This document is an amendment to a federal contract solicitation for construction services. The key details are as follows:
The solicitation is for a construction project at Aviano Air Base in Italy to expand an MDG warehouse facility. The project scope involves furnishing all labor, equipment, materials, transportation, and supervision to complete the work according to the technical specifications and drawings attached to the solicitation. The specifications and drawings are dated November 6, 2019 and include Addendum #1. The work is subject to the statutory cost limitation of $2 million for unspecified minor military construction. The closing date for proposal submissions is extended to February 25, 2020 at 4:00 PM local time. Interested vendors must possess a current Statement of Adeabilities certification in Category OG01 and have adequate classification to cover their proposed amount for project performance. The magnitude of construction is between $1 million to $5 million.
The amendment incorporates Addendum #1 to the technical specifications and extends the closing date for proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question and answers revision #1.pdf | ||
| Addendum #1.pdf | ||
| Question and answers.pdf | ||
| Master Technical Specifications Nov 2005.pdf | ||
| Solicitation - FA568220R0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
1 3
0001 2/14/2020 F1F4A49340AW01 ASHE 20-8000
FA5682
FA5682 31 CONS DA LGC
APO AE 09604-6102
UNIT 6102 BOX 140
APO, AE 09604-6102
United States Jessica Cuccagna, Email: jessica.cuccagna.it@us.af.mil Telephone: 632-7138
FA568220R0004
1/17/2020
See Section G
The purpose of the amendment is to incorporate Addendum #1 to project Technical Specifications and extend the closing date for receipt of proposals to 25 February 2020 at 4:00 PM local time.
Severino Mion Email: severino_francesco.mion.it@us.af.mil Telephone: 632-8553
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Accept Within Days 226 218
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) were modified:
0001 - THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS,
TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH
THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW AND STRICTLY IN
ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE
FOLLOWING ATTACHED DOCUMENTS LISTED IN SECTION J HEREIN: PROJECT ASHE
20-8000 EXPAND MDG WAREHOUSE FOR WRM FAC. 1412 AREA F - AVIANO AB, ITALY,
TECHNICAL SPECIFICATIONS DATED NOVEMBER THE 6TH 2019 AND MARKED SUBMITTAL:
FINAL (100% DESIGN) AND ADDENDUM #1.
FOR THE PURPOSES OF PROVISION 252.236-7006 OF SECTION L, THE CONSTRUCTION
WORK UNDER THIS ITEM IS SUBJECT TO THE STATUTORY COST LIMITATION OF $2,000,000
FOR UNSPECIFIED MINOR MILITARY CONSTRUCTION (10 USC 2805)
INFORMATION FROM TO
Description THE CONTRACTOR SHALL
FURNISH ALL LABOR,
EQUIPMENT, MATERIALS,
TRANSPORTATION,
SUPERVISION AND ANY
OTHER NECESSARY WORK
TO ACCOMPLISH THE
PROJECT HEREIN LISTED
AT THE PRICE STATED
BELOW AND STRICTLY IN
ACCORDANCE WITH THE
TERMS AND CONDITIONS OF
THIS CONTRACT INCLUDING
THE FOLLOWING ATTACHED
DOCUMENTS LISTED IN
SECTION J HEREIN: PROJECT
ASHE 20-8000 EXPAND MDG
WAREHOUSE FOR WRM
FAC. 1412 AREA F - AVIANO
AB, ITALY, TECHNICAL
SPECIFICATIONS DATED
NOVEMBER THE 6TH 2019
THE CONTRACTOR SHALL
FURNISH ALL LABOR,
EQUIPMENT, MATERIALS,
TRANSPORTATION,
SUPERVISION AND ANY
OTHER NECESSARY WORK
TO ACCOMPLISH THE
PROJECT HEREIN LISTED
AT THE PRICE STATED
BELOW AND STRICTLY IN
ACCORDANCE WITH THE
TERMS AND CONDITIONS OF
THIS CONTRACT INCLUDING
THE FOLLOWING ATTACHED
DOCUMENTS LISTED IN
SECTION J HEREIN: PROJECT
ASHE 20-8000 EXPAND MDG
WAREHOUSE FOR WRM
FAC. 1412 AREA F - AVIANO
AB, ITALY, TECHNICAL
SPECIFICATIONS DATED
NOVEMBER THE 6TH 2019
FA568220R00040001
AND MARKED SUBMITTAL:
FINAL (100% DESIGN).
FOR THE PURPOSES OF
PROVISION 252.236-7006
OF SECTION L, THE
CONSTRUCTION WORK
UNDER THIS ITEM
IS SUBJECT TO THE
STATUTORY COST
LIMITATION OF $2,000,000
FOR UNSPECIFIED MINOR
MILITARY CONSTRUCTION (10
USC 2805)
AND MARKED SUBMITTAL:
FINAL (100% DESIGN) AND
ADDENDUM #1.
FOR THE PURPOSES OF
PROVISION 252.236-7006
OF SECTION L, THE
CONSTRUCTION WORK
UNDER THIS ITEM
IS SUBJECT TO THE
STATUTORY COST
LIMITATION OF $2,000,000
FOR UNSPECIFIED MINOR
MILITARY CONSTRUCTION (10
USC 2805)
Section J - List of Attachments
Miscellaneous text in this section has been modified to:
LIST OF ATTACHMENTS - CONSTRUCTION CONTRACTS
The following documents are an integral part of this contract:
a. Attachment 1:
Technical Specifications for Project ASHE 20-8000 EXPAND MDG WAREHOUSE FOR WRM FAC.
1415, Area F - Aviano AB, Italy dated November the 6th, 2019 and marked Submittal: Final (100% design) and Addendum #1.
- 605 pages including cover page and Addendum #1.
b. Attachment 2:
Drawings
- 87 sheets
c. Attachment 3:
Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November 2005
FA568220R00040001