTLET
Presa interbloccata 16 A
IT. No.
Art. n.
18 Ea/No
77 OUTLET POINT
Punto Presa
IT. No.
Art. n.
19 Ea/No
78 WALL BOX
Contenitore a parete
IT. No.
Art. n.
20 Ea/No
FOR OFFICIAL USE ONLY 6 of 10
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
79 NEW TEL/TEL SYSTEM AND WIRING SYSTEM
Nuovo impianto TEL/TEL e Cablaggio
IT. No.
Art. n.
21 Ls/Ac
80 NEW GROUNDING SYSTEM
Nuovo impianto di Terra
IT. No.
Art. n.
22 Ls/Ac
81 NEW GROUNDING TESTS
Nuove Prove Impianto di terra
IT. No.
Art. n.
23 Ls/Ac
Total Power System - Torale Impianto FM
IVb Lighting system - IVb Impianto Illuminazione
82 36 W LED LIGHTING FIXTURE
Lampada a LED 36 W
IT. No.
Art. n.
24 Ea/No
83 8 W LED EMERGENCY LIGHTING FIXTURE
Lampada di emergenza LED 8 W
IT. No.
Art. n.
25 Ea/No
84 53 W LED FLOODLIGHT
Proiettore da 53 W a LED
IT. No.
Art. n.
26 Ea/No
85 LIGHTING POINT
PunLuce
IT. No.
Art. n.
27 Ea/No
Total Lighting system - Totale Impianto Illuminazio ne
IVc Fire Alarm System - IVc Impianto Allarme Incend io
86 OPTICAL SMOKE DETECTORS
Rilavatori di Fumo Ottiici
IT. No.
Art. n.
28 EA/NO
87 RATE OF RISE DETECTORS
Rilavatori di Fumo termovelocimetrici
IT. No.
Art. n.
29 EA/NO
88 MANUAL PULLING STATIONS
Pulsanti Manuali di Allarme
IT. No.
Art. n.
30 EA/NO
89 AUDIO/VISUAL DEVICES
Dispositivi audiovisivi
IT. No.
Art. n.
31 EA/NO
90 FIRE ALARM VISUAL PANEL
Pannelli di allarme incendio
IT. No.
Art. n.
32 EA/NO
91 AM 8200 FIRE ALARM PANEL
Centrale antincendio AM 8200
IT. No.
Art. n.
33 EA/NO
FOR OFFICIAL USE ONLY 7 of 10
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
92 FTG10OM1 2X1,5sq.mm CABLE Cavo FTG10OM1 2x1,5mm2
IT. No.
Art. n.
34 LM/ML
93 TESTING ON F/A SYSTEM
Prove impianto F/A
IT. No.
Art. n.
35 LS/LC
Total Fire Alarm System - Total Impianto Allarme In cendio
Total Substation - Totale Cabina Elettrica
IVd Site Work - Ivd Lavori Esterni
94 TEMPORARY SUBSTATION
Cabina Temporanea
IT. No.
Art. n.
36 Ls/Ac
Total Site Work - Totale Lavori Esterni
PART V - FIRE PREVENTION/ Parte V - Prevenzione Inc endi
95 CPI PROCUREMENTS
Ottenimento Certificato Prevenzioen incendi
IT. No.
Art. n.
1 LS/AC
96 FIRE ESTINGUISHER
Estintore
IT. No.
Art. n.
2 EA/NO
97 FIRE PREVENTION SIGNS
Segnaletica antincendio
IT. No.
Art. n.
3 LS/AC
Total Fire Prevention - Totale Prevenzione Incendi
TOTAL PART IV - Totale Parte IV
FOR OFFICIAL USE ONLY 8 of 10
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 21-1047 AREA F - AVIANO AIR BASE
MATERIAL COSTS LABOR COSTS
LINE
NO.
ITEM
UNIT OF
MEASURE
QUANTITY UNIT TOTAL
MANHOURS
MANDAYS
AVERAGE
RATE
TOTAL
OTHER DIRECT
COSTS
LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
-$ -$ -$ -$ OR US DOLLARS (RATE 1$ = 0,9381€)
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART V - FIRE PREVENTION
FOR OFFICIAL USE ONLY 9 of 10
ASHE 21-1047 RENOVATE MEDIUM VOLTAGE SUBSTATION FACILITY 1305
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS € $
TOTAL LABOR COSTS € $
TOTAL OTHER DIRECT COSTS € $
TOTAL DIRECT COSTS € $
OVERHEAD % € $
SUBTOTAL € $
PROFIT % € $
TOTAL PRICE € $
DATE FIRM NAME
TITLE BY
INSTRUCTIONS TO OFFERORS
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unitof measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.
Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submita certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representativeupon request.
4. By submission of this proposal the offeror grants to the contracting officer,or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.