ASHE_17-1009_Specs_100__rev01_20_Nov_17.pdf
PDF 3 MB Posted
- Solicitation number
- FA5682-18-R-0010
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared and Submitted by:
Architecture, Engineering and Consulting Services
SO.IN.CI. S.r.l.
Via di Sacco Pastore n. 4 - Rome, Italy
Tel. +39.06.97848041 fax +39.06.97848175 E-mail: design@soinci.it
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
PROJECT ASHE 17-1009
CNS ADDITION TO SIERRA ALTERNATE
ARM-DEARM PAD
AREA F, AVIANO AB, ITALY.
TECHNICAL SPECIFICATIONS
FINAL SUBMITTAL (100%)
Date: March 2017
A/E CONTRACT No.: FA5682-13-D-0004 D.O.: 0017
Prepared and Submitted by:
Architecture, Engineering and Consulting Services
SO.IN.CI. S.r.l.
Via di Sacco Pastore n. 4 - Rome, Italy
Tel. +39.06.97848041 fax +39.06.97848175 E-mail: design@soinci.it
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
PROJECT ASHE 17-1009
CNS ADDITION TO SIERRA ALTERNATE
ARM-DEARM PAD
AREA F, AVIANO AB, ITALY.
TECHNICAL SPECIFICATIONS
HAVING REVIEWED THE DEFINITIVE AND DETAILED PROJECT, I DECLARE THAT I HAVE ASCERTAINED THAT
THE STRUCTURES AND THE TECHNOLOGICAL SYSTEMS INCLUDED THEREIN COMPLY WITH THE APPLICABLE
ITALIAN NORMS.
Date: March 2017
Civil:
Arch. M. Cantagallo
Ordine degli Architetti della Provincia di Frosinone
No.338 ……………………………………………………………………………
Electrical Systems:
Ing. Vincenzo De Stefano
Ordine degli Ingegneri della Provincia di Roma
No.10948, sez. A ……………………………………………………………………………
ASHE 17-1009 AC-1
INDEX
SECTION PAGE No.
AC1 - SCOPE OF PROJECT AND APPLICABLE CONDITIONS 1-9
AF FORM 66 - SCHEDULE OF MATERIAL SUBMITTALS 10-11
REVISED MASTER SPECIFICATIONS 12-27
ADDITIONAL SPECIFICATION 28-39
SCHEDULE OF WORK ITEMS 40-50
ASHE 17-1009 AC-1 1
SECTION AC1
SCOPE OF PROJECT AND APPLICABLE CONDITIONS
AC1-01 SCOPE OF PROJECT: The Scope of this project is “CONSTRUCT
ADDITION TO SIERRA ALTERNATE ARM-DEARM PAD”, located in Area "F" of the
Aviano Air Base.
The area to be paved, flat and almost completely covered with grass, is located in the north-west side of area F, in a restricted area not far from the flightline. The project includes the demolition of existing paved shoulder, demolition and upgrading of existing underground utilities, earth excavations, hearth works and the construction of a new “concrete rigid type” arm-dearm pad including paved and unpaved shoulders.
Work to be performed includes but are not limited to the following civil and electrical items:
a. Civil Work
- Demolition of bituminous concrete pavement consisting of base course, binder course, wearing course and foundation, 60 centimeters average thickness to provide new concrete pad;
- Excavation in any kind of soil and compactness to provide new concrete pad;
- Excavation in any kind of soil and compactness to provide new bituminous concrete shoulder;
- Excavation in any kind of soil and compactness to provide new unpaved shoulder and infiltration swale;
- Demolition and removal of existing storm drainage system, including pipes and catch basins;
- Construction of new bituminous concrete pavement for the new pad shoulder, Slope 2%. The pavement shall be composed by 30cm thick granular stabilized subbase, 15cm thick bituminous concrete base course, 7cm thick bituminous concrete binder course and 3cm thick bituminous concrete wearing course. Slope 2%;
- Construction of new concrete arm-dearm pad, slope 0,5%. The pavement shall be composed by 30cm thick granular stabilized subbase, 250 gr/sqm polyethylene layer and 30cm thick C32/40 concrete pavement including joints and sealants. Construction and expansion joints shall be provided with smooth steel dowels
- Construction of new unpaved shoulder and infiltration swale, slope
4%, including earth works to match existing ground elevation;
- Painting of new horizontal markings including the removal of existing markings;
- Repair/reroute of existing utility eventually damaged during demolition/construction works.
b. Electrical Work
- Removal of existing flush and elevated boundary lights;
ASHE 17-1009 AC-1 2
- Removal of existing grounding system;
- Upgrading of existing power cableduct to feed new lighting fixtures, including removal of existing electrical manhole. To be coordinated with electrical shop and user’s requirements;
- Furnishing and installation of new flush boundary light;
- Furnishing and installation new grounding system including pits and grounding rods;
- Furnishing and installation new aircraft’s grounding points, if any. To be coordinated with user’s requirements.
- Replacing of existing elevated boundary lights with new led type flush lights.
- Relocation of light panels as directed by user.
AC1-02 TECHNICAL SPECIFICATION: The following Sections of the Master
Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated November 2006 and applicable modifications, shall be applicable to the present project, together with the List of Work Items to be performed:
02722 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT
02724 AGGREGATE BASE COURSE AND SAND SUBBASE COURSE
02751 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY DUTY
PAVEMENTS
02762 JOINTS, REINFORCEMENT, AND MOORING EYES IN CONCRETE PAVEMENTS
02921 TURF
See Paragraphs AC1-23 and AC1-24 for the applicable specifications.
AC1-03 SUBMITTAL OF MATERIALS: In accordance with Paragraph 2.5 of the technical specification No. 01100/R, entitled “GENERAL CONDITIONS” of the
Master Specifications, the materials listed in AF Form 66 shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative.
The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials.
The number of copies will be as required on AF Form 66.
AC1-04 CONSTRUCTION AREA SCREENING: All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s Technical Representative.
Bilingual signs, "VIETATO L'INGRESSO - LAVORI IN CORSO / WORK AREA - NO
ENTRY" shall be placed at the work area entry and along each side of the fencing. The work area shall be fenced with new jersey type low barriers provided with approved lighting fixtures. Fence type, height and color should also be specified by the Base Civil Engineering (BCE). Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area fencing until approved, in writing, by BCE. Contractor shall submit photos or samples of the fencing material for approval by BCE. The
Contractor shall replace or repair in a timely manner, as determined by
ASHE 17-1009 AC-1 3
BCE, all fences and screening sections that have damages. At the end of the work or when exterior work requires it, temporary fencing shall be removed.
Night warning lights shall be installed to illuminate the work area, from sunset to dawn.
AC1-05 PROJECT SIGN: The Contractor shall furnish a project sign on site in accordance with Section 01101. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint. The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles.
There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit sign proposal to CE for approval.
AC1-06 JOB SITE MOBILIZATION: The Contractor shall submit a proposal to
BCE diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution can not begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE.
Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.
AC1-07 SAFETY: Contractor shall provide barricades, traffic control signs and construction safety signs that meet installation standards and comply with all applicable laws. Actual location, size and final arrangement of these items shall be discussed and approved by the BCE prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current host nation requirements and the U.S. Army Corps of Engineers Safety and Health Requirements Manual
EM 385-1-1. For more safety specifications please refer to the “Piano di sicurezza e coordinamento “(Safety Plan) included in this project.
AC1-08 HAZMAT/HAZWASTE HOUSEKEEPING: Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
a. Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
b. Material Safety Data Sheets: The Contractor shall furnish English language versions of the Material Safety Data Sheets (MSDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEV for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the MSDS form to the Contractor.
c. Hazardous Waste Management Plan: The Contractor shall provide an hazardous waste management plan.
ASHE 17-1009 AC-1 4
d. Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEV office.
e. Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers.
Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEV through the Director of
Works.
f. Asbestos Containing Materials: There is no evidence of Asbestos containing materials.
AC1-09 PRESERVATION OF EXISTING CONDITIONS: The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by BCE to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The
Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the base.
AC1-10 WORK SITE CONDITIONS: The work areas shall be made available to the Contractor as follows:
a. Work site location: The entire performance of this project will be in restricted areas requiring controlled entry/exit and escort at all times and this shall be considered during development of the work schedule. The government will not be held liable for unproductive time and other related costs due to delays in access/exit to/from the restricted areas or unannounced and immediate suspension of work due to military operations and/or exercises or safety reasons. The government will only negotiate an equitable extension of the performance period based on documented delays and unannounced suspensions of work.
b. Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break room) must be in like new condition and painted a color which coordinates with the base architectural plan and is approved by
BCE, unless it is hidden by the opaque fencing material.
Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour
Contractor’s point(s) of contact (POC) and telephone number where they can be reached.
c. Material Storage: Storage containers will be in like new condition, and painted a color which coordinates with the base architectural plan and is approved by BCE, if it is not hidden by
ASHE 17-1009 AC-1 5
the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the
Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The use of private security guards on a job site shall be coordinated with base Security Forces and approved by the installation commander.
The Contractor shall not use any area(s) for material or equipment storage that has not been approved by BCE.
d. Loading and Unloading of Construction Materials and Equipment:
Unloading of materials will be allowed within the fenced work area.
Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings.
Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area;
unless such operations will obstruct traffic flow.
e. Housekeeping and Site Cleanup: At the end of each working day, the Contractor shall be responsible for cleaning the area surrounding the building involved in the work.
Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily.
Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned the same day.
f. Construction Equipment: Contractor shall coordinate the availability of his equipment with airfield management in order to avoid any interference with flying operations and shall take the necessary precautions to avoid debris dispersion.
AC1-11 AIRFIELD SAFETY TRAINING: The Contractor shall contact Airfield
Management to receive flight line driver and airfield safety training prior to start of any work beginning on the flight line.
AC1-12 PARKING: Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction site or laydown areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public.
The Contractor shall not park outside the construction zone unless approved through BCE.
The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.
AC1-13 ACCESS ROUTES: The Contractor shall provide a haul route plan for
ASHE 17-1009 AC-1 6
approval by BCE.
For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four weeks prior to his scheduled starting of work.
AC1-14 TRUCKING AND ROADS: Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered.
Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall be tolerated. The Contractor shall sweep these areas continuously as long as material deliveries are being made.
AC1-15 NOISE CONTROL: The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.
AC1-16 EXCAVATIONS: Every trench/excavation shall be returned to its original condition within ten days of the original excavation; this may be extended to 30 days if approved by the BCE. Contractor shall phase trenching and excavation operations in order to comply. At minimum, Contractor shall restore the site to pre-excavation conditions. All soil stockpiles shall be hidden from view to the maximum extent possible. Prior approval by BCE is required if soil stockpiles are to remain exposed for long periods of time. Dust control measures are the responsibility of the
Contractor and shall be implemented as directed by BCE. All road cuts must be approved by BCE prior to execution.
AC1-17 LAWN MAINTENANCE: Grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be sodded, or hydro-seeded, where required by BCE.
Sodding, or seeding, damaged areas should be accomplished at the earliest planting season possible. Contractor shall be responsible for the successful growth and maintenance of all sodded, or seeded, areas under this contract for a period of thirty (30) days or three mowing after final acceptance of the work. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the
Contractor.
AC1-18 LAWN ESTABLISHMENT: Within seven (7) workdays of actual completion of work at contract site, the Contractor shall prepare all disturbed areas inside and outside of the fenced site for sodding, or hydro-seeding, as provided in contract specifications. Contractor shall restore the site to a condition and appearance equal to or better than existing before the work occurred. Such restoration work will not be considered complete, and the facility not accepted, until approved by BCE.
Additionally, no seeding shall be authorized for lawn establishment, whether new, or for restoration purposes unless specifically authorized by
BCE .
AC1-19 CONSTRUCTION SITE RESTORATION: All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five (5) days of
ASHE 17-1009 AC-1 7
Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five
(5) days of Government acceptance of the project site.
AC1-20 PROCEDURES AND WORK PHASES: Prior to starting any work the
Contractor shall submit a Work Plan for approval by the Contracting
Officer.
AC1-21 SALVAGEABLE MATERIALS: In this contract are indicated materials and equipment to be removed, stored and subsequently reinstalled. It shall be the responsibility of the Contractor to remove salvageable items with maximum care to avoid any damages; and to transport them to the storage areas as indicated by the Contracting Officer’s Technical Representative.
It shall be the responsibility of the Contractor to provide containers for material disposal and/or transportation of the salvageable items. All discarded materials shall be transported to an authorized public dump site by the Regional and National Regulation according to the typology of the related material. Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory.
AC1-22 CONSTRUCTION DRAWINGS: The following Construction Drawings complement this Technical Specification and are an integral part of the project documents:
DRAWING # SHEET
DESCRIPTION
GENERAL
1 of 14 T-1 PROJECT TITLE SHEET AND MAPS
2 of 14 T-2 LIST OF DRAWINGS & LEGENDS
CIVIL
3 of 14 C-1 EXISTING CONDITION - GENERAL SITE PLAN
4 of 14 C-2 EXISTING CONDITION – TOPO SURVEY & DEMOLITION PLAN-1/2
5 of 14 C-3 EXISTING CONDITION - TOPO SURVEY & DEMOLITION PLAN-2/2
6 of 14 C-4 NEW CONDITION - GENERAL SITE PLAN
7 of 14 C-5 NEW CONDITION – SITE ENLARGED PLAN 1/2
8 of 14 C-6 NEW CONDITION – SITE ENLARGED PLAN 2/2
9 of 14 C-7 NEW CONDITION – DETAILS
10 of 14 C-8 NEW CONDITION – DETAILS
11 of 14 C-9 NEW CONDITION – MARKING PLAN
ELECTRICAL
12 of 14 E-1 EXISTING CONDITION – DEMOLITION PLAN
13 of 14 E-2 NEW CONDITION – LIGHTING AND GROUNDING SYSTEM PLAN AND
DETAILS
14 OF 14 E-3 NEW CONDITION – ELECTRICAL SYSTEMS DETAILS
AC1-23 ADDITIONAL SPECIFICATIONS: In addition to the Norms and
Specifications contained in the Master Specifications as noted in Section
AC1-02 of these Technical Specifications, the following Additional
Specifications shall apply to this project:
16531 AIRFIELD LIGHTING
ASHE 17-1009 AC-1 8
AC1-24 REVISED MASTER SPECIFICATIONS: In addition to the Norms and
Specifications contained in the Master Specifications as noted in Section
AC1-02 of these Technical Specifications, the following Revised Master
Specifications shall apply to this project
01100/R GENERAL CONDITIONS
01101/R PROJECT SIGN
02220/R SITE DEMOLITION
02315/R EXCAVATION AND FILL
02741/R BITUMINOUS CONCRETE PAVEMENT
02761/R PAVEMENT MARKING
03300/R CAST-IN-PLACE CONCRETE
16050/R BASIC ELECTRICAL MATERIALS AND METHODS
16303/R UNDERGROUND TRANSMISSION AND DISTRIBUTION LINES
AC1-25 ADDITIONAL NORMS AND STANDARDS: Furthermore the works included in this project shall be in accordance, when applicable, with the NFPA, ASTM, UL, HANDBOOKS, Norms and Standards, whose manuals and regulations are available for review at the Contracting Officer. In this project the following standard have been applied:
UFC 3-260-01 AIRFIELD AND HELIPORT PLANNING AND DESIGN;
UFC 3-260-02 PAVEMENT DESIGN FOR AIRFIELDS;
NAVAIR 51-50AAA-2 GENERAL REQUIREMENTS FOR SHOREBASED AIRFIELD MARKING
AND LIGHTING.
AC1-26 FINAL ACCEPTANCE TEST & CERTIFICATIONS:
a. Once issued NTP, Contractor is required to contact CEAOR (Ms.
Cristina Rossetto 0434-305691) and schedule a meeting to fill Form
DD1354 with appropriate project data for real property capitalization (DD1354 and category codes list CATCODE_LIST_2010 are available in engineering office during normal hour of operations). Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out;
b. All installed new electrical equipment shall have the required
Italian Mark of Quality and shall conform to D.P.R. No. 459, dated
24 July 1996, with "C.E." Mark; and three copies of relevant certificates shall be furnished to the Contracting Officer for each item of equipment installed. Furthermore the electric equipment shall be in compliance with the Legislative Decree No.
81/08 and subsequent modifications which apply the Directive
93/68/CEE. Electrical tests shall comply with Low 37/08 and CEI
64/8 Norm.
c. At the end of the work, the Contractor shall provide the
Government with three copies of the following documents:
1. Certificate of Compliance with Law No. 37/08, for the installation of the electrical systems in a workmanlike manner, signed by the Contractor.
2. Final Acceptance Test Certifications for electrical systems signed by a Registered Engineer to be selected from three candidates proposed by the Contractor to the Contracting
ASHE 17-1009 AC-1 9
3. Concrete pad Test certificate signed by an engineer or authorized technician.
AFForm 66, OCT 89
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ASHE 17-1009
PROJECT TITLE
CNS ADDITION TO SIERRA ALTERNATE ARM-DEARM PAD
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
D A
T E
R E
C E
IV
E
IN
C O
N T
R A
C T
G
T E
T O
C
IV
IL
N
G
IN
E E
R
T U
R N
S U
S P
E N
S
U
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
L
F
A L
A P
P R
O V
LI
E N
U M
B
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
LI
A
N
H
O P
D R
A W
M P
LE
LO
R
S E
LE
C
T
IO
M
N U
F A
C T
U R
E
’S
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E R
’S W
A R
R A
N
Y
T A
LO
G
D A
P
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
D S
DATE CONTRACTOR
NOTIFIED REMARKS
APPROVED DIS-
APPROVED
PART II - CIVIL WORK
Material Safety Data Sheets (MSDS) 3
1 Bituminous Concrete Shoulder Part II Item 1a, 1b, 1c, 1d
3 3 30
2 Concrete Arm Dearm Pad - Subbase Part II Item 2a
3 3 30
3 Concrete Arm Dearm Pad - Polyetilene Part II Item 2b
3 30
4 Concrete Arm Dearm Pad – Concrete slab Part II Item, 2c
3 3 3 30
5 Concrete Arm Dearm Pad – Joints Sealant and Backer Rod Part II Item 2c
3 3 3 3 30
6 Concrete Arm Dearm Pad – Dowel Part II Item 2d
3 3 30
7 Infiltration Swale Part II Item 4
3 3
8 Horizontal Markings Part II Item 5
3 3 3 3 3 30
AFForm 66, OCT 89
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ASHE 17-1009
PROJECT TITLE
CNS ADDITION TO SIERRA ALTERNATE ARM-DEARM PAD
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N T
R A
C T
T E
T O
C
IV
IL
G
IN
E E
R
T U
R N
S U
S P
E N
U
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
F
A L
A P
P R
O V
LI
E N
U M
B
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
LI
A
N
H
O P
D R
A W
M P
LE
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
’S
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E R
’S W
A R
R A
N
Y
T A
LO
G
D A
P
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
D S
DATE CONTRACTOR
NOTIFIED REMARKS
APPROVED DIS-
APPROVED
PART III - ELECTRICAL WORK
Material Safety Data Sheets (MSDS) 3
9 Cable duct Part III Item1
10 6kV Cables Part III Item 2
11 Lighting Fixtures Part III Item s 3 and 4
3 3 3 3 3 3 30
12 Grounding System Part III Item 5
3 3 3 3 3 3 30
13 Testing Part III Item 6
3 30
REVISED SPECIFICATIONS
Section 01100/R 13
REVISED SPECIFICATIONS INDEX
SECTION 01100/R GENERAL CONDITIONS
SECTION 01101/R PROJECT SIGN
SECTION 02220/R SITE DEMOLITION
SECTION 02315/R EXCAVATION AND FILL
SECTION 02741/R BITUMINOUS CONCRETE PAVEMENT
SECTION 02761/R PAVEMENT MARKING
SECTION 03300/R CAST-IN-PLACE CONCRETE
SECTION 16050/R BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 16303/R UNDERGROUND TRANSMISSION AND DISTRIBUTION LINES
Section 01100/R 14
SECTION 01100/R
GENERAL CONDITIONS
PART 1 – APPLICABLE NORMS
Paragraph 1.1:
Delete:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system and electrical system.
Add:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system, fire protection system and electrical system.
c. Legislative Decree No. 494 dated 14 August 1996.
d. Legislative Decree No. 528 dated 19 November 1999.
c. Legislative Decree No. 81 dated 9 April 2008.
Paragraph 1.2.2
Replace “Law No. 46 dated 5 March 1990” with “ Ministerial Decree 37/2007
Paragraph 1.2.3
a. Certificate of compliance for electrical systems in accordance with
CEI regulations and with D.P.R. No.547 dated 27 April 1955 on accident prevention.
a. Certificate of approval of the grounding and lightning protection systems, in accordance to CEI Norms and D.P.R. No. 462/01.
Revise Paragraph "3.2 UTILITY CUT-OFF" as follows:
Delete "ten (10) days" and insert "three (3) weeks" .
-- End of Section --
Section 01101/R 15
SECTION 01101/R
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the
Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site.
The sign shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. ERP Coordinates
Lettering of the sign will be as shown on the following sketch, and may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.
Section 01101/R 16
-- End of Section –-
Section 02220/R 17
SECTION 02220/R
SITE DEMOLITION
Add the following paragraph:
1.1.5 Electrical and Electronic Equipment Waste Disposal (RAEE)
Disposal of the Electrical and Electronic Equipment Waste (RAEE) shall be in compliance with Legislative Decree No. 151 dated 25 July 2005:
Accomplishment of the European Directive Relevant to the Electrical and
Electronic Equipment Waste.
-- End of Section –-
Section 02315/R 18
SECTION 02315/R
EXCAVATION AND FILL
Paragraph 1.1:
Add:
Legislative Decreec No. 528 (1999) Amendments to the legislative decree of 14 August 1996 no. 494, implementing Directive 92/57/EEC concerning minimum safety and health requirements at temporary or mobile work sites.
Section 02741/R 19
SECTION 02741/R
BITUMINOUS CONCRETE PAVEMENT
UNI 2332/1 (1979) Testing sieves and their bases and covers. Dimension and tolerances.
UNI 2334 (1943) Testing sieves and their bases and covers.
Legislative Decree No. 528 (1999) Amendments to the legislative decree of 14 August 1996 no. 494, implementing Directive 92/57/EEC concerning minimum safety and health requirements at temporary or mobile work sites.
Section 02761/R 20
SECTION 02761/R
PAVEMENT MARKING
Add at the end of Paragraph 2.1.2.2 the following sentence:
"Other manufacturers meeting the requirements of this specification are acceptable.”
Section 03300/R 21
SECTION 03300/R
CAST-IN-PLACE CONCRETE
Ministerial Decree dated 9 Jan 1996 Technical Norms for the Calculations, Execution and Testing of Normal and
Prestressed Reinforced Concrete Structures and Metal Structures.
dated 16 Jan 1996 Technical Norms for Constructions in
Seismic Zone.
dated 14 Feb 1992 Technical Norms for the Calculations, Execution and testing of Normal and
Prestressed Reinforced Concrete Structures and metal Structures.
dated 16 Jan 1996 Technical Norms for Safety Test of the
Constructions, Load, and Live Loads.
Ministerial Circular No.65 dated 10 Apr 1997 Instruction for the application of
“Technical Norms for Constructions in
Seismic Zones” dated 16 Jan 1996”.
National Research Council(CNR-UNI)
Publication No. 10011/88 Steel structures; instruction for calculation, execution, testing, and maintenance.
dated 20 March 2003, No. 3274 “First Elements in Matter of General
Criteria for Seismic Classification of
National Territory and of Technical
Regulations for Construction in Seismic
Zone”.
dated 14 January 2008: “Technical Norms for Constructions”.
UNI EN 10002-1 (1992)Metallic Materials. Tensile Testing.
Method of Test (At Ambient Temperature).
UNI ENV 10080 (1997) Steel for the Reinforcement of
Concrete. Weldable Ribbed Reinforcing
Section 03300/R 22
Steel B500. Technical Delivery Conditions for Bars, Coils and Welded Fabric.
UNI EN 934-2 (2002) Admixtures for Concrete, Mortar and
Grout. Concrete Admixtures. Definitions, Requirements, Conformity, Marking and
Labeling.
UNI EN 206-1 (2001) Concrete. Specification, Performance, Production and Conformity.
UNI 8520 (1999)Aggregates for Concrete Mixes.
Definition, Classification and Properties.
UNI EN 10002-1 (2004)Metallic Materials. Tensile Testing.
Part 1: Method of Test at Ambient
Temperature.
UNI ENV 10080 (2005) Steel for the Reinforcement of
Concrete. Weldable Ribbed Reinforcing
Steel B500. Technical Delivery Conditions for Bars, Coils and Welded Fabric.
UNI EN 934-2 (2007) Admixtures for Concrete, Mortar and
Grout. Part 2: Concrete Admixtures.
Definitions, Requirements, Conformity, Marking and Labeling.
UNI EN 206-1 (2006) Concrete. Part 1: Specification, Performance, Production and Conformity.
UNI 8520-1 (2005)Aggregates for Concrete.
Additional Provisions for the Application of EN 12620. Part 1: Conformity Criteria.
Paragraph 1.5.1:
Delete “Ministerial Decree 9 Jan. 1996” and replace with “Ministerial
Decree dated 14 January 2008”
Delete the tab:
Type of Construction Rck (kg/cm2)
Lean concrete 200
Rigid Pavements including 250 sidewalks, curbs and equipment pads
Drainage and Sanitary Sewer 250
Appurtenances
Thrust blocks, Pipeline 300
Encasements
Section 03300/R 23
Foundations, Grade Beams and 300
Grade Walls
Floor Slabs on Grade 250
Columns, Beams Above Grade Slabs 350 and Walls
All other concrete 300
Replace with:
Type of Construction Rck (kg/cm2) Class of resistance
Lean concrete 200 C16/20
Rigid Pavements including sidewalks, curbs and equipment pads
250 C20/25
Drainage and Sanitary
Sewer Appurtenances 250 C20/25
Thrust blocks, Pipeline
Encasements
300 C25/30
Foundations, Grade
Beams and Grade Walls 250 C20/25
Floor Slabs on Grade 250 C20/25
Columns, Beams Above
Grade Slabs and Walls
300 C25/30
“Floor slab type predalles” 350 C28/35
All other concrete 300 C25/30
Paragraph 2.6.1:
Delete “FeB44K with a minimum yield strength of 430 N/mm2” and replace with
“B450C with a minimum yield strength of 450 N/mm2”
“Reinforcing bars 28 millimeters in diameter and larger shall be high strength factory designed helically deformed bars conforming to UNI 6407, designation FeB38 with a minimum yield strength of 3,800 kilograms per square centimeter”.
Paragraph 2.6.1:
PART 3 - EXECUTION:
Section 03300/R 24
Paragraph 3.1.2.4:
Paragraph 3.8.1:
Paragraph 3.10.4:
Section 16050/R 25
SECTION 16050/R
BASIC ELECTRICAL MATERIALS AND METHODS
Paragraph 1.1:
Delete: entire paragraph
Add: Paragraph 1.1:
CEI 64-8 (2016) Electrical Systems with Rated
Voltage Below 1000 V a.c. and 1500 V d.c.
CEI 16-2 (2011) Identification of Equipment
Terminals.
CEI EN 60706-2 (2006) Equipment Maintenance.
Paragraph 1.3.5, first word: “CEI 64-8”.
Paragraph 1.4, at the end of line: “and CEI EN 60706-2”.
Section 16530/R 26
SECTION 16303/R
UNDERGROUND TRANSMISSION AND DISTRIBUTION LINES
Delete: entire paragraph
Paragraph 1.3.1
Delete items “c” and “d”
Paragraph 2.1.1.1
Delete “UNI 7683, IEC 614 and UNI 6125” and replace with “CEI EN 60423”
Paragraph 2.1.1.2
Delete “CEI Norms 23-8” and replace with “CEI EN 60423 and CEI EN 61386-24”
Paragraph 2.1.2
Delete “IEC Section 454 and CEI 15-15” and replace with “CEI EN 60674-3-1”
Paragraph 2.1.3.2
Delete “CEI Norm 20-13” and replace with “CEI 20-22/II and CEI 11-17”
Paragraph 2.1.3.3
Delete entire pragraph
Paragraph 2.1.3.4
Paragraph 2.1.4
Delete “CEI 11-8” and replace with “CEI 64-8”
Paragraph 3.1
Delete “CEI 11-18”
Paragraph 3.1.7.1
Delete “CEI 11-8” and replace with “CEI 64-8”
Paragraph 3.1.8
Paragraph 3.1.12
Delete words from “not exceding………..to grounds not otherwise covered 10
Ohms” and replace with “in accordance with CEI 64-8”
Paragraph 3.1.12.4
Section 16530/R 27
Delete “conforming to CEI 7-4”
Paragraph 3.2.2
Delete entire pragraph
Add: Paragraph 1.1:
CEI EN 60423 (2008) Conduits for electrical purposes - Outside diameters of conduits for electrical installations and threads for conduits and fittings.
CEI EN 60674-3-1 (2012) Plastic film for electrical use.
CEI EN 61386-24 (2011) Conduit systems for electrical installations. Part 24: Particular requirement for conduit systems buried underground.
CEI 11-17 (2011) Electric Power Generation, Transportation and Distribution Systems. Cable Lines.
CEI 20-22/2 (2006) Fire Tests on electrical cables.
CEI 64-8 (2016) Electrical Systems With Rated Voltages not
Greater Than 1000 V a.c. and 1500 V d.c.
Section 16531 28
ADDITIONAL SPECIFICATION
Section 16531 29
REVISED SPECIFICATIONS INDEX
SECTION 16531 AIRFIELD LIGHTING
PART 1 GENERAL
PART 2 PRODUCTS
PART 3 EXECUTION
Section 16531 30
SECTION 16531
AIRFIELD LIGHTING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 150/5345-26 (2008; Rev D) FAA Specification for L-823
Plug and Receptacle, Cable Connectors
FAA AC 150/5345-42 (2013; Rev G) Specification for Airport
Light Bases, Transformer Housings, Junction
Boxes and Accessories
FAA AC 150/5345-46 (2016; Rev E) Specification for Runway and
Taxiway Light Fixtures
FAA AC 150/5345-47 (2005; Rev G) Specification for Series to
Series Isolation Transformers for Airport
Lighting Systems
FAA AC 150/5345-7 (2013; Rev F) Specification for L-824
Underground Electrical Cable for Airport
Lighting Circuits
COMITATO ELETTROTECNICO ITALIANO (CEI NORMS)
CEI EN 60423 (2008) Conduits for Electrical Purposes.
Outside Diameters of Conduits.
CEI EN 60674-3-1 (2011) Plaster Film for Electrical Purpose.
Part 3-1
CEI 20-22/2 (2006) Fire Tests on Electrical Cables
CEI 20-35/1-2 (2016) Tests on Electrical and Optical
Cables under Fire Conditions. Part 1-2
CEI 20-37 (2015) Fire Test Methods for Cables under
Fire Conditions. Test on Gas issued duering the burning.
CEI 64-8 (2013) Electrical System with Rated Voltage not greater then 1000V a.c. and 1500 V d.c.
Section 16531 31
1.2 RELATED REQUIREMENTS
Section 16050 BASIC ELECTRICAL MATERIALS AND METHODS, applies to this section with additions and modifications specified herein.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality
Control approval.
SD-02 Shop Drawings
Each type of airfield lighting fixture installation
SD-03 Product Data
Series airfield lighting cable
Isolating transformers
Each type of taxiway lighting fixture
Each type of light bases
FAA Type P-606 sealant
FAA Type L-823 connectors
SD-06 Test Reports
Counterpoise system test
SD-07 Certificates
Installer Qualifications; G
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
Do not install materials which are not approved as "Approved Airport
Equipment" by FAA unless specifically approved by the electrical design engineer. Inspect wire and cable for date of manufacture. Do not use wire and cable manufactured more than one year before delivery to job site.
1.4.2 Regulatory Requirements
Provide materials and equipment listed by FAA when such equipment is listed or approved. Do not use askarel, tetrachlorethylene and insulating liquids containing polychlorinated biphenyls (PCBs) in equipment. Provide submersible type equipment installed below grade in vaults, manholes, and handholes. Materials must be certified and listed as "Approved Airport Lighting Equipment" downloadable from: <URL
HREF="http://www.faa.gov/arp/pdf/534553ad.pdf">http://www.faa.gov/arp/pdf
/534553ad.pdf</URL>.
Section 16531 32
1.4.3 Installer Qualifications
The aviation lighting equipment contractor and installation electricians must be experienced in installing, testing and maintaining aviation lighting systems of a similar complexity. The contractor must provide a list of government projects and 3 years of experience in constructing similar projects. Include written certification that systems have performed satisfactorily for not less than 18 months.
1.4.4 Construction Outage Plan
The contractor must provide a construction outage plan and schedule for installing new and retrofitting the existing lighting system to ensure that aviation lighting circuits are fully operational between dusk and dawn during each day of the construction contract. The plan must be submitted to and approved by the Contracting Officer and the Airfield
Manager prior to starting construction.
PART 2 PRODUCTS
2.1 ELECTRICAL TAPE
CEI EN 60674-3-1, plastic insulating tape.
2.2 NAMEPLATES
Provide laminated plastic nameplates for equipment, controls, and devices to identify function, and where applicable, position. Provide 3.17 mm thick laminated Melamine plastic, white with black center core. Surface shall be a matte finish with square corners. Align and engrave lettering accurately into the black core. Size of nameplates shall be 25 mm by 65 mm minimum with minimum 6.35 mm high normal block lettering. Provide number, location, and letter designation of nameplates as indicated.
Fasten nameplates to the device with a minimum of two sheet metal screws or two rivets.
2.3 CONDUIT, CONDUIT FITTINGS, AND BOXES
2.3.1 Plastic Duct for Concrete Encased Burial
PVC conforming to CEI EN 60423.
2.4 WIRE AND CABLE
Do not provide or install wire and cable manufactured more than one year before delivery to the job site. Conductors shall be copper.
2.4.1 Conductor Sizes
Conform to European Standards.
2.4.2 Low Voltage Wire and Cable
CEI 20-22/2, CEI 20-35/1-2, CEI 20-37 600 volts for underground low voltage power cables for secondary series lighting circuits.
Section 16531 33
2.4.3 Wire and Cable for Airfield Lighting Systems
2.4.3.1 Airfield Lighting Cable
FAA AC 150/5345-7, Type L-824, for crosslinked polyethylene Type C 5000-volt cable. Series airfield lighting cable shall be unshielded.
2.4.3.2 Counterpoise Wire
35 Sq mm bare stranded copper, annealed or soft drawn.
2.4.3.3 Fused Cable Connectors
Provide connector consisting of a line side receptacle and a load side plug, each in a molded rubber form and including crimp-on fittings for the cable ends to accommodate a 250-volt cartridge-type fuse. Provide fuse with rating indicated. Provide connectors in kit form properly sized for the specific cable diameter involved. Completed connection shall be watertight.
2.4.4 Cable Tags
Provide cable tags for each cable or wire at duct entrances entering or leaving of manholes, handholes, and at each terminal within the lighting vault. Provide stainless steel, bronze, lead strap, or copper strip tags approximately 1.55 mm thick or hard plastic 3.17 mm thick suitable for immersion in salt water and impervious to petroleum products. Provide sufficient length for imprinting the legend on one line using raised letters not less than 6.35 mm in size. Permanently mark or stamp with the identification as directed. Two-color laminated plastic is acceptable. Provide dark colored plastic tags with markings of light color to provide contrast so that identification can be easily read.
Provide fastening material of a type that will not deteriorate when exposed to water with a high saline content and petroleum products.
2.4.5 Concrete Markers for Direct Buried Cable Systems
Provide as specified in Section <SRF>16303</SRF> UNDERGROUND TRANSMISSION
AND DISTRIBUTION LINES.
2.5 GROUND RODS
CEI 64-8. Copper-clad steel with diameter adequate to permit driving to full length of the rod, but not less than 19 mm in diameter and 3050 mm long, unless indicated otherwise.
2.6 LED INSET TAXIWAY EDGE LIGHT
FAA AC 150/5345-46 L852T(L) and EB No. 67. Suitable for 12" diameter base with 28VA blue led light, 2,8A to 6,6A complete with lens, lens gaskets, aluminum lens folder, O-ring for dome, FAA AC 150/5345-42 L868 base and mounting accessories as shown on the project drawings.
2.7 TRANSFORMERS
2.7.1 Encapsulated Isolating Transformers
FAA AC 150/5345-47, Type (G) L-830. Provide each transformer with rating as indicated. Insulation Level Primary voltage rating 5000 volts RMS.
Section 16531 34
Operating Temperature range minus 55 degrees Celsius to plus 65 degrees
Celsius. Resistant to UV exposure and ozone. Suitable for areas contaminated with oils, aircraft fuels, soil acids, alkalis, and deicing fluids. Compatible with FAA Style 2 and Style 9 connectors.
2.8 CONNECTORS
FAA AC 150/5345-26, FAA Type L-823 connectors for use with FAA Type L-824 airfield lighting cable.
PART 3 EXECUTION
3.1 ELECTRICAL REQUIREMENTS
Electrical installation shall conform to FAA Specifications, CEI 64-8 and requirements specified herein. Underground electrical work shall be as specified in Section 16303 UNDERGROUND TRANSMISSION AND DISTRIBUTION
LINES.
3.1.1 Electrical Metallic Tubing
Do not install underground or encase in concrete.
3.2 CONCRETE
Unless otherwise specified, provide 20.67 MPa concrete for below grade and 27.56 MPa concrete for above grade use with 25 mm maximum aggregate.
3.3 AIRFIELD MANHOLES
Provide as specified in Section 16303 UNDERGROUND TRANSMISSION AND
DISTRIBUTION LINES
3.4 EARTHWORK
Provide excavation, backfilling, and reconditioning of surfaces as specified in Section 16303 UNDERGROUND TRANSMISSION AND DISTRIBUTION
LINES.
3.5 GROUNDING
Ground non-current carrying metallic parts associated with electrical equipment as specified in Section 16303 UNDERGROUND TRANSMISSION AND
DISTRIBUTION LINES.
3.6 CABLE MARKERS
Provide cable markers or tags for each cable at duct entrances entering or leaving manholes or handholes and at each termination within the lighting vault. Tag cables in each manhole or handhole with not less than two tags per cable, one near each duct entrance hole. Immediately after cable installation, permanently attach tags to cables and wires so that they cannot be accidentally detached.
3.7 FLUSH AIRFIELD LIGHTS
Remove water, debris, and other foreign substances prior to installing flush light base and light.
Section 16531 35
3.8 WIRES, FIXTURES, AND ENCLOSURES IN SAW KERFS OR DRILLED HOLES
Sealant is specified in paragraph entitled "Sealing Fixtures and Wires in
Drilled Holes or Saw Kerfs."
3.8.1 Holes for Light Fixtures
Bore holes in pavement to dimensions indicated. Use a diamond-edged bit to provide a smooth, straight cut. Bottom of hole shall be flat or slightly concave, except that an area at least 25 mm wide around the perimeter shall be flat. Fill surfaces deeper than the prescribed depth with sealant to the level of the flat area and allow to cure before further placement.
3.8.2 Holes for Transformer Enclosures
Drill holes through concrete pavement and remove loose material. Fill hole with concrete to depth indicated. Provide a minimum of 75 mm of concrete at bottom of hole.
3.8.3 Cleaning
Immediately prior to installation of wire or light fixtures, flush saw kerfs and holes with a high velocity water jet or steam, and clean and dry with a high velocity air jet to remove dirt and foreign material.
3.8.4 Lighting Fixture Installation
Sandblast sides and bottom of each light fixture immediately prior to installation. Cover inside faces of bored hole and bottom and sides of light fixture with a coating of sealant that will completely fill the void between concrete and fixture. Use a jig or holding device for installing each light fixture to ensure positioning to the proper elevation, alignment, level control, and azimuth control. Orient light fixture with light beam parallel to flight deck centerline or runway centerline and facing in the particular direction required. Level outermost edge of fixture with the surrounding pavement. Remove surplus sealant or flexible embedding material. Leave the holding device in place until sealant has reached its initial set. Properly arrange fixture lead wires with respect to their connecting position. Block the wire way entrance into the light recess to retain the sealant material during curing.
3.8.5 Installation of Circuit Wires in Pavement
Place the wires in saw kerfs and anchor at bottom by means of rubber or plastic wedges or noncorrosive metal clips placed every 610 or 915 mm or as often as necessary to hold the wire down. Where wires cross existing joints, encase wires in a 305 mm length of flexible tubing of polyethylene material to break the bond between the wires and the sealing material. Provide tubing centered on the joint and of sufficient size to accommodate the wires to allow for movement of the wires as the joint opens and closes. Wrap ends of tubing with tape to prevent entrance of sealing materials. Pack the adjacent joint area temporarily with roving material, such as hemp, jute, cotton or flax, to prevent sealing material from flowing into the open joint. Carefully mix and apply sealing materials in accordance with the manufacturer's instructions and at the recommended temperature. Remove surplus or spilled material.
Section 16531 36
3.9 SPLICES FOR AIRFIELD LIGHTING CABLE
3.9.1 Connectors
Use kit type connectors to splice 5 kV single-conductor series lighting cables. During installation and prior to covering with earth, keep mating surfaces of connectors covered until connected and clean when plugged together. At joint where connectors come together, install heat shrinkable tubing with waterproof sealant. Alternately, the Contractor may provide two half lapped layers of tape over the entire joint. Joint shall prevent entrapment of air which might subsequently loosen the joint.
3.9.2 Splicing Fixtures to the Wires in Pavement Saw Kerfs
Make splices with preinsulated watertight connector sleeves crimped with a tool that requires a complete crimp before tool can be removed.
3.10 GROUNDING SYSTEMS
3.10.1 Counterpoise Installation
Lay counterpoise wire for entire length of circuits supplying airfield lighting.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.