APPLICABLE SECTIONS OF MASTER TECHNICAL SPECIFICATIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA568217R0063_00001.pdf | ||
| FA568217R0063.pdf | ||
| 1704_100__CnstCostEstimate.xlsx | XLSX spreadsheet | |
| WO75487_Technical_Specifications.pdf | ||
| WO75487_Drawings.pdf | ||
| ADDITIONAL_REQUIREMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 01100 1
SECTION 01100
GENERAL CONDITIONS
PART 1 – APPLICABLE NORMS
1.1 The Italian norms for building works and the instructions of materials suppliers shall be strictly observed for the execution of the works. In addition the general safety regulations for construction and the Base regulation for traffic, accidents and fire fighting shall be observed as follows:
a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system and electrical system.
b. C.N.R.; ASTM; AASHTO norms – Aggregates, bitumen, bituminous mixtures and road works in general.
c. Legislative Decree No. 494 dated 14 August 1996.
d. Legislative Decree No. 528 dated 19 November 1999.
e. CEI norms in force at tender date.
f. UNEL norms in force at tender date.
g. ENPI norms in force at tender date.
h. NEC norms in force at tender date.
i. AFPM 91-210 Contract Safety.
j. AFI 91-202 Safety Program Management.
The manuals and regulations relative to paragraphs i and j, will be available for review at the Engineering Office, Bldg 407 of Aviano Air Base, during normal working hours, from Monday to Friday, from 0800 to 1700 hrs. Further clarifications regarding the type of materials and the work specified in the Schedule to Work items or indicated in the drawings, will be provided during the site survey scheduled prior to the submittal of proposal.
1.2 CERTIFICATION OF COMPLIANCE WITH ITALIAN LAWS
1.2.1 Static Load Testing
The Contractor shall comply with the pertinent articles of Italian Law
1086 dated 5 November 1971, and all subsequent revisions. The Contractor shall be fully responsible for construction, supervision, static load tests, final testing, and for all costs associated with this procedure.
Article 2 of Law 1086, as amended, requires the static load tests to be performed under the supervision of an engineer or architect registered on the National Professional Rolls of Italy for at least ten years (10).
Prior to performing the tests, submit to the Contracting Officer the names and certified credentials of proposed testing personnel, engineer(s) or architect(s) they propose to perform the static load testing.
2 Section 01100
1.2.2 Mechanical and Electrical Work Certifications
As a condition of final acceptance of the work, the Contractor shall submit to the Contracting Officer a certificate of compliance for all contract work certifying that all electrical and mechanical work complies with Law No. 46 dated 5 March 1990, and that the provided work is adequate and safe for the designated use.
1.2.3 Other Certifications
In addition to the certifications listed above, the Contractor shall provide all other certifications and testing required by Italian Law.
Such certifications may include but are not limited to the following:
a. Certificate of compliance for electrical systems in accordance with CEI regulations and with D.P.R. No.547 dated 27 April 1955 on accident prevention.
b. Certificate of compliance for heating systems above 100,000 kcal/hr in accordance with Italian Law No. 373 dated 30 April 1976.
c. Certificate of compliance for fire prevention systems in accordance with Ministerial Decrees dated 16 February 1982 and 8 March 1985.
d. Certificate for elevator systems test in accordance with Italian Law No. 1415 dated 24 October 1942.
PART 2 – MATERIALS
2.1 All materials shown on drawings and listed in the Schedule of Work
Item or anyhow necessary for the accomplishment of project will be furnished and installed by the Contractor except those shown on drawings which will be furnished and installed by the U.S.A. Government and installed by the Contractor.
2.2 DEMOLITION AND INTERVENTION WORK ON EXISTING STRUCTURES
During possible partial demolition or intervention operation of bearing structures the Contractor shall provide for the shoring of existing structures, for the safety of personnel and building, being responsible for any accident and/or damage. Shoring will be performed in a way to assure the integral conservation of structures not to be demolished or modified. Shoring shall be inspected by Contracting Officer’s Technical Representative prior to proceeding with any demolition work of structural elements.
2.3 REMOVED MATERIALS
The materials to be removed, (specified on drawings and/or on the Schedule of Work Items) shall be handled as follows:
2.3.1 Unsalvageable materials
Shall be transported to public dump in accordance with Italian communal norms in force. The Contracting Officer’s Technical Representative shall determine which materials are unusable. Under no circumstances will the Contractor attempt to sell or otherwise use such material unless and until he first obtains, the necessary permits, licenses etc. from the
Section 01100 3
Italian Government Officials and will hold the U.S. Government free and harmless from his failure to do so.
2.3.2 Salvageable materials
Shall be loaded, unloaded and stacked at a warehouse of Aviano Air Base.
The Contracting Officer’s Technical Representative shall determine which material is salvageable and the storage location. Maximum distance will be 15 km.
2.3.3 Materials to be reused in the project
Shall be removed with care and stored by the Contractor on site, after inspection of operating state of such fixtures which will be done jointly with the Contracting Officer’s Technical Representative. The Contractor shall be fully responsible for preservation of such fixtures and before their installation, in the location he shall provide for cleaning and rehabilitation work.
2.4 SELECTION OF EQUIPMENT, MATERIALS AND COLORS
The Contracting Officer’s Technical Representative will select equipment, materials and colors from among the charts and factory samples which will be submitted by the Contractor and approved by the Government in accordance with the indications of the project documents. It will be the Contracting Officer’s Technical Representative’s option to request all samples and catalogues of materials to be incorporated in the project to ensure the satisfactory and proper completion of the work. All samples shall be returned to Contractor.
2.5 SUBMITTALS
This paragraph applies only to those items not subject to the “brand name or equal” provision of the contract and listed in AF Form 3052. Within 15 days from the date of notice to proceed, or in accordance with the prescriptions given by the Contracting Officer, the Contractor shall submit Contracting Officer’s Technical Representative’s approval the data requested by the project documents and listed in the paragraph entitled “Material Approval” in order to ascertain that the material corresponds to the technical characteristics of the project. The submittals consisting of AF Form 3000, and catalog contracts (4 copies), beside the samples, will be in English or Italian with the English translation attached. The list preparation shall be coordinated with the work schedule keeping in mind that the Government needs at least 15 days for the approval. Every disapproved item shall be resubmitted following the same procedure. A copy of the AF Form 3000 and relative attachments will be returned to the Contractor. No work will be started prior to obtaining the approval for the proposed material and equipment. The approval of submittals does not relieve the Contractor of responsibility for proper application and installation of the items, of other evident or hidden defects. Shop drawings, for electric equipment shall include construction drawings, diagrams and schematics for power circuits and control circuits, and component reference list.
2.6 USE OF BRAND NAMES IN SPECIFICATIONS
Unless otherwise specifically provided on this contract, reference to any equipment, material article or patented process by trade name, make or cat number shall be regarded as establishing a standard of quality and
4 Section 01100 shall not be construed as limiting competition, and the Contractor may, at his option use any equipment, material, article, or process which, in the judgment of the Contracting Officer’s Technical Representative, is equal to that named. The Contractor shall furnish to the Contracting Officer’s Technical Representative all required data and samples as may be called for the these technical provisions or which the Contracting Officer’s Technical Representative determines necessary for approval prior to use of the items during work performance.
2.7 “EQUIVALENT” ITEMS PROPOSED BY CONTRACTOR
If the Contractor intends to propose “brand names” different than the ones specified by U.S. Government, he will clearly indicate the “equivalent” proposed item, the manufacturer, type, catalog No., etc. in the List of Equivalent Proposed Items attached to AF Form 3052 which shall be returned to the Government together with the proposal. Each equivalent item listed shall be supported by the relative technical documentation (catalog cuts, certificates, technical descriptions, calculations, etc.) in order to prove the equivalency of the technical characteristics of the product listed in the project document. Such documentation shall also be attached to the proposal.
2.8 INFORMATION DATA
Prior to work completion date and if expressly requested by project documents will submit the following information data in English and Italian:
2.8.1 Manufacturer’s literature
Catalog extracts for all items (materials and equipment) furnished, in accordance with project documents.
2.8.2 Parts List
List of furnished items, in accordance with project documents:
a. Item description
b. Current unit price
c. Reference to manufacturing Firm
2.8.3 Manufacturer’s Address
List of materials and equipment suppliers, in accordance with project documents.
a. Firm Name
b. Complete address and telephone number
c. Reference to parts list
2.8.4 Operation and Maintenance Manuals
At work completion date, the Contractor shall submit three (3) copies of operation and maintenance manuals of all equipment installed.
Section 01100 5
2.8.5 Operation Test Reports
In accordance with project documents, prior to work completion date, the
Contractor shall perform balancing and testing of each system installed and will submit three (3) copies of testing report containing recorded data of readings performed during tests.
PART 3 – SITE CONDITIONS
3.1 WORKING HOURS
Normal working hours authorized on base, are from 0800 to 1700 hrs., Monday through Friday. Any working hours different from the authorized hours must be previously approved by the Contracting Officer.
3.2 UTILITY CUT-OFF
When interruption of existing utilities is deemed necessary for the installation of the lines or equipment, the Contractor shall submit a written request, to the Contracting Officer of his authorized representative for approval ten (10) days prior to his scheduled starting of work. For the electrical cut-off the request shall be submitted (10) ten days prior the scheduled starting of work. Such interruption shall not be started before receipt of the approved request, nor shall interruptions request be submitted at the end of the week (from Friday through Sunday). The request shall state the duration of interruptions and the description of work to be done.
3.3 STORAGE SHED
It will be Contractor’s option to provide one or more storage sheds to store materials and work tools. The available area, for the assembly of such shed, shall be indicated by the designated representative of the Contracting Officer’s Technical Representative. At work completion the shed shall be disassembled and the area shall be restored to its original condition.
3.4 AIRFIELD SAFETY TRAINING
The Contractor shall contact Airfield Management to receive flightline driver and airfield safety training prior to start of any work beginning on the flightline.
3.5 TRANSPORTATION OF PERSONNEL AND MATERIALS
It will be the Contractor’s responsibility to transport the personnel to and from the job site and to load, transport, unload and place all supplies, materials and equipment involved in this contract.
3.6 UTILITIES
Electric power, existing grounding system and water available in the area, will be made available to the Contractor by the U.S. Government.
Connections and disconnections will be at Contractor’s expense and utilities are to be restored to their original condition at no extra cost to the Government. All damages caused, if any, to the existing utilities will be repaired immediately at Contractor’s expenses, also in case that such repairs are made by Government’s personnel and as directed by the
6 Section 01100
Contracting Officer’s Technical Representative. Before starting the works, the Contracting Officer will indicate the point wherefrom water and electric power will be taken. The Contractor will be entitled to provide for himself, if desired, a generating set, and his own expense.
The electrical characteristics of available power will be indicated in project documents.
3.7 TOILET FACILITY
The toilet facilities available in the vicinity of site of work may be used by Contractor’s personnel provided there are no instructions to the contrary in the project documents.
3.8 EXCAVATIONS
The Contractor shall initiate no excavation work prior to receiving an approved AF Form 103. This form will be prepared by U.S. Government personnel.
PART 4 - LABOR
All installation and construction operations, calibrations and tests during service, etc, shall be performed in a workmanlike manner by skilled tradesmen being qualified to perform the most difficult operations pertaining to their respective craft. The use of common labor for operations normally assigned to skilled tradesmen will not be accepted.
PART 5 – DEFINITIONS
As used throughout this master specification set the terminologies used such as: project, drawings, project documents and documents mean the additional specifications. Schedule of Work Items, Drawings and other documents which compose the specific individual project to be performed and for which a proposal is solicited separately.
PART 6 - ORDER OF PRECEDENCE
In case of conflict between this master specification set and the individual project documents, the difference shall be resolved by giving precedence to the individual project documents.
-- End of Section --
Section 01101 1
SECTION 01101
PROJECT SIGN
PART 1 - PROJECT SIGN
1.1 Scope
Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.
PART 2 - GENERAL
The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site. The sign shall be 120 cm wide x 80 cm high and shall be constructed of a material suitable to withstand exposure to inclement weather for the duration of the contract, and must not show evidence of warping, cracking, or other defects. The sign shall have a blue background with white lettering, and shall contain the following information in English:
a. Project No.
b. Project description
c. Constructed under Supervision of Base Civil Engineering
d. Contracted by 31st Contracting Squadron
e. Contractor
f. Design Engineer
g. Inspector
h. Contract Management: 31 CONS Construction Flight
i. ERP Coord
Lettering of the sign will be as shown on the following sketch, and may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.
2 Section 01101
Section 02220 1
SECTION 02220
SITE DEMOLITION
PART 1 - GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
1.1.1 National Fire Protection Association (NFPA):
NFPA No. 241 (2000)Standard for Safeguarding Construction, Alterations, and Demolition Operations.
1.1.2 Safety at Work Places:
Law Decree 14 August 1996 “Construction Site Regulations”, Supplements and Amendments.
1.1.3 Trash Disposal:
Law Decree 15 November 1993.
Law Decree 5 February 1997 No. 22 (Decreto Ronchi).
Law Decree 8 November 1997 No. 389.
Decree 1 April 1998 No. 145.
Decree 28 April 1998 No.406, Environmental Department.
Decree 24 June 1998 No. 261.
Circular 4 August 1998 No. GAB/DEC/812/98.
1.1.4 Asbestos Material Treatment:
Law 27.03.1992, No. 257 Norms concerning the discontinuance of the use of the asbestos.
Ministerial Decree 06.09.1994 Norm and technical methodologies for compliance with Law No. 257, dated 27 March 1992, Art. 6, comma 3, and Art. 12, comma 2 concerning the concerning the discontinuance of the use of the asbestos.
Legislative Decree 10.09.1994, No. 626 Implementation of the CEE requirements for improving safety and health of workers on work site.
Legislative Decree 17.03.1995, No. 114 Implementation of the requirements 87/217/CEE concerning the prevention and reduction of the environment pollution due to the asbestos.
Circular No. 7 Explanatory circular of the Ministerial dated 12.04.1995 Decree dated 06.09.1994.
Ministerial Decree 14.05.1996 Norms and technical methodologies for reclamation actions as stated by Law No.
2 Section 02220
257, dated 27 March 1992, Art.5, comma 1, letter f) concerning: “Norms for the discontinuance of the use of the asbestos”.
Legislative Decree 14.08.1996, No. 494 Implementation of the requirements 92/57/CEE concerning the minimum safety and health requirements to be accomplished in temporary or mobile work sites.
Legislative Decree 05.02.1997, No. 22 Implementation of the requirements 1/156/CEE regarding waste, 91/689/CEE regarding hazardous waste and 94/62/CEE regarding packaging and waste packaging.
Ministerial Decree 12.02.1997 Criteria for homologation of products replacing the asbestos.
Ministerial Decree 26.03.1998 List including the name of the firms and list of the materials replacing the asbestos that have obtained the homologation.
Decree 20.08.1999 Increase of the norms and technical methodologies for reclamation actions as stated by Law No. 257, dated 27 March 1992, Art.5, comma 1, letter f, concerning: “Norms for the discontinuance of the use of the asbestos”.
Deliberation 14.03.2001 Modification to the deliberation dated 1
February 2000, protocol No. 002/CN/ALBO, concerning “Criteria to be enrolled in the Albo Categoria 10: Reclamation of asbestos containing goods” (Deliberation No.
004/CN/Albo).
Decree 25.07.2001 Rectification of Decree 20 August 1999 concerning “Increase of the norms and technical methodologies for reclamation actions as stated by Law No. 257, dated 27 March 1992, Art.5, comma 1, letter f) concerning norms for the discontinuance of the use of the asbestos”.
Decree of the Council of Regulations for the determination of the Ministers President model and the procedures to keep the 10.12.2002, No. 308 register in case of mesothelioma due to the asbestos according to Legislative Decree No. 277, dated 15 August 1991, Art.36, comma 3.
Ministerial Decree 13.03.2003 Criteria of admissibility of the wastes in the dump site.
REGIONAL NORMS AND LAWS
Section 02220 3
Regional Law Implementation of the national laws dated 03.09.1996, No. 039 concerning the discontinuance of the use of the asbestos.
Regional Law Directions concerning environment, dated 09.11.1998, No. 013 territory, economic and productive activities, health and social care, education and culture, state employment, state real property, regional financial companies, intervention on support of the Middle Europe Enterprise, treatment of personal data, and reconstruction of devastated by earthquake areas.
Regional Law Directions concerning surveillance, dated 12.09.2001, No. 022 prevention, and information of situation with asbestos danger and correlated regional interventions.
1.2 SUBMITTALS
Statements: A demolition plan giving the procedures proposed for the accomplishment of salvage, demolition and removal work shall be submitted to the Contracting Officer’s Technical Representative and approved before work is started. The procedures shall provide for careful removal and disposition of materials specified to be salvaged and coordination with other work in progress. The procedures shall include a detailed description of the methods and equipment to be used for each operation, the sequence of operations and in case of demolition of adherence built constructions or in case of partial demolitions they shall also include the calculation of provisional structures which are to bear possible walling and, if the size of the work requires it, also a geotechnical report about the adjoining buildings.
1.3 GENERAL REQUIREMENTS
The work includes the demolition and/or the removal of all construction indicated or specified. All materials resulting from demolition work, except as indicated or specified otherwise, shall become the property of the Contractor and shall be removed from the limits of Government property. Trash and debris shall be removed from the station daily, unless otherwise directed, and shall not be allowed to accumulate on the site. Such materials which, in the opinion of the Contracting Officer’s Technical Representative, cannot practically be removed daily shall be neatly stored on the site where directed by the Contracting Officer.
1.4 ASBESTOS
Asbestos containing materials shall be treated in compliance with the
Specification 13281 “Engineering Control of Asbestos Containing Materials” of this Contract Document.
1.5 DUST AND DEBRIS CONTROL
Dust resulting from salvage, demolition and removal work shall be controlled to prevent the spread of dust and avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it may result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.
4 Section 02220
1.6 PROTECTION
1.6.1 Protection of Existing Work from Damage
Protect existing work which is to remain in place, to be reused, or to remain on the property of the Government by temporary covers, shoring, bracing and supports. Repair such items which are damaged during performance of the work or replace with new. Do not overload structural elements. Provide new supports or reinforcement for existing construction which is weakened by demolition or removal work.
1.6.2 Weather Protection
The interior of the building and all materials and equipment shall be protected from the weather at all times. Where removal of existing roofing is necessary to accomplish work, materials and workmen necessary to provide adequate and approved temporary covering of exposed areas shall be kept in readiness at all times. Temporary coverings shall be attended as necessary to insure their effectiveness and prevent displacement.
1.6.3 Protection of the Trees and Shrubs
Protect trees and shrubs within the project site that might be damaged during demolition, and that are indicated to be left in place. Restore trees scarred or damaged by Contractor equipment or operations to a satisfactory condition or replace them as determined by the Contracting Officer’s Technical Representative.
1.6.4 Facilities
Protect all electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas and temporary services or connections for electrical and mechanical utilities.
1.6.5 Protection of Personnel
Where pedestrians’ and drivers’ safety is endangered in the area of work removal, barricades for traffic shall be used and advance notice shall be given to the Contracting Officer prior to beginning any such work.
1.7 USE OF EXPLOSIVES
Use of explosives will not be permitted.
1.8 BURNING
Burning will not be permitted.
1.9 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair items to be relocated which are damaged or replace damaged items with new undamaged items as approved by the Contracting Officer’s Technical Representative.
Section 02220 5
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 EXISTING ITEMS TO BE REMOVED
The existing temporary metal building shall be dismantled and will remain
Contractor’s property.
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
Title to all materials and equipment to be removed, except as specified otherwise, is vested in the Contractor upon receipt of notice to proceed.
The Government will not be responsible for the condition, loss or damage to such property after notice to proceed.
3.2.2 Material to be salvaged
Salvaged material shall be stored as directed by the Contracting Officer.
3.2.3 Reuse of materials and equipment
Carefully remove and store materials indicated to be reused or relocated to prevent damage and reinstall as the work progresses.
3.3 CLEAN-UP
3.3.1 Debris and Rubbish Control
Debris and rubbish shall be removed each day and transported in a manner that will prevent spillage on streets or adjacent areas. Clean up spillage from streets and adjacent areas.
3.3.2 Regulations
National, Provincial, and local regulations regarding hauling and disposal shall be complied with.
-- End of Section –-
Section 07920 1
SECTION 07920
JOINT SEALANTS
1.1 REFERENCES
The publications listed below form a part of this specification to the
ITALIAN/EUROPEAN HARMONIZATION STANDARDS (UNI EN)(UNI ENV)(CEI EN)(UNI EN
ISO)(UNI ISO)
UNI EN 26927 (1992) Building Construction - Jointing.
Products - Sealants-Vocabulary.
1.2 SUBMITTALS
1.2.1 Manufacturer's Data Catalog
Clearly mark data to identify material type to be provided. Submit complete descriptive data for:
a. Sealant
b. Primer
c. Backstop material
d. Sealant tape
1.2.2 Instructions
Before installation submit manufacturer's printed installation instructions including application instructions and precautions, shelf life, recommended cleaning solvents and curing time for the following:
a. Sealant
b. Primer
c. Backstop material
d. Sealant tape
1.3 ENVIRONMENTAL CONDITIONS
The ambient temperature shall be within the limits of 5 to 40 degrees
Centigrade when sealant is applied.
1.4 DELIVERY AND STORAGE
Deliver materials to the job site in unopened manufacturer's external shipping containers, with brand names, date of manufacture, color and material designation clearly marked thereon. Elastomeric sealant
2 Section 07920 containers shall be labeled to identify type, class, grade, and use.
Carefully handle and store materials to prevent inclusion of foreign materials or subjection to sustained temperatures exceeding 40 degrees Centigrade or less than 5 degrees Centigrade.
1.4.1 Colors
Submit one sample of each color for each sealant and caulking type to verify that products match the colors indicated. Where colors are not indicated, submit not less than three different samples of manufacturer's standard colors for selection by the Contracting Officer’s Technical Representative. Painting of placed sealant is not allowed.
1.4.2 Sample Joints
Before caulking and sealant work is started, provide a sample of each type of finished joint where directed. The sample shall show the workmanship, bond, and color of caulking or sealant material. The workmanship, bond, and color of sealant or caulking work throughout the project shall match that of the approved sample joints.
1.4.3 Definitions and Abbreviations
Terms used in this specification are defined in UNI EN 26927.
a. Type S: Single-component
b. Type M: Multicomponent
c. Grade P: Pourable or self-leveling sealant for horizontal applications
d. Grade NS: Nonsag for vertical applications
e. Class 25: Withstands increase and decrease of at least 25 percent of joint width
f. Class 12.5: Withstands increase and decrease of at least 12.5 percent of joint width
g. Use T: Pedestrian and vehicular traffic areas such as walkways, plazas, decks, and parking garages
h. Use NT: Nontraffic areas, horizontal and vertical surfaces
i. Use M: Meets this specification when tested on mortar
j. Use G: Meets this specification when tested on glass
k. Use A: Meets this specification when tested on aluminum
l. Use O: Meets this specification when tested on substrates other than above. Specify substrate types in project specification.
PART 2 - PRODUCTS
2.1 SEALANT
Section 07920 3
Provide sealant that has been tested and found suitable for the substrates to which it will be applied.
2.1.1 Interior Sealant
Interior sealant shall be acrylic latex base compound. Joint location and sealant color shall be as follows:
LOCATION COLOR
a. Small voids between walls or partitions Match adjacent material and adjacent casework, shelving, door frames, built-in or surface-mounted equipment and fixtures, and similar items.
b. Perimeter of frames at doors, windows, and Match adjacent material access panels which adjoin exposed interior concrete surfaces.
c. Joints of interior concrete walls and As selected partitions which adjoin columns, pilasters, concrete walls, and exterior walls unless otherwise detailed.
d. Interior locations, not otherwise indicated As selected or specified, where small voids exist between materials specified to be painted such as any wall penetration of pipe, conduits, pipe sleeves.
e. Around the perimeter of all wall-mounted Match adjacent material and floor-mounted plumbing fixtures, shower stalls and intersecting surfaces of ceramic tile
2.1.2 Exterior Sealant
Shall be single component butyl rubber base sealing compound or multi-component polyurethane sealing compound. Joint location and sealant color shall be as follows:
a. Joints and recesses formed where frames Match metal color and subsills of windows, doors, louvers adjoin concrete or metal frames.
Use sealant at both exterior and interior surfaces of exterior wall penetrations.
b. Joints in wash surfaces of metal Match metal color counterflashing.
c. Expansion and Control joints. As selected
d. Voids or gaps occasioned by piping Match adjacent penetrations through wall and voids material where items pass penetrated through exterior walls.
4 Section 07920
e. Prefabricated concrete copings As selected and eaves
f. Metal-to-metal joints where sealant Match metal color is indicated or specified.
g. Joints between ends of gravel stops, Match metal color fascias, coping, and adjacent walls.
2.1.2.1 Vertical Joints
For joints (8 mm to 35 mm) in vertical surfaces, provide an elastic (low modulus of elasticity) polyurethane, Type S or M, Grade NS, Class 25, use
NT.
2.1.2.2 Horizontal Joints
For joints in horizontal surfaces, provide an elastic (0.15 N/mm2 modulus of elasticity) polyurethane, Type S or M, Grade P, Class 25, use T.
2.1.3 Floor Joint Sealant
Shall be single component butyl rubber base sealing compound or multi-component polyurethane sealing compound. Provide at locations as follows:
a. Seats of metal thresholds for exterior doors. As selected
b. Control joints in floors, slabs, Black ceramic tile and walkways.
2.2 MANUFACTURER
The following manufacturers comply with this Specification section:
a. MAPEI Via Coharo, 22 20158 Milano
Tel.: 02-376731 Fax: 02-37673214
b. SIKA ACRYL Sika Italia, S.p.A.
via E. De Amicis, 44 20123 Milano Tel: 02/721-261 Fax: 02/805-5649HILTI C.S. 202
c. HILTI ITALIA, S.P.A.
via Saccardo, 9 20134 Milano (MI) Tel: 02/212-721 Fax: 02/264-13-269
2.3 PRIMER FOR SEALANT
Section 07920 5
Provide a non-staining, quick-drying type of consistency recommended by the sealant manufacturer for the particular application.
2.4 BOND BREAKERS
Provide the type and consistency recommended by the sealant manufacturer for the particular application.
2.5 BACKSTOPS
Provide glass fiber roping or neoprene, butyl, polyurethane, or polyethylene foams free from oil or other staining elements as recommended by sealant manufacturer. Backstop material shall be compatible with sealant. Do not use oakum and other types of absorptive materials as backstops.
2.6 CLEANING SOLVENTS
Provide type(s) recommended by the sealant manufacturer (except for aluminum and bronze surfaces that will be in contact with sealant).
2.7 SEALANT TAPE
Provide butyl or rubber butyl type as recommended by the sealant manufacturer for the particular application.
3.1 SURFACE PREPARATION
Surfaces shall be clean, dry to the touch, and free from dirt frost, moisture, grease, oil, wax, lacquer, paint, and other foreign matter that would tend to destroy or impair adhesion. When resealing an existing joint, remove existing caulk or sealant prior to applying new sealant.
3.1.1 Steel Surfaces
Remove loose mill scale by sandblasting or, if sandblasting is impractical or would damage finish work, scraping and wire brushing.
Remove protective coatings by sandblasting or using a residue-free solvent.
3.1.2 Aluminum or Bronze Surfaces
Remove temporary protective coatings from surfaces that will be in contact with sealant. When masking tape is used as a protective coating, remove tape and any residual adhesive just prior to sealant application.
Use non-staining solvents recommended by the item manufacturer.
3.2 SEALANT PREPARATION
Do not add liquids, solvents, or powders to the sealant. Mix multicomponent elastomeric sealants in accordance with manufacturer's instructions.
3.3 APPLICATION
6 Section 07920
a. Acceptable Ratios:
JOINT WIDTH JOINT DEPTH
Minimum Maximum
For metal, glass or other non-porous surfaces:
6.3 millimeters (minimum) 6.3 mm 6.3 mm Over 6.3 millimeters 1/2 of Equal to width width
For wood or concrete:
6.3 millimeters (minimum) 6.3 mm 6.3 mm Over 6.3 mm to 12.7 mm 6.3 mm Equal to width
Over 12.7 mm to 50 mm 12.7 mm 15.8 mm
Over 50 millimeters (As recommended by sealant manufacturer)
b. Unacceptable Ratios: Where joints of acceptable width to depth ratios have not been provided, clean out joints to depths and grind or cut to shown above widths without damaging the adjoining work. Grinding shall not be required on metal surfaces.
3.3.1 Backstops
Install backstops dry and free of tears or holes. Tightly pack the back or bottom of joint cavities with backstop material to provide a joint of the depth specified. Install backstops in the following locations:
a. Where indicated.
b. Where backstop is not indicated but joint cavities exceed the acceptable maximum depths specified in paragraph entitled, "Joint Width-to-Depth Ratios".
3.3.2 Primer
Immediately prior to application of sealant, clean out loose particles from joints. Where recommended by sealant manufacturer, apply primer to joints in concrete masonry units, wood, and other porous surfaces in accordance with sealant manufacturer's instructions. Do not apply primer to exposed finish surfaces.
3.3.3 Bond Breaker
Provide bond breakers to the back or bottom of joint cavities, as recommended by the sealant manufacturer for each type of joint and sealant used, to prevent sealant from adhering to these surfaces.
Carefully apply the bond breaker to avoid contamination of adjoining surfaces or breaking bond with surfaces other than those covered by the bond breaker.
3.3.4 Sealants
Section 07920 7
Provide a sealant compatible with the material(s) to which it is applied.
Do not use a sealant that has exceeded shelf life or has jelled and cannot be discharged in a continuous flow from the gun. Apply the sealant in accordance with the manufacturer's instruction with a gun having a nozzle that fits the joint width. Force sealant into joints to fill the joints solidly without air pockets. Sealant shall be tooled after application to ensure adhesion. Sealant shall be uniformly smooth and free of wrinkles. Upon completion of sealant application, roughen partially filled or unfilled joints, apply sealant, and tool smooth as specified.
3.3.5 Sealant Tape
Apply in accordance with sealant manufacturer's instructions.
3.4 PROTECTION AND CLEANING
3.4.1 Protection
Protect areas adjacent to joints form sealant smears. Masking tape may be used for this purpose if removed 50 to 10 minutes after the joint is filled.
3.4.2 Final Cleaning
Upon completion of sealant application, remove excess sealants and all remaining smears and stains and leave the work in a clean and neat condition.
a. Concrete and Other Porous Surfaces: Immediately scrape off fresh sealant that has been smeared on concrete and rub clean with a solvent as recommended by the sealant manufacturer. Allow excess sealant to cure for 24 hours then remove by wire brushing or sanding.
b. Metal and Other Non-Porous Surfaces: Remove excess sealant with a solvent-moistened cloth.
Section 09310 1
SECTION 09310
CERAMIC TILE
1.1 APPLICABLE PUBLICATIONS
The publications listed below form a part of this specification to the
ITALIAN/EUROPEAN HARMONIZATION STANDARDS (UNI EN)(UNI ENV)(CEI EN)(UNI EN
ISO)(UNI ISO)
UNI EN 87 (1992) Ceramic Floor and Wall Tiles -
Definitions, Classification, Characteristics and Marking
UNI EN ISO 10545-2 (2000) Ceramic tiles - Determination of dimensions and surface quality
UNI EN ISO 10545-3 (2000) Ceramic tiles - Determination of water absorption, apparent porosity, apparent relative density and bulk density
UNI EN 101 (1992) Ceramic Tiles. Determination of
Scratch Hardness of Surface According to Mohs’ Scale.
UNI EN ISO 10545-11 (2000) Ceramic tiles - Determination of crazing resistance for glazed tiles
UNI EN ISO 10545-14 (2000) Ceramic tiles - Determination of resistance to stains
UNI EN ISO 10545-7 (2000) Ceramic tiles - Determination of resistance to surface abrasion for glazed tiles
UNI EN ISO 10545-12 (2000) Ceramic tiles - Determination of frost resistance
Regio Decreto No. 2231 (16.11.1939)Norms for Lime Acceptance.
1.2 SUBMITTAL
1.2.1 Manufacturer's Catalog Data
Submit complete descriptive literature for ceramic tiles. Clearly mark the data to indicate which type, size, and item the Contractor intends to provide. Provide sufficient data to show conformance to specified requirements. Include manufacturer’s name, address and phone and fax numbers.
1.2.2 Samples
2 Section 09310
Submit for approval to the Contracting Officer’s Technical Representative the following samples, prior to delivery to project site:
a. Floor tile
b. Interior wall tile units
1.3 DELIVERY, STORAGE AND HANDLING
The Contractor shall have received Government approval prior to delivering materials to the job site. Deliver to work site in unbroken containers, plainly marked and labeled with manufacturers' names and brands. Store in dry, well ventilated and weathertight sheds or enclosures. Protect materials from direct contact with the ground.
Handle materials with care to avoid chipping and breakage.
1.4 ENVIRONMENTAL CONDITIONS
Do not start tile work unless the ambient temperature in work area is at least 10 degrees C and rising. Maintain the ambient temperature above 10 degrees C while work is in progress and for at least 3 days after its completion. For the installation and subsequent cure of chemical-resistant epoxy the temperature shall be at least 16 degrees C and rising for a period of time recommended by the manufacturer. Do not use adhesives in unventilated areas.
1.5 EXTRA STOCK
Supply an extra two percent of each type, color, size, and finish of tile, trim, and accessory used in clean and marked cartons.
PART 2 - PRODUCTS
2.1 GENERAL
Tile work shall conform to UNI EN ISO 10545 and UNI EN 87 standards, and shall be produced from any suitable combination of thoroughly mixed clays, shales, flints, feldspars or other inorganic materials. Tiles shall be the best selection possible. Tile shall be thoroughly and evenly matured and free from defects affecting appearance or serviceability. Tile with chips, cracks, or other defects will not be acceptable. Defective tile placed in the work shall be removed and replaced with acceptable material at no additional cost to the Government.
2.2 The following manufacturers comply with this Specification section
a. CASALGRANDE PADANIA Via Statale 467, No.73 42100 Reggio Emilia Tel. : 0522/9901 Fax : 0522/996121
b. MIRAGE GRANITO CERAMICO
41026 Pavullo (Mo) Via Giardini nord, 225 Tel. : 0536/29611 Fax : 0536/210655
Section 09310 3
E-Mail-: infomir@mirage.it
c. MARAZZI CERAMICHE S.P.A.
Viale Regina Pacis, 39 41049 Sassuolo (Modena) Tel. : 0536/860274 Fax : 0536/860599 E-Mail-: marazzi.tecnica@marazzi.it
d. GRANITIFIANDRE S.P.A.
Via Radici Nord 42014 Castellarano (Reggio Emilia) Tel. : 0536/819611 Fax : 0536/850088-858082
2.3 TILES
2.3.1 Ceramic Porcelain Floor Tile
Tile shall be as scheduled and 8 mm minimum thick. Provide reasonably smooth, non-slip surface unaffected by moisture or cleaning solutions.
Tiles shall meet the following characteristics
Dimensional Tolerances
Length: ± 0,5% nominal UNI EN ISO 10545-2 Thickness: ± 1,0% UNI EN ISO 10545-2 Squareness: ± 0,2% UNI EN ISO 10545-2 Corner straightness: ± 0,1% UNI EN ISO 10545-2 Flatness: ± 0,1% UNI EN ISO 10545-2
Physical Characteristics
Water Absorption: ± 0,04% maximum UNI EN ISO 10545-3 Flexural Resistance: 57,3 N/mm2 minimum UNI EN ISO 10545-4 Resistance to Ice: No damage UNI EN ISO 10545-12
Shock Resistance: 0,89 minimum UNI EN ISO 10545-5 Hardness: 7÷8 MOHS
Finish Surface Characteristics
Abrasion Resistance: 133 mm3 UNI EN ISO 10545-6
Chemical Resistance: No damage UNI EN ISO 10545-13 Stain resistance: ≥ 4 UNI EN ISO 10545-14 Lead and cadmium transfer: not detectable UNI EN ISO 10545-15 Thermal shock resistance: no damage UNI EN ISO 10545-9 Skidding resistance: 0,62 ASTM C1820
2.3.2 Ceramic Porcelain Wall Tile and Trimmers
For wall facing shall be approximately 6 mm thick. Ceramic porcelain wall tile shall be as scheduled. Stops, returns, trimmers, caps, cove base, interior corner, exterior corner, special shapes, and accessories shall be provided as required for sills, jambs, recesses, offsets, and other conditions so as to provide a complete and neatly finished installation.
Colors shall be as indicated, trim pieces and accessories shall match the
4 Section 09310 adjacent tile color. Glazed ceramic wall tile shall be free from dark spots, fractures of glaze, heavy accumulations of glaze, spots insufficiently glazed, frosted or crystalline appearance, or rough spots.
Water absorption shall be within the range of 7% to 10%.
2.3.2.1 Tile Baseboard
Shall be of the same material and color of the wall tile and be 100 mm high.
2.4 SETTING BED
2.4.1 Portland Cement
Portland cement shall be normal Portland cement, Type 325.
2.4.2 SAND
Sand for setting beds, base coats, and grout shall be clean, washed, sharp, durable particles, free of slit, loam, clay, soluble, and organic impurities, and shall be well graded from coarse to fine within the limits noted for its specific use, as follows:
Percentage, Weight, Passing
Specific Use Sieve No.8 Sieve No.30 Sieve No. 100
Setting Beds, for Floors 100 --- Not more than 5
Base Coats, for Walls 100 --- Not more than 5
Grout --- 100 Not more than 5
2.4.3 Aggregate
Maximum size of coarse aggregate shall not be greater than half the thickness of concrete fill.
2.4.4 Lime
Lime shall be as specified in Section 09212, “Exterior Stucco.”
2.4.5 Water
Water shall be clean and free from injurious amounts of oil, acids, soluble salts, and organic impurities.
2.5 GROUT AND ADHESIVE
2.5.1 Latex Portland Cement Grout
Latex-Portland Cement Grout shall be a mixture of Portland Cement with a latex additive. The latex will help cure the grout. The grout shall be
Section 09310 5 properly prepared in strict accordance with the adhesive manufacturer's written directions. Grout color shall be as directed by the Contracting Officer’s Technical Representative.
2.5.2 ORGANIC ADHESIVE
A prepared organic material for interior use, ready to use with no further addition of liquid or powder, which cures or sets by evaporation.
It should be prepared in strict accordance with the adhesive manufacturer's written directions.
2.6 MARBLE THRESHOLD
Threshold shall be as specified in Section 04405, "Natural Stone Work".
2.7 SEALANTS AND CAULKING
Provide sealants and caulking in joints between tile and door frames as specified in Section 07920 "Joint Sealants".
3.1 GENERAL
Do not start tile work until roughing in for plumbing, heating, ventilating, air conditioning, and electrical work have been completed and tested; built-in shower stalls and membrane water-proofing have been installed and verified. Do not start tile work unless that ambient temperature of area in which work occurs is at least 10oC and rising.
Maintain the ambient temperature above 10oC without interruption while work is in progress and for at least 3 days after completion of work.
Before setting, tile shall be thoroughly soaked in clean water and drained so that no free moisture remains on the back of the tile.
3.2 PREPARATION
3.2.1 Concrete Subfloor Preparation
Do not begin floor tile installation in areas receiving wall tile until wall tile installation has been completed. Before applying tile, test structural concrete floor for levelness or uniformity of slope by using straightedges. Fill areas where the floor does not meet the required tolerances and level them to provide expansion joints where required.
3.2.2 Preparation of Setting Beds
Measure setting bed materials in approved containers to ensure that proportions of materials will be controlled and accurately maintained.
Measuring materials with shovels is not permitted. Unless specified otherwise, mix materials in proportions by volume in approved mixing machines or mortar boxes. Control the quantity of water accurately and uniformly.
3.3 INSTALLATION OF WALL TILE
3.3.1 Interior Wall Tile Installation
6 Section 09310
Wall surfaces receiving ceramic tile set with organic adhesive shall have square corners, be plumb and true, with variations not exceeding 1.25 mm in one meter from the required plane. Set wall tile by troweling a thin layer of organic adhesive over the water resistant gypsum wallboard. The installation method shall strictly adhere to the manufacturer's written instructions. Allow a minimum of 24 hours after tile is set before grouting.
3.3.2 Exterior Wall Tile Installation
Cementitious backer unit surface shall be free of coatings, oil, and wax.
Maximum wall surface variation shall not exceed 1 mm per meter on grade.
Provide an 18 mm thick cement mortar bed over cementitious backer unit.
Set tile by troweling a thin layer of Portland Cement paste over the mortar bed while it is still workable. The installation method shall strictly adhere to the manufacturer's written instructions. Allow a minimum of 24 hours after tile is set before grouting.
3.3.3 Grouting
After joints in wall tile have been thoroughly wet, they shall be grouted full with a plastic mix of neat, white waterproofed latex Portland cement. The joints shall be tooled slightly concave and the excess mortar shall be cut off and wiped from the face of tile. Joints between wall tile and plumbing or other built-in fixtures shall be made with a light colored caulking compound.
3.3.4 Curing
Immediately after the grout has had its initial set, tile wall surfaces shall be given a protective coat of a non-corrosive soap or other approved method of protection and joints shall be damp-cured for 72 hours.
3.4 INSTALLATION OF FLOOR TILE
3.4.1 Floor Tile Installation Latex-Portland Cement Mortar
Floor tile operations in spaces requiring wall tile shall not be started until after the wall tile installation has been completed. Surfaces to receive the various applications of materials shall be clean and free of dirt, dust, oil, grease, or other objectionable matter. The slab shall be well cured, dimensionally stable and free of cracks. The slab shall have a steel trowel and fine broom finish with no curing compounds used.
As soon as the bond coat has set sufficiently to be worked upon, a dust coat of dry latex Portland cement not more than 1.5 mm thick shall be sprinkled over the surface and lightly worked with a steel trowel. The laying shall begin as soon as the moisture, not free water, has penetrated the dust coat. A thin skin coat of neat latex Portland cement grout shall be troweled or brushed into the backs of tiles immediately before each set is laid. Tile sheets shall be laid on the freshly prepared bond coat while the surface is still plastic and tile then tamped into the mortar to insure solid bonding to the exact slope or level of finished floor surface. Tile shall be installed with their respective surfaces screened and tamped to true planes, level or pitched to drains as required by the drawings, so that the surface of the completed flooring will be at the elevations and grades shown. Re-tempering of mortar will not be permitted. Tile shall be laid out from the centerlines of each space outward and adjustments made along walls, Section 09310 7 partitions, and borders, if any, so as to symmetrize the pattern with a minimum of cut tiles. Joints between tiles shall be uniform width and as specified for the tile installed. A 6 mm wide temporary joint filler strip shall be provided between tile flooring and fixed vertical surface.
Tile shall be cut with a suitable cutting tool and rough edges shall be rubbed smooth. Cut tile misfits shall be replaced with properly cut tile. Straightedges shall be accurately set to the lines established and reset at suitable intervals to keep the joints parallel over the entire area.
3.4.2 Grouting and Pointing Joints
When installation has hardened sufficiently, a thick creamy slurry of waterproof grout and a minimum amount of water shall be spread until all joints are thoroughly filled. The surface of the floor shall be very gently rubbed with a wood block to bring tile surfaces to true planes, excess slurry shall be removed, and the floor shall be rubbed with burlap to clean the tile and finish the joints. Temporary joint filler strips shall then be removed, and the spaces shall be filled flush with mastic cement.
3.5 JOINTS
Make parallel, plumb, level, and in alignment. Make end joints in broken-joint work on center lines of adjoining tiles, as far as practicable. Set square tiles with straight joints.
3.5.1 Joint Width
Make joints uniform in width and space to accommodate tile with a minimum of cutting. Make joint widths as follows:
a. Mounted tile: As determined by the mounted tile spacing.
b. Unmounted wall tile: As determined by spacing lugs.
c. Ceramic Tile: 6 mm minimum, width of 10 mm maximum.
d. Trim units and accessories: Match adjoining tile units.
3.5.2 Expansion and Control Joints
Provide expansion…