Blank_Cost_Est_Fac__1405.xls
XLS spreadsheet 110 KB Posted
- Solicitation number
- FA5682-16-R-0039
About this file
CONSTRUCTION COST ESTIMATE BREAKDOWN
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5682-16-R-0039.pdf | ||
| ADDITIONAL_REQUIREMENTS.pdf | ||
| B_1405_Applicable_Master_Tech_Specs.pdf | ||
| Attachment___1.pdf | ||
| SOW__Bldg_1405.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
ASHE 16-5001
| CONSTRUCTION COST ESTIMATE BREAKDOWN | PAGE 1 OF1 | ||||||||
| PAITING INTERIOR AND SECURE FITNESS CENTER BACK OFFICES | |||||||||
| PURCHASE REQ. NO. | WORK LOCATION : Fac. 1405, AREA F, AVIANO AIR BASE | ||||||||
| Line | ITEM | Unit | Quant. | Material cost | |||||
| no. | of | Unit | Total | Man | Average | Total | Line total | ||
| me. | Hours | rate | |||||||
| 5.1 | Furnish and application of two coats of enamel stain water, type SIGMA CONTOUR AQUA PU SATIN. | SQ.M./MQ | |||||||
| 5.2 | Scraping ceiling/walls plaster in the showers stalls and application of smoothing products | SQ.M./MQ | |||||||
| 5.3 | Furnish and application of two coats of high quality silicate based paint, type CAPAROL Sylitol Bio-Innerfarbe. | SQ.M./MQ | |||||||
| 5.4 | Furnish and application of two coats of high quality water- based paint, type CAPAROL CAPATOP. | SQ.M./MQ | |||||||
| 5.5 | Repair of existing wallpaper and rubber sheet on the wall. | LS/AC | |||||||
| 5.6 | Furnish and installation of new 85x265 cm door and transom | LS/AC | |||||||
| 5.7 | Furnish and installation of new 2.60x2.48 mt blind roller shutter, including gear motor, electrical connection, etc. | LS/AC | |||||||
| 5.8 | Scaffolding | LS/AC | |||||||
| Total Cost |
Sheet1
| FOR GOVERNMENT USE ONLY | ||||||||||||
| SABER PROJECT GOVERNMENT CONSTRUCTION COST ESTIMATE BREAKDOWN | PAGE 1 OF | |||||||||||
| CONTRACT FOR | ||||||||||||
| PURCHASE REQ. NO. | SABER PROJECT # | WORK LOCATION | ||||||||||
| Line | UPB | ITEM | Unit | Quant. | Material cost | |||||||
| no. | CODE | of | Unit | c. | Total | Man | Average | c. | Total | Line total | ||
| me. | Hours | rate | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 |
Sheet3
File details come from the government source that posted it. Updated .