ASHE 20-1046 Addedum 2.doc

DOC document 39 KB Posted

Attached to
ASHE 20-1046 REPAIR PAS Z-15 FAC. 7850, AREA F, AVIANO AB, ITALY
Solicitation number
FA568220R0017
Issued by

About this file

This document contains a solicitation notice and related federal contract opportunity for repair work at Aviano Air Base in Italy. The solicitation seeks proposals for Project ASHE 20-1046 to repair PAS Z-15 Facility 7850 at Aviano Air Force Base in Italy. Work includes asbestos removal from metal doors and gates in accordance with Italian regulations. The estimated value of the construction is between $250,000 and $500,000. Interested vendors must hold a current Statement of Qualification certification for construction category OG11. The solicitation response deadline is not provided. The work will be awarded as a firm fixed price contract performed in accordance with Defense Federal Acquisition Regulation Supplement clauses for contracts performed overseas. The soliciting agency is the United States Air Forces in Europe - Air Forces Africa.

View the file

Other files

File Type Posted
Amendment FA568220R00170002.pdf PDF
ASHE 20-1046 Addedum 1 REV.1.doc DOC document
ASHE 20-1046 CCEB Rev.2 MDT.xlsx XLSX spreadsheet
Amendment FA568220R00170001.pdf PDF
AVIANO MASTERSPECS 2020.pdf PDF
ASHE 20-1046 DWGs.pdf PDF
ASHE 20-1046 CCEB MDT.xlsx XLSX spreadsheet
PSC - ALLEGATO E - COVID-19.pdf PDF
PSC_Rev02.pdf PDF
Solicitation - FA568220R0017.pdf PDF
ASHE 20-1046 Technical Specifications.pdf PDF
ASHE 20-1046 Addedum 1.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASHE 20-1046 REPAIR PAS Z-15, FAC 7850

AVIANO AB, AVIANO, ITALY

ADDENDUM #2

Work items Description

1. Asbestos Containing Material (ACM) gasket removal from existing metal door located within metal gates (note 5, drawing AD101), in accordance with DM.81/08 and other applicable norms. Item includes:

· Presentation and approval of abetment plan to ASS6;

· Sampling;

· Asbestos removal;

· Final certification;

· Every other activity required by applicable norms.

Lump Sum Project # ASHE 15-1035 Addendum#2

Statement of Work

DATE: JUL 2020

31CES/CENM

File details come from the government source that posted it. Updated .