ASHE_16-1070_SOW.doc
DOC document 3 MB Posted
- Solicitation number
- FA5682-16-R-0043
About this file
Technical Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5682-16-R-0043-0001.pdf | ||
| ASHE_16-1070_CNS_Cost_Est_REVISION_1.pdf | ||
| ASHE_16-1070_SOW_REVISION_2.pdf | ||
| ADDITIONAL_REQUIREMENTS_16_Sep_2016.pdf | ||
| SOLICITATION_FA5682-16-R-0043.pdf | ||
| ASHE_16-1070_SOW_Revision_1.pdf | ||
| Sections_of_Master_Specifications.pdf | ||
| ASHE_16-1070_CNS_Cost_Est_blank.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: SEP 2016
U.S. AIR FORCE
31ST FIGHTER WING
31ST CES/CENM
AVIANO AIR BASE, ITALY
TECHNICAL SPECIFICATIONS FOR
ASHE 16-1070 SUSTAIN HANGAR #2 BAY FLOOR, FAC.925, AREA F, AVIANO AB, ITALY
1. SCOPE OF WORK.
The Contractor shall provide all management, tools, supplies, equipment, transportation and qualified personnel necessary to perform the following work:
· Sand blasting of the existing floor;
· Cleaning;
· Epoxy surface treatment in multiple layers with meshes, including joints re-performance;
· Floor striping.
2. WORKS LOCATION
Hangar 2, Aviano Air Base.
3. WORK SITE CONDITIONS
a.
Before works start, contractor will submit a detail works schedule to C.O. for coordination and approval.
b.
Works will not be performed in a restricted area.
c.
The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.
d.
Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 07.30 to 18.30 hours. Work during weekends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities.
e.
Toilet facilities in the vicinity of the work site shall be available for Contractor use. The Contractor shall use facilities in a manner to maintain their state of cleanliness and hygiene.
f.
The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.
g.
The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety and in particular Italian laws D.L. 81/08 h At least 5 days prior to the pre-final inspection, the Contractor shall furnish to the Contracting Officer all installed equipment operation and maintenance documentation, certificates concerning installed systems as required by host country laws, test reports and results and as built drawings where required by host nation laws.
j Works will be performed in a single phase. Facility will be delivered empty to the contractor.
4. WORK DESCRIPTION
1.
EACH ITEM OF THE SCHEDULE IS INCLUSIVE OF FURNISHING AND INSTALLATION OF MATERIALS AND EQUIPMENT, SCAFFOLDING, TRANSPORTATION TO DUMP OR STORAGE OF DEMOLISHED AND/OR REMOVED MATERIALS, IN ACCORDANCE WITH CONTRACTING OFFICER'S INSTRUCTIONS AND ALL FINISHING WORK REQUIRED TO MAKE EACH ITEM COMPLETE IN A WORKMANLIKE MANNER.
2.
ALL THE QUANTITIES THAT ARE INDICATED OR SUCCESSIVELY ADDED, ARE ESTIMATES. THEREFORE THE GOVERNMENT SHALL BE NOT HELD RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES. THE CONTRACT REQUIRES A COMPLETED PROJECT ON A LUMP SUM BASIS.
IT IS THEREFORE THE RESPONSIBILITY OF THE CONTRACTOR TO CALCULATE, FORESEE AND PERFORM ALL QUANTITIES AND WORK NECESSARY EVEN IF NOT MENTIONED IN THE SPECIFICATIONS BUT INCLUDED IN THE DRAWINGS OR MANIFESTLY NECESSARY TO DELIVER A COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.
4.1 NEW EPOXY RESIN FLOOR
a) Mechanical shoot blasting of floor surface up to 2.0mm, to remove rough resin treatment, oil residual, superficial finishes of nude industrial floor and to prepare an adequate surface for resin application. Item includes Removal and dumping to authorized dump of removed resin material and debris and dust vacuum 4.1.a.1 1,950.00 sq.m.
4.1.a.2 1,950.00 sq.m.
b) Supply and installation of primer coating;
4.1.b.1 1,950.00 sq.m.
4.1.b.2 1,950.00 sq.m.
c) Supply and installation of one layer of tri components epoxy resin treatment “controspinta” via spatula (no via roll), including Surface smoothing and dust vacuum;
4.1.c.1 1,950.00 sq.m.
4.1.c.2 1,950.00 sq.m.
d) Supply and installation of first layer of tri components epoxy resin treatment via spatula (no via roll) adding corundum (same size of all other PASs) to create antiskid surface, including surface smoothing and surplus corundum vacuum;
4.1.d.1 1,950.00 sq.m.
4.1.d.2 1,950.00 sq.m.
e) Supply and installation of second layer of tri components epoxy resin treatment via spatula (no via roll), including Surface smoothing and dust vacuum;
4.1.e.1 1,950.00 sq.m.
4.1.e.2 1,950.00 sq.m.
f) Supply and installation of final layer of tri components epoxy resin treatment “scratch proof” via spatula (no via roll); Final coating will be added with corundum antiskid mesh same size of all other PASs;
4.1.f.1 1,950.00 sq.m.
4.1.f.2 1,950.00 sq.m.
g) Joint re-performance by saw cutting, joint cleaning and application of elastic appropriate material on the joint (roll or other specific mean is authorized);
4.1.g.1 1,075.00 l.m.
4.1.g.2 1,075.00 l.m.
h) Floor striping performance using not reflective painting (pattern as existing one).
4.1.h.1 Lump Sum
4.1.h.2 Lump Sum 3,900 SQ.M. Total floor surface to be treated
2,150 L.M. Total joints length to be installed.
5. APPLICABLE TECHNICAL SPECIFICATIONS
The following Sections of the Master Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated November 2005 and applicable modifications shall be applicable to the present project, together with the List of Work Items to be performed:
| 01100 |
| general Conditions |
| 01101 |
| PROJECT SIGN |
| 02220 |
| SITE DEMOLITION |
| 09900 |
| PAINTS AND COATINGS |
6. ADDITIONAL REQUIREMENT
· Included in the proposal, contractor will submit technical data, application procedures and other relevant information of material he plans to install for C.O. approval.
· Once issued NTP, Contractor is required to contact CEAOR (Ms. Cristina Rossetto 0434-305691) and schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization (blank DD1354 and category codes list area available at 31CES/CENM during duty hours). Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out
· For warranty call purpose, 3 copies of letter identifying project number, item, company address, phone number, point of contact, item warranty expiration date, etc. One copy of the letter will be installed next the item for immediate consultation.
Project # ASHE 16-1070
Statement of Work
DATE: SEP 2016
31CES/CENM
_1325483458.bin
_1325483459.wmf