ASJE 09-1030 REQUALIFICATION OF AREA 2, PH#1 DEMOLITION, AVIANO AB, ITALY
Solicitation number
FA5682-17-R-0014
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
ASJE_09-1030_CNS_Cost_Est_blank_R7.xls XLS spreadsheet
Technical_Specifications_Rev._7.pdf PDF
Q&A_Area_2_Demolition.pdf PDF
Existing_facilities_drawings_and_photo.zip ZIP file
Asbestos_Survey_Aviano-updateMay14_Area_2.pdf PDF
Solicitation.pdf PDF
Experience_Overview_Sheet_V1.docx DOCX document
Technical_Specifications_Rev_6.pdf PDF
Experience_Information_Sheet_V1.docx DOCX document
Additional_Requirements.doc DOC document
16303R.pdf PDF
ASJE_09-1030_SOW_DRAFT_for_RFI.pdf PDF
31_CONS_RFI_Worksheet_as_of_23_Feb_17.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

Update Attachment 1: Technical Specifications.

Attachment 1 is hereby changed from Technical Specifications Rev 6, dated May 2017, 15 pages to Technical Specifications Rev 7, dated 25 May 2017, 19 pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-May-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568217R0014

X 9B. DATED (SEE ITEM 11)

15-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-May-2017

CODE

31 CONS DA LGC - FA5682

UNIT 6102

APO AE 09604-6102

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA568217R0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are an integral part of this contract:

a. Attachment 1:

Technical Specifications Rev. 7, dated 25 May 2017.

- 19 pages

b. Attachment 2:

16303R of Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November 2005

- 11 pages

c. Attachment 3:

Existing facilities, drawings, and photos

- Electronic folder containing individual folders for 12 buildings

d. Attachment 4:

Asbestos Survey Aviano-update May 14 Area 2

- 6 pages

e. Attachment 5:

Additional Requirements, dated 24 February 2017

- 5 pages

f. Attachment 6:

Experience Overview sheet V1 dated Feb 2017

- 1 page

g. Attachment 7:

Experience Information sheet V1 Feb 2017

- 2 pages

(End of Summary of Changes)