FOR OFFICIAL USE ONLY

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

CNS ADDITION TO SIERRA ALTERNATE ARM-DEARM PAD

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1009 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni

Ia Civil - Ia Civile

DEMOLITION AND EXCAVATION OF BITUMINOUS CONCRETE

PAVEMENT FOR NEW CONCRETE PAD

Demolizione e scavo di pavimentazione in conglomerato bituminoso per nuovo piazzale in calcestruzzo

IT. No.

Art. n.

1 Sq.m/Mq

EXCAVATION IN ANY KIND OF SOIL FOR NEW CONCRETE

PAD

Scavo in terreno per nuovo piazzale in calcestruzzo

IT. No.

Art. n.

2 Cu.m/Mc

EXCAVATION IN ANY KIND OF SOIL FOR NEW BITIMINOUS

CONCRETE SHOULDER

Scavo in terreno per nuova Banchina in gonglomerato bituminoso

IT. No.

Art. n.

3 Cu.m/Mc

EXCAVATION IN ANY KIND OF SOIL FOR NEW UNPAVED

SHOULDER

Scavo in terreno per nuova Banchina non pavimenteata

IT. No.

Art. n.

4 Cu.m/Mc

DEMOLITION AND REMOVAL OF EXISTING DRAINAGE

SYSTEM

Demolizione e rimozione impianto drenaggio esistente

IT. No.

Art. n.

5 Ls/Ac

REMOVAL AND STORE OF PRECAST SLABS

Rimozione ed accantonamento di elementi modulari in cls

IT. No.

Art. n.

6 Ea/No

Total Civil - Totale Civile

Ib Electrical - Ib Elettrico

REMOVAL FLUSH LIGHTING FIXTURES

Rimozione dei corpi illuminanti incassati

IT. No.

Art. n.

7 Ea/No

REMOVAL ELEVATED LIGHTING FIXTURES

Rimozione dei corpi illuminanti sporgenti

IT. No.

Art. n.

8 Ea/No

REMOVAL AND STORE OF HOLDING POSITION SIGN

Rimozione e accantonamento segnale di arresto

IT. No.

Art. n.

9 Ea/No

REMOVAL GROUNDING MANHOLES

Rimozione dei pozzetti di terra

IT. No.

Art. n.

10 Ea/No

Total Electrical - Totale Elettrico

TOTAL PART I / Totale Parte I

FOR OFFICIAL USE ONLY 1

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

CNS ADDITION TO SIERRA ALTERNATE ARM-DEARM PAD

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1009 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART II - CIVIL WORK / Parte II - Lavori Civili

SHOULDER - 30cm THICK GRAVEL MATERIAL

Banchina - Strato in misto granulare, sp=30cm

IT. No.

Art. n.

1a Cu.m/Mc

SHOULDER - 15cm THICK BASE COURSE

Banchina - Strato di base, sp=15cm

IT. No.

Art. n.

1b Sq.m/Mq

SHOULDER - 7cm THICK BINDER COUSE

Banchina - Strato di collegamento, sp=7cm

IT. No.

Art. n.

1c Sq.m/Mq

SHOULDER - 3cm THICK WEARING COURSE

Banchina - Strato di usura, sp=3cm

IT. No.

Art. n.

1d Sq.m/Mq

PAD - 30cm THICK STABILIZED GRAVEL MATERIAL

Piazzale - Strato in misto granulare stabilizzato, sp=30cm

IT. No.

Art. n.

2a Cu.m/Mc

PAD - 250Gr/Mq POLYETHYLENE LAYER

Piazzale - Foglio in polietilene 250 gr/mq

IT. No.

Art. n.

2b Sq.m/Mq

PAD - 30cm THICK CONCRETE PAVEMENT, INCL JOINTS

Piazzale - Pav. in calcestruzzo, SP=30cm, incl giunti

IT. No.

Art. n.

2c Sq.m/Mq

PAD - STEEL DOWELS

Piazzale - Barotti

IT. No.

Art. n.

2d Kg

UNPAVED SHOULDER

Banchina non pavimentata

IT. No.

Art. n.

3 Sq.m/Mq

DRAINING DITCH

Cunetta drenante

IT. No.

Art. n.

4 Ls/Ac

PAINTING OF MARKING STRIPS

Pitturazione di strisce di segnalazione

IT. No.

Art. n.

5 Lm/Ml

REPAIR/REROUTE OF EXISTING UTILITIES

Ripristino/deviazione utenze esistenti

IT. No.

Art. n.

6 Ls/Ac

RESTORATION OF GRASS AREA

Ripristino manto erboso

IT. No.

Art. n.

7 Sq.m/Mq

TOTAL PART II / Totale Parte II

PART III- ELECTRICAL WORK / Parte III - Lavori Elettrici

FOR OFFICIAL USE ONLY 2

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

CNS ADDITION TO SIERRA ALTERNATE ARM-DEARM PAD

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 17-1009 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

NEW ELECTRICAL CABLEDUCT FOR BOUNDARY LIGHTING

FIXTURES

Nuovo cavidotto elettrico per elelemti illuminanti perimetrali

IT. No.

Art. n.

1 Lm/Ml

NEW 6kV CABLES

Nuovi cavi da 6 kV

IT. No.

Art. n.

2 Lm/Ml

NEW FLUSH BOUNDARY LIGHTING FIXTURE

Nuovo corpoilluminante perimetrale a incasso

IT. No.

Art. n.

3 Ea/No

RELOCATION OF HOLDING POSITION SIGN

Riposizionamento segnale di arresto

IT. No.

Art. n.

4 Ea/No

GROUND SYSTEM

impianto di terra

IT. No.

Art. n.

5 Ls/Ac

ELECTRICAL SYSTEMS TESTS

Collaudo Impianti Elettrici

IT. No.

Art. n.

6 Ls/Ac

TOTAL PART III - Totale Parte III

-$ -$ -$ -$ OR US DOLLARS (RATE 1$ = 0.9329€)

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - CIVIL WORK

PART III - ELECTRICAL WORK

FOR OFFICIAL USE ONLY 3