The reason for this amendment is to: 1) Address SOW concerns with the current requirement (Current SOW Rev4 15 Feb 2018) 2) Change Section L Requirements to reflect Section M 3) Include SOA OG01 as a possible certification for acceptability 4) Change completion timeline from 60 to 45 calendar days

View the file

Other files

File Type Posted
2ASHE181069_Tech_specs_Rev4.pdf PDF
ASHE_18-1069_BLANK_COST_ESTIMATE.xls XLS spreadsheet
ADDITIONAL_REQUIREMENTS_January_2018.pdf PDF
FA568218R0017.pdf PDF
2_ASHE181069_Tech_specs_Rev2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1F3B77340A001 ASHE 18-1069

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to:

1) Address SOW concerns w ith the current requirement (Current SOW Rev4 15 Feb 2018)

2) Change Section L Requirements to reflect Section M

3) Include SOA OG01 as a possible cerif ication for acceptability

4) Change completion timeline from 60 to 45 calendar days

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568218R0017

X 9B. DATED (SEE ITEM 11)

05-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Feb-2018

CODE

31 CONS LGC - FA5682

VIA PORDENONE 89/B, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

AVIANO (PN) 33081

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA568218R0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The contractor period of performance end date has decreased by 15 days from 60 days to 45 days.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT,

TRANSPORTATION, AND QUALIFIED PERSONNEL NECESSARY TO REPLACE CARPET IN

DESIGNATED AREAS OF 31 FW FAC. #1360 AS PER STATEMENT OF WORK. PERIOD OF

PERFORMANCE OUTLINED IN THE STATEMENT OF WORK SUPERCEEDS ANY DATES OUTLINED IN

THIS SOLOICITATION.NOTICE- ALL QUANTITIES INDICATED IN THE PROJECT DOCUMENTS

FURNISHED BY THE GOVERNMENT, INCLUDING THE CONSTRUCTION COST BREAKDOWN, ARE

ESTIMATES AND THE GOVERNMENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF

THE ESTIMATED QUANTITIES. THE CONTRACT SHALL REQUIRE A COMPLETED PROJECT ON A

LUMP SUM BASIS. IT IS THE RESPONSIBILITY OF THE OFFEROR TO CALCULATE, FORESEE AND

PERFORM ALL QUANTITIES OF WORK MANIFESTLY NECESSARY TO DELIVER A COMPLETE

PROJECT BASED ON ITS OVERALL SCOPE.- THE CONTRACTOR SHALL BE IN POSSESSION OF A

CURRENT SOA THROUGHOUT THE ENTIRE PERFORMANCE OF THE CONTRACT.

To:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT,MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHERNECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED

ATTHE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITHTHE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THEFOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS REV #4 FOR ASHE 18-1069 REPLACE CARPET IN THE 31 FW OFFICES, BLDG# 1360, AREA F, AVIANO AB, ITALY DATED 15 FEB 2018- PARAGRAPHS 4

AND 5 OF THE TECHNICAL SPECIFICATIONS

The following have been added by full text:

NOTICE

NOTICE:

- ALL QUANTITIES INDICATED IN THE PROJECT DOCUMENTS FURNISHED BY THE

GOVERNMENT, INCLUDING THE CONSTRUCTION COST BREAKDOWN, ARE ESTIMATES

AND THE GOVERNMENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF THE

ESTIMATED QUANTITIES. THE CONTRACT SHALL REQUIRE A COMPLETED PROJECT ON A

LUMP SUM BASIS. IT IS THE RESPONSIBILITY OF THE OFFEROR TO CALCULATE, FORESEE

AND PERFORM ALL QUANTITIES OF WORK MANIFESTLY NECESSARY TO DELIVER A

COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.

- THE CONTRACTOR SHALL BE IN POSSESSION OF A CURRENT SOA THROUGHOUT THE

ENTIRE PERFORMANCE OF THE CONTRACT.

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

60 dys. ANP 1 N/A

FOB: Destination

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

45 dys. ANP 1 N/A

FOB: Destination

The following have been added by reference:

52.211-10

The following have been added by full text:

PHASED COMPLETION INSTRUCTIONS

The Contractor shall be required to (a) commence work on PHASE I of this project [as stated in the tech specs V4 dated 15 February 2018] on 2 April 2018 and will complete all work included in PHASE I, to include cleanup, on or before 8 April 2018 (b) complete all works on PHASE II of this project [as stated in the tech specs V4 dated 15 February 2018] on or before 15 April 2018. The time stated for completion shall include final cleanup of the premises.

The following have been deleted:

52.211-10 Alt I

SECTION G - CONTRACT ADMINISTRATION DATA

The following have been modified:

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Construction Invoice

(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Not Applicable

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F78900 Issue By DoDAAC FA5682 Admin DoDAAC FA5682 Inspect By DoDAAC NOT APPLICABLE Ship To Code NOT APPLICABLE Ship From Code NOT APPLICABLE Mark For Code NOT APPLICABLE Service Approver (DoDAAC) NOT APPLICABLE Service Acceptor (DoDAAC) FA5682 Accept at Other DoDAAC NOT APPLICABLE LPO DoDAAC FA5682 DCAA Auditor DoDAAC NOT APPLICABLE Other DoDAAC(s) NOT APPLICABLE

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Jeffrey.Fluck@us.af.mil Alexander.newman@us.af.mil severino_francesco.mion.it@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Not Applcable

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

LIST OF ATTACHMENTS

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are an integral part of this contract:

a. Attachment 1:

Technical Specifications Rev #4 for ASHE 18-1069, Replace Carpet in the 31 FW, Bldg. 1306, Aviano, Italy, dated 15 February 2018

- 5 pages including cover page and attachments

b. Attachment 2:

Additional Requirements, dated January 2018

- 3 pages

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

The following have been deleted:

52.204-16

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by reference:

52.204-16 52.204-22

OFFEROR INSTRUCTIONS

L-01. OFFER PREPARATION INSTRUCTIONS

To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.

The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:

1. TECHNICAL ACCEPTABILITY

1a. QUALIFICATION CERTIFICATION

Submit current Societa’ Organismi di Attestazione (SOA) certification for category OG01 or OS06 and classification adequate to cover offeror’s proposed amount for project performance.

1b. EXPERIENCE

Submit offeror’s experience with the same work/trades and complexity as the instant requirement. The offeror shall submit evidence of two (2) contracts performed within the last three (3) years from the date of proposal that involved substantially the same work/trades and complexity as the instant requirement.

1c. TECHNICAL DATA

Submit technical data sheets that are IAW requirements listed in Technical Specifications. Further, the contractor will provide carpet samples of the proposed carpet to be installed.

2. PRICE OFFER

(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.

In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown form. The extended amount must equal the whole Euro unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J Attachment 2 “Additional Requirements”.

(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown shall be returned in their entirety.

L-02. CURRENCY

All prices in response to this solicitation will be in Euro currency.

L-03. OFFER DOCUMENTATION

All offer documentation in response to this solicitation must be submitted in the English language or with a summary translation.

L-04. OFFER SUBMISSION INSTRUCTIONS

Offers in response to this solicitation shall be submitted to reach the issuing office indicated at page 1 of the solicitation, Standard Form 1442 block 7, by the date and time specified in block 13A of the Standard Form 1442.

Submissions of offers must follow the guidance in the table below:

Submission Method Instructions

CD/DVD

Paper copy

Sealed envelope used to submit your offer must show the time and date specified for receipt, solicitation number, and the name and address of the offeror.

- one (1) original paper copy;

- one (1) redacted paper copy of the Experience indicated in Section L, provision L-01, paragraph 2. A redacted copy removes all direct references that can identify an offeror by name or other easily recognizable characteristic. The redacted copy will be used during evaluation procedures as detailed in Section M of the solicitation.

Electronic copies:

- one (1) original copy; and

- one (1) redacted copy of the Experience indicated in Section L, provision L-01, paragraph 2.

- Electronic copies must be submitted on CD or DVD. Electronic copies may be submitted on the same disk if sufficient capacity is available.

- Flash drives will not be accepted.

Note: Offerors are cautioned that Aviano AB has visitor control procedures. SOME DELAY SHOULD BE ANTICIPATED IF HAND CARRYING OFFERS. Offerors should allow sufficient time PRIOR to the time specified for receipt of offers.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

09 FEBRUARY 2018, 10:00 HRS and

15 FEBRUARY 2018, 09:30 HRS

(c) Participants will meet at--

Parking Area of Gate #8, LVIS Gate (Contractors Entry Gate) Area F Flightline Aviano Air Base, Italy

(End of provision)

SECTION M - EVALUATION FACTORS FOR AWARD

M-01 SELECTION

a. Basis for Contract Award This solicitation is subject to the Simplified Acquisition procedures (SAP) of the Federal Acquisition Regulation (FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil.

The Government will select the offer of the responsible vendor whose offer represents the best value after evaluation in accordance with the factors indicated in paragraph M-02 below.

b. Number of Contracts to be Awarded

The Government intends to award one contract for the performance of Project ASHE 18-1069, Replace FW Carpet, Fac. 1360 Area F, Aviano AB, Italy.

c. Solicitation Requirements, Terms and Conditions Offerors are required to meet all solicitation requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.

M-02 EVALUATION FACTORS

The following evaluation factors and subfactors will be used to evaluate each offer.

Factor 1: Technical Acceptability:

Subfactor 1: Qualification Certification This factor evaluates offeror’s current SOA certification for category OG01 or OS06 and classification adequate to cover offeror’s amount for project performance. This requirement is met when the offeror includes a copy of the current SOA certification for category OG 01 or OS06 and classification adequate to cover offeror’s amount for project performance.

Subfactor 2. Experience This factor evaluates offeror’s experience with the same work/trade and complexity as the instant requirement. This requirement is met when the offeror includes evidence of two (2) contracts for paint projects performed within the past three (3) years from the date of the offer that involved substantially the same work/trades and complexity as the instant requirement.

Subfactor 3: Technical Data Technical Data Sheets related to the carpet, baseboard and thresholds intended to be used for the execution of the work. This requirement is met when the technical data sheets are IAW requirements listed in Technical Specifications. Further, the contractor will provide carpet samples of the proposed carpet to be installed.

Factor 2: Price Price determined to be fair and reasonable. The offeror’s price will be evaluated for award purposes based upon the total price offered. Offerors whose price cannot be determined to be fair and reasonable may not be considered for award.

(End of Summary of Changes)