Solicitation_Amendment_FA568219RA0110002_SF_30.pdf
PDF 548 KB Posted
- Solicitation number
- FA568219RA011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE_18-1101_JUNE_2019_-_DWGS_-_Rev.01_2.zip | ZIP file | |
| ASHE_18-1101_JUNE_2019_-_DWGS_-_Rev.01_1.zip | ZIP file | |
| ASHE_18-1101_JUNE_2019_-_Tech_Specs_03.pdf | ||
| PAVIFIX_17_IT_01.pdf | ||
| ASHE_18-1101_JUNE_2019_-_DWGS_-_Rev.01_4.zip | ZIP file | |
| 2_1817_CCEB_Rev.01.xls | XLS spreadsheet | |
| ASHE_18-1101_JUNE_2019_-_DWGS_-_Rev.01_3.zip | ZIP file | |
| Solicitation_Amendment_FA568219RA0110001_SF_30.pdf | ||
| ASHE_18-1101_Drawings_new.pdf | ||
| ASHE_18-1101__Safety_Plan.pdf | ||
| ADDITIONAL_REQUIREMENTS_March_2019.pdf | ||
| PHYSICAL_DATA__March_2019.pdf | ||
| Solicitation_-_FA568219RA011.pdf | ||
| ASHE_18-1101_Tech_Specs_100__rev_E.pdf | ||
| ASHE_18-1101_CCEB.xls | XLS spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) were modified:
0001 - PROJECT ASHE 18-1101 SUSTAIN ELECTRICAL SUBSTATION, MULTI, AVIANO AIR
BASE, ITALY.
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT,
MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER
NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT
THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH
THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE
FOLLOWING ATTACHED DOCUMENTS LISTED IN SECTION J HEREIN:
TECHNICAL SPECIFICATIONS FOR ASHE 18-1101 SUSTAIN ELECTRICAL SUBSTATION,
MULTI, AVIANO AIR BASE, ITALY, REV. 3 DATED
JANUARY 2019 AND MARKED TECHNICAL SPECIFICATIONS Revision JUNE 2019 - 71 PAGES
INCLUDING COVER PAGE
INFORMATION FROM TO
Description PROJECT ASHE 18-1101
SUSTAIN ELECTRICAL
SUBSTATION, MULTI, AVIANO
AIR BASE, ITALY.
THE CONTRACTOR SHALL
FURNISH ALL LABOR,
EQUIPMENT,
MATERIALS,
TRANSPORTATION,
SUPERVISION AND ANY
OTHER
NECESSARY WORK TO
ACCOMPLISH THE PROJECT
HEREIN LISTED AT
THE PRICE STATED
BELOW AND STRICTLY IN
ACCORDANCE WITH
THE TERMS AND CONDITIONS
OF THIS CONTRACT
INCLUDING THE
FOLLOWING ATTACHED
DOCUMENTS LISTED IN
SECTION J HEREIN:
TECHNICAL SPECIFICATIONS
FOR ASHE 18-1101 SUSTAIN
ELECTRICAL SUBSTATION,
MULTI, AVIANO AIR BASE,
ITALY, DATED
JANUARY 2018 AND MARKED
TECHNICAL SPECIFICATIONS
PROJECT ASHE 18-1101
SUSTAIN ELECTRICAL
SUBSTATION, MULTI, AVIANO
AIR BASE, ITALY.
THE CONTRACTOR SHALL
FURNISH ALL LABOR,
EQUIPMENT,
MATERIALS,
TRANSPORTATION,
SUPERVISION AND ANY
OTHER
NECESSARY WORK TO
ACCOMPLISH THE PROJECT
HEREIN LISTED AT
THE PRICE STATED
BELOW AND STRICTLY IN
ACCORDANCE WITH
THE TERMS AND CONDITIONS
OF THIS CONTRACT
INCLUDING THE
FOLLOWING ATTACHED
DOCUMENTS LISTED IN
SECTION J HEREIN:
TECHNICAL SPECIFICATIONS
FOR ASHE 18-1101 SUSTAIN
ELECTRICAL SUBSTATION,
MULTI, AVIANO AIR BASE,
ITALY, REV. 3 DATED
JANUARY 2019 AND MARKED
TECHNICAL SPECIFICATIONS
FA568219RA0110002
Revision March 2018- 73
PAGES INCLUDING COVER
PAGE
Revision JUNE 2019 - 71
PAGES INCLUDING COVER
PAGE
Section J - List of Attachments
Miscellaneous text in this section has been modified to:
LIST OF ATTACHMENTS - CONSTRUCTION CONTRACTS
The following documents are attachments to this document and are an integral part hereof:
a. Attachment 1:
Technical Specifications revised: ASHE 18-1101 SUSTAIN ELECT SUBSTATION, MULTI
AREA F, AVIANO AIR BASE -REV 3- 71 pages including cover page
b. Attachments 2:
Drawings REV 1 - 25 sheets
c. Attachment 3:
Additional Requirements, dated March 2019
- 3 pages
d. Attachment 4:
Physical data
1 page
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
L-01. OFFER PREPARATION INSTRUCTIONS
To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.
The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:
1. PRICE OFFER
(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through
K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown form REV 1. The extended amount must equal the whole Euro unit price multiplied by the number of units.
(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 2, "Additional Requirements".
(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown REV 1 shall be returned in their entirety.
2. QUALIFICATION CERTIFICATION
Submit current SOA certification for category OG01 and classification adequate to cover offeror's amount for projects performance.
3. EXPERIENCE
Submit offeror's experience with the same work/trades and complexity as the instant requirements.
The offeror must submit evidence of at least two (2) similar projects performed within the last five (5) years from the date of offer where the offeror was solely responsible for the entire project performance that involved substantially the same work and principal trades, magnitude and complexity as the instant requirement.
L-02. CURRENCY
All prices in response to this solicitation will be in Euro currency.
L-03. OFFER DOCUMENTATION
All offer documentation in response to this solicitation shall be submitted in the English language or a summary translation shall be provided (to include SOA).
L-04. OFFER SUBMISSION INSTRUCTIONS
Offers in response to this solicitation shall be submitted to reach the issuing office indicated at page 1 of the solicitation, Standard Form 1442 block 7, by date and time specified in block 13A of the Standard Form 1442.
Submissions of offers must follow the guidance in the table below:
SUBMISSION METHOD
Paper copy
INSTRUCTIONS
Sealed envelope used to submit your offer must show the time and date specified for receipt, solicitation number, and the name and address of the offeror.
Paper Copies:
- One (1) original paper copy; and
- One (1) redacted paper copy of the Experience indicated in Section L, provision L-01, paragraph 3.
*** A redacted copy removes all direct references that can identify an offeror by name or other easily recognizable characteristic. The redacted copy will be used during evaluation procedures as detailed in Section M of the solicitation.
SUBMISSION METHOD
CD (or DVD)
INSTRUCTIONS
Electronic copies:
- One (1) original copy; and
- One (1) redacted copy of the Experience indicated in Section L, provision L-01, paragraph 3
Electronic copies must be submitted on CD or DVD. Electronic copies may be submitted on the same disk if sufficient capacity is available.
Flash drives will not be accepted.
Note: Offerors are cautioned that Aviano AB has visitor control procedures. SOME DELAY SHOULD
BE ANTICIPATED IF
HAND CARRYING OFFERS. Offerors should allow sufficient time PRIOR to the time specified for receipt of offers.
Section M - Evaluation Factors for Award
Miscellaneous text in this section has been modified to:
M-01 SELECTION
a. Basis for Contract Award
This solicitation is subject to the Simplified Acquisition Procedures (SAP) of the Federal Acquisition Regulation (FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FAR Site, http://farsite.hill.af.mil.
The Government will select the offer of the responsible vendor whose offer represents the best value after evaluation in accordance with the factors indicated in paragraph M-02 below.
b. Number of Contracts to be Awarded
The Government intends to award one contract for the performance of project ASHE 18-1101
SUSTAIN ELECT SUBSTATION, MULTI AREA F, AVIANO AIR BASE - REV 3
c. Solicitation Requirements, Terms and Conditions
Offerors are required to meet all solicitation requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.
M-02 EVALUATION FACTORS
The following evaluation factors will be used to evaluate each offer.
Factor 1: Price
Price determined to be reasonable and balanced. The offeror's price will be evaluated for award purposes based upon the total price offered. Offerors whose price cannot be determined to be reasonable and balanced may not be considered for award.
Factor 2: Qualification Certification
This factor evaluates offeror's current SOA certification for category OG01 and classification adequate to cover offeror's amount for project performance. This requirement is met when the offeror includes a copy of the current SOA certification for category OG01 and classification adequate to cover offeror's amount for projects performance.
Factor 3: Experience
This factor evaluates offeror's experience with the same work/trade and complexity as the instant requirement. This requirement is met when the offeror includes evidence of at least two (2) similar projects performed within the last five
(5) years from the date of offer where the offeror was solely responsible for the entire project performance that involved substantially the same work and principal trades, magnitude and complexity as the instant requirement
| IDCode: |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0002 |
| EffDate: 6/28/2019 |
| ReqNo: F1F3A29077AW01 |
| ProjNo: ASHE 18-1101 |
| IssCode: FA5682 |
| AdmCode: |
| IssuedBy: FA5682 31 CONS DA LGC |
UNIT 6102 BOX 140
APO AE 09604-6102
APO, AE 09604-6102
United States Andrea Caleca, Email: andrea.caleca.it@us.af.mil Telephone: 0434-308551
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA568219RA011 |
| SolDate: 6/11/2019 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: 1 |
| Require: |
| Copies: |
| Descript: |
Section B/extended description of items: replace the technical specifications with Rev. 3, Section J: Replace the technical specifications with Rev. 3; replace drawings with Drawings Rev. 1.
Section L: Change the Government fill-ins and make miscellaneous changes to provision L-01 Offer Preparation Instructions Section M, provisions M-01 and M-02: make miscellaneous changes
| ContNameTitle: |
| CoNameTitle: Severino Mion |
Email: severino_francesco.mion.it@us.af.mil Telephone: 632-8553
| ContDate: |
| CODate: |
File details come from the government source that posted it.