Q&A_Area_2_Demolition.pdf

PDF 59 KB Posted

Attached to
ASJE 09-1030 REQUALIFICATION OF AREA 2, PH#1 DEMOLITION, AVIANO AB, ITALY
Solicitation number
FA5682-17-R-0014
Issued by

View the file

Other files

File Type Posted
ASJE_09-1030_CNS_Cost_Est_blank_R7.xls XLS spreadsheet
Amendment_1.pdf PDF
Technical_Specifications_Rev._7.pdf PDF
Existing_facilities_drawings_and_photo.zip ZIP file
Asbestos_Survey_Aviano-updateMay14_Area_2.pdf PDF
Solicitation.pdf PDF
Experience_Overview_Sheet_V1.docx DOCX document
Technical_Specifications_Rev_6.pdf PDF
Experience_Information_Sheet_V1.docx DOCX document
Additional_Requirements.doc DOC document
16303R.pdf PDF
ASJE_09-1030_SOW_DRAFT_for_RFI.pdf PDF
31_CONS_RFI_Worksheet_as_of_23_Feb_17.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

FA4582-17-R-0014

AREA 2 DEMOLITION

Question: Page 5 of the Technical Specifications states the following:

“Project includes restoration of the area affected by the demolition works by furnishing gravel sub-base, 20 cm of top soil and grass seeding. The area shall be leveled to the maximum extent possible following the existing storm water discharge distribution points.”

These activities are not mentioned in the detailed description of works neither in Paragraph 4.A (New Works) nor in Paragraph 4.D (Demo Works). BTW, paragraphs 4.B and 4.C are missing.

Can you please confirm if these works are required and specify if they must be included in CLIN 0001 (Part A) or 0002 (Part B) of Section B of the solicitation?

Answer:

As AF standard, New works are “A”, demo works are “D”. B and C are not applicable for the project. Restoration Costs have been considered in the demo cost associated to each facility and contractor must include it in the specific DEMO CLIN 0002 Additionally Technical Specifications Rev. 7 clarifies this question.

Question: The descriptions of several building demolitions include ACM and PACM. With reference to the PACM, should the costs for the disposal be included in the lump sum proposal?

Please clarify what criteria are the bidders supposed to use in their estimate?

Answer:

The Government will treat all Presumed ACM as ACM and the contractor should dispose of as

ACM.

Question: The period of performance may vary depending on the permits/authorizations to obtained or is to be considered as total time to be used for the project execution it self?

Answer:

Total performance period to perform all activities included in the project Technical Specifications Rev. 7 is 210 days.

Question: Can a request be submitted to use a movable purification system to treat the resulting material directly on site, so that the treated material can be reused in the work site?

Answer:

See Technical Specifications Rev. 7, Section 3 paragraph n.

Question: To what extent are the foundations to be demolished?

Answer:

See facilities as-built drawings attached to the RFP package.

Question: Can the demolition material be used for any ground filling?

See Technical Specifications Rev. 7, Section 3 paragraph o.

Question: What are the working hours? Will be the area always accessible?

Answer:

See Technical Specifications Rev. 7, Section 3 paragraph c.

Question: Will the new works have to be done before or after the demolition?

Answer:

It will be a Contractor decision.

Question: Will the perimeter fence be removed/demolished too?

Answer:

Perimeter fence and gates will remain in place

Question: Can the contractor use Government utilities (water specifically), to mitigate the dust?

Answer:

Yes. See Technical Specifications Rev. 7, Section 3 paragraph a.

Question: Will the asbestos removal plan have to be presented to the local ASL (local health authority) only? Or is the Government supposed to receive a copy of it?

Answer:

Asbestos removal plan have to be presented to the local ASL (local health authority). A Copy will be also need to be submitted to the Contracting Officer.

Question: There are some houses very close to the perimeter fence. Did anybody prepare a Dust Control Plan? Is the contractor supposed to prepare and mention the plan?

Answer:

The contractor is to supply a Dust Control Plan as part of the proposal. This is specified in the solicitation.

Question: Storm Drainage – Is there a plan or a survey available? Where are the inlets? Is the contractor supposed to carry out such survey and provide the Government with As-Built drawings of the system?

Answer:

No survey or inlet plan available. As per Technical Specifications Rev. 7 Par. 5. Contractor will have to provide Area A2 elevation survey signed and stamped by qualified engineer

Question: What are the close-out requirements (survey, as-built, etc.)?

See Technical Specifications Rev. 7, Section 5 paragraph 2.

Question: Is there any requirement for safety coordination pertaining to HN regulations (81/08)

Answer:

In term of D.M. 81/08 contractor will submit a P.O.S. (Piano Operativo di Sicurezza) as required as standard in CONS contract.

Question: During execution of works, will the area be subject to access controls by military authority or will the contractor have full unrestricted access?

Answer:

No. See Technical Specifications Rev. 7, Section 3 paragraph d.

Question: Utilities are supposed to remain, what about shallow man-holes?

Answer:

Technical Specifications Rev. 7 Section 4 D. states:

“After completion of work the site areas shall consist solely of bare terrain - free of any sidewalks, pads or pavements. Underground utilities and manholes/pits serving the facilities will be abandoned in place. Project includes restoration of the area affected by the demolition works by furnishing inert material sub-base, 20 cm of top soil and grass seeding. The area shall be leveled to the maximum extent possible following the existing storm water discharge distribution points”.

Question: Page 5 of the technical specifications states:

“Project includes restoration of the area affected by the demolition works by furnishing gravel sub-base, 20 cm of top soil and grass seeding. The area shall be leveled to the maximum extent possible following the existing storm water discharge distribution points.”

According to HN regulations, a certain part of the demolition materials can be used as sub-base.

After a very preliminary estimate, using all demolition materials as sub-grade will turn into an average subgrade thickness of 70/80cm spread all over the entire Area 2. Is this change of the final elevation of the area acceptable or is it mandatory to dispose off-site of a certain amount of such materials? Please consider that a topographic survey is not available with elevations and details.

As specified in Technical Specifications Rev. 7: Backfilling of excavated area to restore ground to zero elevation. Contractor is permitted to use compacted crushed natural inert material (bricks, concrete, etc) as sub-base for back-filling up to a depth of -50.0cm from ground zero elevation.

From a depth of -50.0cm to a depth of -20.0cm Contractor shall use natural washed gravel compacted at 95% of max density AASHO modified test. From a depth of -20.0cm to ground zero elevation Contractor shall use 20.0 cm of top soil and grass seeding.

Contractor may re-use material up to -50.0cm from the existing ground zero elevation that will have to be maintained. All exceeding material will have to be transported off base.

-------------------------------------------END OF DOCUMENT-------------------------------------------