UUUY_18_1073_CCEB_Rev_1.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
UUUY 18-1073 SUSTAIN CHILLER AND WATER SOFTENER SAN VITO DEI NORMANNI, BRINDISI
Solicitation number
FA568218R0040
Issued by

About this file

CONSTRUCTION COST ESTIMATE BREAKDOWN REV 1

View the file

Other files

File Type Posted
FA568218R0040_0002.pdf PDF
FA568218R0040_0003.pdf PDF
FA568218R0040_00001.pdf PDF
UUUY181073_Design_REV1.pdf PDF
UUUY_18_1073_REV1_Submittals_Form_.pdf PDF
UUUY_18-1073_SOW_REV1.pdf PDF
UUUY_18_1073_CCEB.XLSX XLSX spreadsheet
SanVito_HVAC_design.pdf PDF
Technical_Specifications_UUUY_18-1073.pdf PDF
ADDITIONAL_REQUIREMENTS.pdf PDF
FA568218R0040.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASHE 18-1058 REV.1 CCEB

CONSTRUCTION COST ESTIMATE BREAKDOWN REV#1
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
SUSTAIN CENTRAL CHILLER, SAN VITO
PURCHASE REQUEST NUMBERPROJECT NUMBER UUUY 18-1073 REV#1WORK LOCATION: San Vito dei Normanni (Brindisi) Italy
MATERIAL PLUS LABOR COST
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
3. REMOVALS
1REMOVALSIT. No. Art. n.3.1LS10.00- 0 €
4. NEW HVAC SYSTEM
2CHILLER UNITSIT. No. Art. n.4.1EA20.00- 0 €
3AIR TREATMENT UNITSIT. No. Art. n.4.2EA40.00- 0 €
4CHILLED WATER STORAGE TANK STAINLESS STEELIT. No. Art. n.4.3L.S.10.00- 0 €
5CIRCULATING PUMPSIT. No. Art. n.4.4EA20.00- 0 €
6STAINLESS STEEL PIPELINEIT. No. Art. n.4.5LS10.00- 0 €
7VALVES, FILTERS, GAUGES AND ASSOCIATED PARTIT. No. Art. n.4.6LS10.00- 0 €
8THERMAL INSULATION STAINLESS STEEL PIPELINEIT. No. Art. n.4.7LS10.00- 0 €
9UNDERGROUND PLASTIC PIPELINEIT. No. Art. n.4.8LS10.00- 0 €
TOTAL MECHANICAL WORKS- 0 €
5. ELECTRICAL WORKS
10OUTDOOR CONDUITS, BOXES, STAINLESS STEEL CHANNELSIT. No. Art. n.5.1LS10.00- 0 €
11ELECTRICAL FEEDING LINE CHILLERSIT. No. Art. n.5.2LS10.00- 0 €
12SECONDARY PANEL FOR PUMPSIT. No. Art. n.5.3LS10.00- 0 €
13FEEDING LINE FOR SECONDARY PANELIT. No. Art. n.5.4L.S.10.00- 0 €
14BLDG 308 FEEDING LINEIT. No. Art. n.5.5LS10.00- 0 €
15BLDG 309 FEEDING LINEIT. No. Art. n.5.6LS10.00- 0 €
TOTAL ELECTRICAL WORKS- 0 €
6. DOMESTIC WATER FILTERS AND SOFTENER
16REMOVALSIT. No. Art. n.6.1LS10.00- 0 €
17FLANGED BALL VALVESIT. No. Art. n.6.2LS10.00- 0 €
18WATER SOFTENERIT. No. Art. n.6.3LS10.00- 0 €
19WATER FILTERIT. No. Art. n.6.4LS10.00- 0 €
TOTAL DOMESTIC FILTER AND SOFTENER- 0 €
7. CIVIL WORKS
16MASONRY ASSISTANCEIT. No. Art. n.7.1LS10.00- 0 €

TOTAL COSTS EURO - 0 €

Sheet &P of & 4

File details come from the government source that posted it.