WO75487_Technical_Specifications.pdf
PDF 2 MB Posted
- Solicitation number
- FA568217R0063
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA568217R0063_00001.pdf | ||
| FA568217R0063.pdf | ||
| Applicable_Sects_Master_Technical_Specifications.pdf | ||
| 1704_100__CnstCostEstimate.xlsx | XLSX spreadsheet | |
| WO75487_Drawings.pdf | ||
| ADDITIONAL_REQUIREMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared and Submitted by:
Architecture, Engineering and Consulting Services
SO.IN.CI. S.r.l.
Via di Sacco Pastore n. 4 - Rome, Italy
Tel. +39.06.97848041 fax +39.06.97848175 E-mail: design@soinci.it
31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON
31st CES/CENM PROJECT MANAGEMENT ELEMENT
PROJECT WO 75487
MXG CONSOLIDATED CARPET REPLACEMENT
AREA F, AVIANO A.B., ITALY
TECHNICAL SPECIFICATIONS
FINAL SUBMITTAL (100%)
Date: August 2017
A/E CONTRACT No.:
WO 75487
INDEX
SECTION PAGE No.
AC1 - SCOPE OF PROJECT AND APPLICABLE CONDITIONS 1-7
AF FORM 66 - SCHEDULE OF MATERIAL SUBMITTALS 8-9
REVISED MASTER SPECIFICATIONS 10-18
SCHEDULE OF WORK ITEMS 19-24
WO 75487 1
SECTION AC1
SCOPE OF PROJECT AND APPLICABLE CONDITIONS
AC1-01 SCOPE OF PROJECT: The scope of this project “MXG CONSOLIDATED CARPET
REPLACEMENT” is to consolidate several work orders within MXG in different buildings located in Area F of Aviano Air Base.
It is required to remove the existing carpet flooring and replace it with new ceramic tiles flooring in the rooms of the facilities listed below throughout the Maintenance Complex:
Building 1360: Rooms 10 and 12
Building 904: Rooms 43, 44, 45, 46, 47, 48, 50, 56 and the hallway outside room 43
Building 1100: Rooms 3 and 9
Building 1173: Rooms 101, 102, 103, 104, 105, 106, 107, 108, 110, 111, 112, 115, 116, 117 and 118
Building 1445: Rooms 101, 102, 103, 105, 106, 107, 108, 109, 110, 111, 113, 116, 117, 118, 119, 122, 123, 124, 125, 126, 127, 128, 130, 131 and
Building 1227: Rooms 1
Building 1237: Rooms 101, 102, 103, 105, 106, 107, 111, 113, 117, 120, 121, 122, 130, 132, 133 and 135
SO.IN.CI performed a site survey and other investigations needed to clearly determine the existing conditions for a base of design.
Work to be performed includes but are not limited to the following items:
a. Civil Works
- Not applicable.
b. Architectural Work
- Moving all the existing pieces of furniture out of each room, number and temporarily store them in a dedicated empty space inside the building as indicated by the Contracting Officer
- Removal of existing perimetral floor base in rooms with carpet
- Removal of existing carpet flooring and glue layer underneath
- Cleaning of existing floor slab from dust and dirt
- Provision and installation of new ceramic tiles floor
- Provision and installation of new perimetral ceramic floor base
- Provision and installation of new metal transition strip at doors between new and existing pavement
- Moving the existing pieces of furniture back to the rooms where they belong following the numbering system and as directed by the
Contracting Officer
WO 75487 2
c. Mechanical Work
- Not applicable.
d. Electrical Work
- Not applicable.
AC1-02 TECHNICAL SPECIFICATION: The following sections of the Master
Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated November 2005 and applicable modifications, shall be applicable to the present project, together with the List of Work Items to be performed.
See Paragraphs AC1-23 and AC1-24 for applicable specifications.
AC1-03 SUBMITTAL OF MATERIALS: In accordance with Paragraph 2.5 of the technical specification No. 01100/R, entitled “GENERAL CONDITIONS” of the
Master Specifications, the materials listed in AF Form 66 shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer’s Technical Representative.
The Contractor shall provide, for all the materials that will be furnished and installed, a written certification, completed with catalog data from which shall be clear the total absence of toxic-noxious materials.
The number of copies will be as required on AF Form 66.
AC1-04 CONSTRUCTION AREA SCREENING: All construction sites and material storage areas shall be securely fenced around the entire perimeter within an area defined by the Contracting Officer’s Technical Representative.
Bilingual signs, "VIETATO L'INGRESSO - LAVORI IN CORSO / WORK AREA - NO
ENTRY" shall be placed at the work area entry and along each side of the fencing. Fence type, height, and screening color should also be specified by the Base Civil Engineering (BCE). Fencing shall be completely secured at top and bottom to prevent access. Fences shall be screened with opaque screening material to prevent visibility inside the fenced area. Fences and screens shall be adequately staked and/or anchored to prevent blowing over during high wind conditions. Contractor shall not start installation of area screening until approved, in writing, by BCE. Contractor shall submit photos or samples of the screening material for approval by BCE.
The Contractor shall replace or repair in a timely manner, as determined by
BCE, all fences and screening sections that have damage or develop unsightly rips or holes. At the end of the work or when exterior work requires it, temporary fencing shall be removed.
Night warning lights shall be installed to illuminate the work area, from sunset to dawn.
AC1-05 PROJECT SIGN: The Contractor shall furnish a project sign on site in accordance with Section 01101. The sign shall be made of a durable material and maintained in good condition. Lettering is to be white gloss, exterior-type enamel. The sign and posts shall be given one prime coat and two finish coats of dark brown gloss exterior enamel paint. The sign shall be erected at the designated location and shall be maintained in good condition by the Contractor until completion of the contract. The sign shall remain the property of the Contractor and shall be removed from the site upon final inspection and acceptance of the facility. Contractor identification and logo shall be allowed only on this sign and nowhere else
WO 75487 3
on the exterior of the job site, with the exception of company vehicles.
There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit sign proposal to CE for approval.
AC1-06 JOB SITE MOBILIZATION: The Contractor shall submit a proposal to
BCE diagramming their construction site and all material storage areas in locations separate from a construction site. The Contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution can not begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the Contractor and shall be coordinated through BCE.
Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.
AC1-07 SAFETY: Contractor shall provide barricades, traffic control signs and construction safety signs that meet installation standards and comply with all applicable laws. Actual location, size and final arrangement of these items shall be discussed and approved by the BCE prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current host nation requirements
(D.M. 81/2008 and subsequent amendments and additions) and the U.S. Army
Corps of Engineers Safety and Health Requirements Manual EM 385-1-1.
AC1-08 HAZMAT/HAZWASTE HOUSEKEEPING: Prior to bringing any hazardous material into the base, the Contractor must contact BCE to coordinate the storage and handling of all hazardous materials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.
a. Hazardous materials: The Contractor shall identify all hazardous materials required for completion of the project.
b. Material Safety Data Sheets: The Contractor shall furnish English language versions of the Material Safety Data Sheets (MSDS) of hazardous materials, chemical, toxic, and noxious, that will be used in the construction work, to 31st CES/CEV for approval and coordination through SEG and SGPB. The Contracting Officer will provide sample of the MSDS form to the Contractor.
c. Hazardous Waste Management Plan: The Contractor shall provide an hazardous waste management plan.
d. Chemicals Materials: The Contractor shall ensure that hazardous materials utilized during construction do not contain any chemicals listed as EPA 17 toxins. A list of the EPA 17 toxins con be obtained from the 31st CES/CEV office.
e. Liquid, flammable or toxic substances: Any liquid, flammable, or any other toxic substances that are required for the execution of the works, shall be kept in properly labeled, special containers.
Relative data (quantity, characteristics and location) shall be transmitted to 31st CES/CEF or 31st CES/CEV through the Director of
Works.
WO 75487 4
f. Asbestos Containing Materials: Asbestos containing materials will be encountered during demolition work. It shall be the responsibility of the Contractor to handle and dispose asbestos containing materials in the appropriate manner, as prescribed by
Italian Law, governing the handling of such materials, and to provide all required documentation and related coordination to obtain the necessary authorizations. Removal, handling and disposal of asbestos containing materials shall be in compliance with Section 13281 of this contract document.
AC1-09 PRESERVATION OF EXISTING CONDITIONS: The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized by BCE to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The
Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the Base.
AC1-10 WORK SITE CONDITIONS: Contractor shall perform a site survey at each building involved in this project to correctly evaluate the existing conditions and the amount of furniture to be moved out of the rooms. The work areas shall be made available to the Contractor as follows:
a. Building interior area: Prior the commencement of the work, government personnel will remove all computer hardware, documents and personal items from existing furniture to be moved.
b. Building Location: The buildings are not located in area that requires special access procedures. Delays may happen when the
Contractor will enter the restricted areas due to military operations or exercises. In this case the unproductive time will not be at the expense of the USA Government.
c. Administrative Containers: Containers required on site for administrative reasons (office space, conference space, break room) must be in like new condition and painted a color which coordinates with the base architectural plan and is approved by
BCE, unless it is hidden by the opaque fencing material.
Administrative containers in need of painting and / or repairs or that are in an unsightly condition will not be allowed at the project site. A nameplate, no greater than 0.5 meters X 0.5 meters in size, shall be displayed on the exterior of all trailers which lists the name of the Contractor’s company, 24-hour
Contractor’s point(s) of contact (POC) and telephone number where they can be reached.
d. Material Storage: Storage containers will be in like new condition, and painted a color which coordinates with the base architectural plan and is approved by BCE, if it is not hidden by the opaque fencing material. Contractor shall display a nameplate on the exterior of all storage units with the name of the
Contractor’s company, the Contractor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of materials at the work site is at the Contractor’s risk. The use
WO 75487 5
of private security guards on a job site shall be coordinated with base Security Forces and approved by the installation commander.
The Contractor shall not use any area(s) for material or equipment storage that has not been approved by BCE.
e. Loading and Unloading of Construction Materials and Equipment:
Unloading of materials will be allowed within the fenced work area. Contractor's personnel, vehicles and equipment must not obstruct access roads to other buildings.
Temporary parking of vehicles, for loading or unloading materials and equipment is permitted in the proximity of the work area;
unless such operations will obstruct traffic flow.
f. Housekeeping and Site Cleanup: At the end of each working day, the Contractor shall be responsible for cleaning the area surrounding the building involved in the work.
Since the adjacent buildings are used every day, the Contractor shall provide that the surrounding areas are kept constantly clean and accessible, completely safe, and that the facilities are not in any way aesthetically damaged, even temporarily.
Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials shall be placed in Contractor furnished containers. Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield.
AC1-11 AIRFIELD SAFETY TRAINING: Not Applicable.
AC1-12 PARKING: Contractor or Contractor’s employees, including subcontractors, shall obey all traffic laws on installation.
The Contractor shall park all vehicles, including heavy equipment vehicles, only in unobtrusive locations within the fence line of the construction site or laydown areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily observed by the public.
The Contractor shall not park outside the construction zone unless approved through BCE.
The Contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles.
AC1-13 ACCESS ROUTES: The Contractor shall provide a haul route plan for approval by BCE.
For road detour/closures the Contractor shall submit a written request to the Contracting Officer or his authorized representative for approval four weeks prior to his scheduled starting of work.
AC1-14 TRUCKING AND ROADS: Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered.
Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The Contractor is solely responsible for spillage from their vehicles and such spillage shall be cleaned up immediately. All roads shall be maintained free of debris at all times. The Contractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. Special consideration must be given to haul routes that cross active taxiways. No amount of debris at these locations shall
WO 75487 6
be tolerated. The Contractor shall sweep these areas continuously as long as material deliveries are being made.
AC1-15 NOISE CONTROL: The Contractor shall comply with all applicable country, local, and installation laws, ordinances, and regulations relative to noise control, to include applicable base quiet hours.
AC1-16 EXCAVATIONS: Not Applicable.
AC1-17 LAWN MAINTENANCE: Not Applicable.
AC1-18 LAWN ESTABLISHMENT: Not Applicable.
AC1-19 CONSTRUCTION SITE RESTORATION: All Contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences, that are erected during construction, shall be removed entirely after completion of project and within five (5) days of
Government acceptance of the project site. The Contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five
(5) days of Government acceptance of the project site.
AC1-20 PROCEDURES AND WORK PHASES: Contractor shall take into account that rooms not involved by the renovation works will be occupied by Base personnel during working hours.
Prior to starting any work the Contractor shall submit a Work Phases Plan for approval by the Contracting Officer. Simultaneous work at all facilities involved will be authorized.
AC1-21 SALVAGEABLE MATERIALS: In this contract are indicated materials and equipment to be removed, stored and subsequently reinstalled. It shall be the responsibility of the Contractor to remove salvageable items with maximum care to avoid any damages and to transport them to the storage areas as indicated by the Contracting Officer’s Technical Representative.
It shall be the responsibility of the Contractor to provide containers for material disposal and/or transportation of the salvageable items. All discarded materials shall be transported to an authorized public dump site by the Regional and National Regulation according to the typology of the related material. Transportation of discarded materials shall be extended, to an authorized dump site, even if the dump site is located outside the authority limits of the Aviano City Council Territory.
AC1-22 CONSTRUCTION DRAWINGS: The following Construction Drawings complement this Technical Specification and are an integral part of the project documents:
DRAWING # SHEET # DESCRIPTION
GENERAL
1 of 10 T-1 PROJECT TITLE SHEET AND MAPS
2 of 10 T-2 LIST OF DRAWINGS & LEGENDS
3 of 10 T-3 AREA F GENERAL SITE PLAN – BUILDINGS LOCATION
ARCHITECTURAL
4 of 10 A-1 BUILDING 1360 - EXISTING AND NEW CONDITIONS
5 of 10 A-2 BUILDING 904 - EXISTING AND NEW CONDITIONS
WO 75487 7
6 of 10 A-3 BUILDING 1100 - EXISTING AND NEW CONDITIONS
7 of 10 A-4 BUILDING 1173 - EXISTING AND NEW CONDITIONS
8 of 10 A-5 BUILDING 1445 - EXISTING AND NEW CONDITIONS
9 of 10 A-6 BUILDINGS 1227 AND 1237 - EXISTING AND NEW CONDITIONS
10 of 10 A-7 TYPICAL DETAILS
AC1-23 ADDITIONAL SPECIFICATIONS: Not Applicable.
AC1-24 REVISED MASTER SPECIFICATIONS: The following Revised Master
Specifications shall apply to this project
01100/R GENERAL CONDITIONS
01101/R PROJECT SIGN
02220/R SITE DEMOLITION
07920/R JOINT SEALANTS
09310/R CERAMIC TILE
AC1-25 ADDITIONAL NORMS AND STANDARDS: Not Applicable.
AC1-26 FINAL ACCEPTANCE TEST & CERTIFICATIONS:
a. Once issued NTP, Contractor is required to contact CEAOR
(telephone number 0434-305691) and schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization (DD1354 and category codes list CATCODE_LIST_2010 are available in engineering office during normal hour of operations). Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out;
b. All installed new floor ceramic tiles and floor base ceramic tiles shall have the required Italian Mark of Quality and shall conform to the applicable UNI EN ISO norms indicated in the Technical
Specifications and copies of relevant certificates shall be furnished to the Contracting Officer for each type of ceramic tile installed.
AFForm 66, OCT 89
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
WO 75487
PROJECT TITLE
MXG CONSOLIDATED CARPET REPLACEMENT
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
IN
C
O N
T R
A C
T
G
T E
T O
C
IV
IL
N
G
IN
E E
R
R
T U
R N
S U
S P
E N
S
U
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
L
F
A L
A P
P R
O V
LI
E N
U M
B
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
H
O P
D R
A W
M P
LE
LO
R
S E
LE
C
T
IO
M
N U
F A
C T
U R
E
’S
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
W
R R
A N
Y
T A
LO
G
D A
P
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
DATE CONTRACTOR
NOTIFIED REMARKS
APPROVED DIS-
APPROVED
PART IIa
ARCHITECTURAL WORK
Material Safety Data Sheets (MSDS)
1 Ceramic Floor Tiles Part IIa Item 1
3 3 3 3 3 3 30
2 Ceramic Floor Base Tiles Part IIa Item 2
3 3 3 3 3 3 30
3 Adhesive for Ceramic Tiles Part IIa Item 1 and 2
3 3 3 3 3 30
4 Joint Sealant Part IaI Item 1 and 2
3 3 3 3 3 3 30
5 Metal Transition Strip Part IIa Item 3
3 3 3 3 3 3 30
AFForm 66, OCT 89
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
WO 75487
PROJECT TITLE
MXG CONSOLIDATED CARPET REPLACEMENT
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
T E
R E
C E
IV
E
N
T R
A C
T
T E
T O
C
IV
IL
G
IN
E E
R
T U
R N
S U
S P
E N
U
B M
IT
T
A L
N U
M B
E
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
A P
P R
O V
LI
E N
U M
B
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
LI
A
N
H
O P
D R
A W
M P
LE
LO
R
S E
LE
C
T
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N U
F A
C T
U R
E
W
R R
A N
Y
T A
LO
G
D A
P
E R
A T
IN
G
IN
S
T R
U C
T
IO
R U
C T
U R
A L
C A
LC
U
LA
T
DATE CONTRACTOR
NOTIFIED REMARKS
APPROVED DIS-
APPROVED
SPECIFICATIONS INDEX
REVISED SPECIFICATIONS
SECTION 01100/R GENERAL CONDITIONS
SECTION 01101/R PROJECT SIGN
SECTION 02220/R SITE DEMOLITION
SECTION 07920/R JOINT SEALANTS
SECTION 09310/R CERAMIC TILE
REVISED SPECIFICATIONS
Section 01100/R 12
SECTION 01100/R
GENERAL CONDITIONS
PART 1 – APPLICABLE NORMS
Paragraph 1.1:
Delete:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system and electrical system.
Add:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system, fire protection system and electrical system.
Delete:
c. Legislative Decree No. 494 dated 14 August 1996 .
d. Legislative Decree No. 528 dated 19 November 1999.
Add:
c. Legislative Decree No. 81 dated 9 April 2008.
Paragraph 1.2.2
Replace “Law No. 46 dated 5 March 1990” with “ Ministerial Decree 37/2007
Paragraph 1.2.3
Delete:
a. Certificate of compliance for electrical systems in accordance with
CEI regulations and with D.P.R. No.547 dated 27 April 1955 on accident prevention.
Add:
a. Certificate of approval of the grounding and lightning protection systems, in accordance to CEI Norms and D.P.R. No. 462/01.
Revise Paragraph "3.2 UTILITY CUT-OFF" as follows:
Delete "ten (10) days" and insert "three (3) weeks" .
-- End of Section --
Section 01101/R 13
SECTION 01101/R
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the
Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site.
The sign shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. ERP Coordinates
Lettering of the sign will be as shown on the following sketch, and may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.
Section 01101/R 14
-- End of Section –-
Section 02220/R 15
SECTION 02220/R
SITE DEMOLITION
Add the following paragraph:
1.1.5 Electrical and Electronic Equipment Waste Disposal (RAEE)
Disposal of the Electrical and Electronic Equipment Waste (RAEE) shall be in compliance with Legislative Decree No. 151 dated 25 July 2005:
Accomplishment of the European Directive Relevant to the Electrical and
Electronic Equipment Waste.
3.1 EXISTING ITEMS TO BE REMOVED
Delete the following sentence: “The existing temporary metal building shall be dismantled and will remain Contractor’s property.”
Add the following sentence: “ The existing equipment to be saved will be indicated by the Contracting Officer’s Technical Representative:”
-- End of Section –-
Section 07920/R 16
SECTION 07920/R
JOINT SEALANTS
Add at the end of Paragraph 2.2 the following sentence:
"Other manufacturers meeting the requirements of this specification are acceptable.”
Section 09310/R 17
SECTION 09310/R
CERAMIC TILES
Paragraph 1.1 Applicable publications:
Delete:
UNI EN 87 (1992) Ceramic Floor and Wall Tiles -
Definitions, Classification, Characteristics and Marking.
UNI EN 101 (1992) Ceramic Tiles. Determination of
Scratch Hardness of Surface According to
Mohs’ Scale.
Add:
UNI EN ISO 9001 (2015) Quality management systems -
Requirements.
UNI EN ISO 12004-1 (2017) Adhesives for ceramic tiles - Part
1: Requirements, assessment and verification of constancy of performance, classification and marking
UNI EN ISO 12004-2 (2017) Adhesives for ceramic tiles - Part
2: Test methods
UNI EN ISO 10545-1 (2014) Ceramic tiles - Part 1: Sampling and basis for acceptance.
UNI EN ISO 10545-4 (2014) Ceramic tiles - Part 4:
Determination of modulus of rupture and breaking strength.
UNI EN ISO 10545-5 (2000) Ceramic tiles - Part 5:
Determination of impact resistance by measurement of coefficient of restitution
UNI EN ISO 10545-6 (2012) Ceramic tiles - Part 6:
Determination of resistance to deep abrasion for unglazed tiles
UNI EN ISO 10545-8 (2014) Ceramic tiles - Part 8:
Determination of linear thermal expansion
UNI EN ISO 10545-9 (2014) Ceramic tiles - Part 9:
Determination of resistance to thermal shock
UNI EN ISO 10545-10 (2000) Ceramic tiles - Part 10:
Determination of moisture expansion
UNI EN ISO 10545-13 (2017) Ceramic tiles - Part 13:
Determination of chemical resistance
Section 09310/R 18
UNI EN ISO 10545-15 (2000) Ceramic tiles - Part 15:
Determination of lead and cadmium given off by glazed tiles
UNI EN ISO 10545-16 (2012) Ceramic tiles - Part 16:
Determination of small color differences
Replace:
UNI EN ISO 10545-14 (2000) Ceramic tiles - Part 14:
Determination of resistance to stains
With:
UNI EN ISO 10545-14 (2015) Ceramic tiles - Part 14:
Determination of resistance to stains
Add the following sentence at the end of Paragraph 2.2:
"Other manufacturers meeting the requirements of this specification are acceptable.”
WO 75487 19
SCHEDULE OF WORK ITEMS
1. EACH ITEM OF THE SCHEDULE IS INCLUSIVE OF PROVISION AND
INSTALLATION OF MATERIALS AND EQUIPMENT, SCAFFOLDING,
TRANSPORTATION TO DUMP OR STORAGE OF DEMOLISHED AND/OR
REMOVED MATERIALS, IN ACCORDANCE WITH CONTRACTING OFFICER'S
INSTRUCTIONS AND ALL FINISHING WORK REQUIRED TO MAKE EACH
ITEM COMPLETE IN A WORKMANLIKE MANNER.
2. ALL THE QUANTITIES THAT ARE INDICATED OR SUCCESSIVELY ADDED,
ARE ESTIMATES. THEREFORE THE GOVERNMENT SHALL BE NOT HELD
RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES.
THE CONTRACT REQUIRES A COMPLETED PROJECT ON A LUMP SUM
BASIS.
IT IS THEREFORE THE RESPONSIBILITY OF THE CONTRACTOR TO
CALCULATE, FORESEE AND PERFORM ALL QUANTITIES AND WORK
NECESSARY EVEN IF NOT MENTIONED IN THE SPECIFICATIONS BUT
INCLUDED IN THE DRAWINGS OR MANIFESTLY NECESSARY TO DELIVER
A COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.
WO 75487 20
TABLE OF CONTENTS
PART I – DEMOLITIONS, REMOVALS AND EXCAVATIONS 21
Ia – Architectural Demolitions 21
PART II – ARCHITECTURAL, STRUCTURAL AND CIVIL WORK 23
IIa - Architectural Work 23
WO 75487 21
SCHEDULE OF WORK ITEMS
PART I – DEMOLITIONS, REMOVALS AND EXCAVATIONS
Ia – Architectural Demolitions
1. Moving outside the rooms of all the existing pieces of furniture emptied by the Government personnel. All the moved furniture will be numbered and stacked in a appropriate space inside the building as directed by the Contracting Officer.
Item includes:
- Moving of all the existing furniture to an authorized space as directed by Contracting Officer’s Technical Representative.
- Eventual disassembly of existing pieces of furniture that cannot exit the room;
- All operations necessary for the workmanlike execution of the work.
Bldg. 1360 – Lump Sum
Bldg. 904 - Lump Sum Bldg. 1100 – Lump Sum
Bldg. 1173 – Lump Sum
Bldg. 1445 – Lump Sum
Bldg. 1237 – Lump Sum
Bldg. 1227 – Lump Sum
2. Removal of existing room floor perimetral baseboard, as shown on drawings including the metal transition strip at door where existing.
Item includes:
- Removal of the existing baseboard;
- Removal of metal transition strip at door where existing;
- Loading and transportation to authorized public dump area of all resulting materials including the dump fees.
- All operations necessary for the workmanlike execution of the work.
Bldg. 1360 – 77.20 Lm
Bldg. 904 – 249.00 Lm
Bldg. 1100 – 33.44 Lm
Bldg. 1173 – 269.50 Lm
Bldg. 1445 – 573.33 Lm
Bldg. 1237 – 248.92 Lm
Bldg. 1227 – 22.46 Lm
WO 75487 22
3. Removal of existing carpet, as shown on drawings.
Item includes:
- Removal of the existing carpet;
- Removal of existing layer of glue;
- Removal of dirt and dust;
- Loading and transportation to authorized public dump area of all materials not to be reused, as directed by Contracting
Officer’s Technical Representative.
- All operations necessary for the workmanlike execution of the work.
Bldg. 1360 – 99.50 Sqm
Bldg. 904 – 317.20 Sqm
Bldg. 1100 – 32.20 Sqm
Bldg. 1173 – 284.60 Sqm
Bldg. 1445 – 821.65 Sqm
Bldg. 1237 – 261.91 Sqm
Bldg. 1227 – 30.12 Sqm
WO 75487 23
PART II – ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
IIa - Architectural Work
1. Provision and installation of new ceramic tiles, as shown on drawings, including the eventual modification of the existing doors for their proper opening and the adjustment to the new floor of eventual existing systems devices on ground.
Item includes:
- Provision and installation of new ceramic tiles by means of appropriate adhesive indicated by the tiles manufacturer, including plastic spacers between tiles, filling of tiles joints between tiles and the final cleaning of the floor;
- All operations necessary for the workmanlike execution of the work.
Bldg. 1360 – 99.50 Sqm
Bldg. 904 – 317.20 Sqm
Bldg. 1100 – 32.20 Sqm
Bldg. 1173 – 284.60 Sqm
Bldg. 1445 – 821.65 Sqm
Bldg. 1237 – 261.91 Sqm
Bldg. 1227 – 30.12 Sqm
2. Provision and installation of new ceramic floor baseboard, as shown on drawings.
Item includes:
- Installation of new ceramic floor base by means of appropriate adhesive indicated by the tiles manufacturer, including filling of joints, base tiles final cleaning and the eventual touch-up of the wall painting over the ceramic floor base tiles;
- All operations necessary for the workmanlike execution of the work.
Bldg. 1360 – 77.20 Lm
Bldg. 904 – 249.00 Lm
Bldg. 1100 – 33.44 Lm
Bldg. 1173 – 269.50 Lm
Bldg. 1445 – 573.33 Lm
Bldg. 1237 – 248.92 Lm
Bldg. 1227 – 22.46 Lm
WO 75487 24
3. Provision and installation of new metal transition strip between existing and new floor, as shown on drawings, including the eventual modification of the existing doors for their proper opening.
Item includes:
- Installation of new metal transition strip;
- All operations necessary for the workmanlike execution of the work.
Bldg. 1360 – 4.70 Lm
Bldg. 904 – 17.10 Lm
Bldg. 1100 – 2.40 Lm
Bldg. 1173 – 11.20 Lm
Bldg. 1445 – 23.40 Lm
Bldg. 1237 – 15.30 Lm
Bldg. 1227 – 0.90 Lm
4. Moving of all the existing pieces of furniture back inside the rooms where they belong following the numbering system and as directed by the Contracting Officer.
Item includes:
- Moving of all the existing furniture back to the rooms as directed by Contracting Officer’s Technical Representative.
- Eventual reassembly of pieces of furniture previously disassembled
- All operations necessary for the workmanlike execution of the work.
Bldg. 1360 – Lump Sum
Bldg. 904 – Lump Sum
Bldg. 1100 – Lump Sum
Bldg. 1173 – Lump Sum
Bldg. 1445 – Lump Sum
Bldg. 1237 – Lump Sum
Bldg. 1227 – Lump Sum
File details come from the government source that posted it. Updated .