FA5682-16-R-0043-0001.pdf

PDF 41 KB Posted

Attached to
SUSTAIN HANGAR #2 BAY FLOOR, FAC. 925, AREA F, AVIANO AB, ITALY
Solicitation number
FA5682-16-R-0043
Issued by

About this file

AMENDMENT FA5682-16-R-0043-0001

View the file

Other files

File Type Posted
ASHE_16-1070_CNS_Cost_Est_REVISION_1.pdf PDF
ASHE_16-1070_SOW_REVISION_2.pdf PDF
ADDITIONAL_REQUIREMENTS_16_Sep_2016.pdf PDF
SOLICITATION_FA5682-16-R-0043.pdf PDF
ASHE_16-1070_SOW_Revision_1.pdf PDF
Sections_of_Master_Specifications.pdf PDF
ASHE_16-1070_SOW.doc DOC document
ASHE_16-1070_CNS_Cost_Est_blank.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1F3A26253A001 ASHE 16-1070

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make changes as indicated below and in the follow ing pages:

Section A/Standard Form 1442, block 13A: change the closing date for receipt of offers.

Section A/Standard Form 1442 block 13D: change the number of days for Government acceptance of offers.

Section B/Standard Form 1442 extended description of items 0001 and 0002 and Section J, paragraph a: replace the Technical Specif ications Revision 1 w ith the Technical Specif ications Revision 2.

Section L, provision L-01 Offer preparation Instructions and Section M/provisions M001 and M002: change as indicated in the summary of changes.

Section L, provision L-04, Offer Submission Instructions: delete last sentence.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5682-16-R-0043

X 9B. DATED (SEE ITEM 11)

20-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Sep-2016

CODE

31 CONS LGC - FA5682

VIA PORDENONE 89/B, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

AVIANO (PN) 33081

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA5682-16-R-0043

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-Sep-2016 02:00 PM to 28-Sep-2016 02:00 PM.

The offeror acceptance period has decreased by 1 from 3 to 2.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A.

TECHNICAL SPECIFICATIONS FOR ASHE 16-1070 SUSTAIN HANGAR #2 BAY FLOOR, FAC. 925, AREA F, AVIANO AB, ITALY REVISION 1 DATED SEP 2016 AND MARKED STATEMENT OF WORK REVISION 1, ITEMS 4.1.a.1, 4.1.b.1, 4.1.c.1, 4.1.d.1, 4.1.e.1, 4.1.f.1, 4.1.g.1, 4.1.h.1 OF THE TECHNICAL

SPECIFICATIONS- 30 WRITTEN PAGES INCLUDING COVER PAGE AND APPLICABLE SECTIONS OF

THE MASTER TECHNICAL SPECIFICATIONSB.. ADDITIONAL REQUIREMENTS DATED 16 SEP 2016 - 3

WRITTEN PAGES

To:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A.

TECHNICAL SPECIFICATIONS FOR ASHE 16-1070 SUSTAIN HANGAR #2 BAY FLOOR, FAC. 925, AREA F, AVIANO AB, ITALY REVISION 2 DATED SEP 2016 AND MARKED STATEMENT OF WORK REVISION 2, ITEMS 4.1.a.1, 4.1.b.1, 4.1.c.1, 4.1.d.1, 4.1.e.1, 4.1.f.1, 4.1.g.1, OF THE TECHNICAL SPECIFICATIONS- 33

WRITTEN PAGES INCLUDING COVER PAGE, LAYOUT, PHOTO AND APPLICABLE SECTIONS OF THE

MASTER TECHNICAL SPECIFICATIONSB. ADDITIONAL REQUIREMENTS DATED 16 SEP 2016 - 3

WRITTEN PAGES.

CLIN 0002

The CLIN extended description has changed from:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A.

TECHNICAL SPECIFICATIONS FOR ASHE 16-1070 SUSTAIN HANGAR #2 BAY FLOOR, FAC. 925, AREA F, AVIANO AB, ITALY REVISION 1 DATED SEP 2016 AND MARKED STATEMENT OF WORK REVISION 1, ITEMS 4.1.a.2, 4.1.b.2, 4.1.c.2, 4.1.d.2, 4.1.e.2, 4.1.f.2, 4.1.g.2, 4.1.h.2 OF THE TECHNICAL

SPECIFICATIONS- 30 WRITTEN PAGES INCLUDING COVER PAGE AND APPLICABLE SECTIONS OF

THE MASTER TECHNICAL SPECIFICATIONSB.. ADDITIONAL REQUIREMENTS DATED 16 SEP 2016 - 3

WRITTEN PAGES

To:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A.

TECHNICAL SPECIFICATIONS FOR ASHE 16-1070 SUSTAIN HANGAR #2 BAY FLOOR, FAC. 925, AREA F, AVIANO AB, ITALY REVISION 2 DATED SEP 2016 AND MARKED STATEMENT OF WORK REVISION 2, ITEMS 4.1.a.2, 4.1.b.2, 4.1.c.2, 4.1.d.2, 4.1.e.2, 4.1.f.2, 4.1.g.2, 4.1.h and 4.1i OF THE TECHNICAL

SPECIFICATIONS- 33 WRITTEN PAGES INCLUDING COVER PAGE, LAYOUT, PHOTO AND

APPLICABLE SECTIONS OF THE MASTER TECHNICAL SPECIFICATIONSB. ADDITIONAL

REQUIREMENTS DATED 16 SEP 2016 - 3 WRITTEN PAGES.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are attachments to this document and are an integral part hereof:

a. Attachment 1:

Technical Specifications for ASHE 16-1070 Sustain Hangar #2 Bay Floor, Fac. 925, Area F, Aviano AB, Italy Revision 2 dated Sep 2016 and marked Statement of Work Revision 2

- 33 pages including cover page, layout, photo and Applicable Sections of the Master Technical Specifications

b. Attachment 2:

Additional Requirements, dated 16 September 2016

- 3 pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

L-04. OFFER SUBMISSION INSTRUCTIONS

Offers in response to this solicitation shall be submitted to reach the issuing office indicated at page 1 of the solicitation, Standard Form 1442 block 7, by the date and time specified in block 13A of the Standard Form 1442.

L-01. OFFER PREPARATION INSTRUCTIONS

To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.

The following documents constitute the offer. Failure to submit any of the below documents may be cause for rejection of the offer:

1. PRICE OFFER

(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442 In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown form Revision 1. The extended amount must equal the whole Euro unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 2, "Additional Requirements”.

(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate breakdown Revision 1 shall be returned in their entirety.

2. TECHNICAL ACCEPTABILITY

Submit current SOA certification for category OS06 and/or OS07 and/or OS26 and classification adequate to cover offeror’s amount for project performance.

3. EXPERIENCE

Submit offeror’s experience with the same work/trades and complexity as the instant requirement. The offeror must submit evidence of at least two (2) contracts performed within the last five (5) years from the date of proposal that involved substantially the same work/trades and complexity as the instant requirement.

4. TECHNICAL DATA

The offeror must submit catalog extracts or technical data sheets for the entire floor cycle, items 4.1b, 4.1c, 4.1d, 4.1e, 4.1f, 4.1g, 4.1h. The technical data must be in sufficient detail to allow the Government evaluation team to ascertain total compliance with the requirements set forth in the project Technical Specifications.

SECTION M - EVALUATION FACTORS FOR AWARD

Section M - Evaluation Factors for Award

M001 SELECTION

a. Basis for Contract Award This Solicitation is subject to the Simplified Acquisition Procedures (SAP) of the Federal Acquisition Regulation (FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil.

The Government will select the offer of the responsible vendor whose offer represents the best value after evaluation in accordance with the factors indicated in paragraph M002 below.

b. Number of Contracts to be Awarded

The Government intends to award one contract for the performance of project ASHE 16-1070 Sustain Hangar #2 Bay Floor, Fac. 925, Aviano AB, Italy Revision 2

c. Solicitation Requirements, Terms and Conditions Offerors are required to meet all solicitation requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.

M002 EVALUATION FACTORS

The following evaluation factors will be used to evaluate each offer.

Factor 1: Price determined to be reasonable and affordable.

The offeror’s price will be evaluated for award purposes based upon the total price offered. Offerors whose price cannot be determined to be reasonable and affordable may not be considered for award.

Factor 2: Technical Acceptability This factor evaluates offeror’s current SOA certification for category OS06 and/or OS07 and/or OS26 and classification adequate to cover offeror’s amount for project performance. This requirement is met when the offeror includes a copy of the current SOA certification for category OS06 and/or OS07 and/or OS26 and classification adequate to cover offeror’s amount for project performance.

Factor 3: Experience This subfactor evaluates offeror’s experience with the same work/trades and complexity as the instant requirement.

This requirement is met when the offeror’s proposal includes evidence of at least two (2) contracts performed within the last five (5) years from the date of proposal that involved substantially the same work/trades and complexity as the instant requirement.

Factor 4: Technical Data This factor evaluates offerors capacity to comply with the requirements of the Technical Specifications. This requirement is met when the offeror includes catalog extracts or technical data sheets for the entire floor cycle, items 4.1b, 4.1c, 4.1d, 4.1e, 4.1f, 4.1g, 4.1h indicated in the Technical Specifications, in sufficient detail to allow the Government evaluation team to ascertain total compliance with the requirements set forth in the project Technical Specifications.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .