ASHE_16-1039_CCEBD-100__MDT_R1_(1).xlsx
XLSX spreadsheet 89 KB Posted
- Solicitation number
- FA5682-16-R-0038
About this file
Construction Cost Estimate Breakdown Revision 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_0001.pdf | ||
| 2493_ASHE_16-1039_FAC_1342_AC1_ENG_100_binderR1.pdf | ||
| solicitation.pdf | ||
| Checklist.pdf | ||
| Design_Guides_Aviano.zip | ZIP file | |
| DWG_part_1.pdf | ||
| 2493_ASHE_16-1039_FAC_1342_AC1_ENG_100_binder.pdf | ||
| DWG_part_3.pdf | ||
| ashe_16-1039_-_planimetria_di_cantiere.pdf | ||
| ASHE_16-1039_CCEBD-100_.xlsx | XLSX spreadsheet | |
| ADDITIONAL_REQUIREMENTS_(under_150K)_12_August.doc | DOC document | |
| DWG_part_2.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
repair
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||||
| RENOVATE FAC.1342 FOR 606 ACS BED DOWN - Revision 1 | |||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||||
| ASHE 16-1039 | AREA F, AVIANO AIR BASE, ITALY | ||||||||||||
| MATERIAL COSTS | LABOR COSTS | ||||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||||
| B. | REPAIR WORK / Lavori di Ristrutturazione | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||||||||||||
| Ia Architectural Work - Ia Lavori Architettonici | |||||||||||||
| 1 | REMOVAL OF INTERIOR WOOD DOORS | ||||||||||||
| Rimozione di porte in legno interne | IT. No. Art. n. | 1 | Ea./No. | ||||||||||
| 2 | DEMOLITION OF MASONRY PARTITIONS Demolizioni di tramezzatura in muratura | IT. No. Art. n. | 2 | m2 | |||||||||
| 3 | REMOVAL OF EXTERIOR WINDOWS AND DOORS | ||||||||||||
| Rimozione di porte e fineste | IT. No. Art. n. | 3 | m² | ||||||||||
| 4 | FALSE CEILING REMOVAL | ||||||||||||
| Rimozione controsoffitto | IT. No. Art. n. | 4 | m² | ||||||||||
| 5 | REMOVAL OF THRESHOLDS, SILLS, SLABS, NATURAL OR ARTIFICIAL STONE | ||||||||||||
| Rimozione di soglie, davanzali, lastre in marmo, pietra naturale o artificiale. | IT. No. Art. n. | 5 | m | ||||||||||
| 6 | DEMOLITION OF CONCRETE FLOORS | ||||||||||||
| Demolizione di pavimentazione in calcestruzzo | IT. No. Art. n. | 6 | m2 | ||||||||||
| 7 | TREANCH EXAVATION | ||||||||||||
| scavo in trincea | IT. No. Art. n. | 7 | m3 | ||||||||||
| Total Architectural Work - Totale Lavori Architettonici |
| Ib Structural Work - Ib Lavori Strutturali |
| NOT APPLICABLE |
Non applicabile
| Ic Civil Work - Ic Lavori Civili |
| NOT APPLICABLE |
Non applicabile Total Civil Work - Totale Lavori Civili
| Id Mechanical Work- Id Lavori Meccanici | |||
| 8 | REMOVAL OF EXISTING HVAC SYSTEM EQUIPMENT | ||
| Rimozione componenti impianto di climatizzazione esistente | IT. No. Art. n. | 1 | LS/AC |
| Total hvac and plumging removal - Totale rimozionee impianti idrici e hvac |
| Ie Electrical Work - Ie Lavori Elettrici | |||
| 16 | REMOVE AND DEMOLITION EXISTING ELECTRYCAL SYSTEM ( ELECTRYCAL SYSTEM NOT USED) | ||
| Rimuovere e demolire impianto elettrico esistente (non più utilizzato) | IT. No. Art. n. | 1 | LS/AC |
| Total Electrical Work - Totale Lavori Elettrici |
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
| IIa Architectural Work - IIa Lavori Architettonici | |||
| 17 | CLOSING OF ROOMS, HOLES AND NEW BRICK SIDES IN CLAY BRICKS | ||
| Chiusura di vani e fori e nuove spallette in mattoni pieni o semipieni | IT. No. Art. n. | 1 | m³ |
| 18 | INTERNAL BASE PLASTER - PRE MIXED LIME CONCRETE | ||
| Intonaco interno di fondo premiscelato a base calce-cemento. | IT. No. Art. n. | 2 | m² |
| 19 | 20x20 CM CERAMIC TILE LINING FOR CHECK RESTROOM AND REPAIR | ||
| Controllo e sistemazione rivestimento in piastrelle di ceramica 20x20 cm per servizi igienici | IT. No. Art. n. | 3 | m2 |
| 20 | WOOD BASEBOARD | ||
| Zoccolino battiscopa in legno | IT. No. Art. n. | 4 | m |
| 21 | PAINTING OF INTERIOR WALLS | ||
| Tinteggiatura di pareti interne | IT. No. Art. n. | 5 | m2 |
| 22 | PAINTING OF EXTERIOR WALLS | ||
| Tinteggiatura di pareti esterne | IT. No. Art. n. | 6 | m2 |
| 23 | PLAN FALSECEILING | ||
| Controsoffitti a lastra | IT. No. Art. n. | 7 | m² |
| 24 | LIME-CEMENT-BASED PREMIX FOR EXTERNAL TWO LAYERS PLASTER | ||
| Intonaco premiscelato per esterni a base calce cemento a due strati | IT. No. Art. n. | 8 | m² |
| 25 | RAISED FLOOR | ||
| pavimento sopraelevato | IT. No. Art. n. | 9 | m2 |
| 26 | MASONRY WALL OF LIGHTWEIGHT CONCRETE HOLLOW BLOCKS | ||
| Muratura di tamponamento in blocchi forati in cemento alleggerito con argilla espansa | IT. No. Art. n. | 10 | m² |
| 27 | ROOF CHECK AND REPAIR | ||
| Controllo e sistemazione della copertura | IT. No. Art. n | 11 | m² |
| 28 | REPAIR CERAMIC FLOOR | ||
| Sistemazione pavimentazione in ceramica | IT. No. Art. n | 12 | Ls |
| 29 | NEW INTERNAL DOOR | ||
| Nuova porta interna | IT. No. Art. n | 13 | Ea./No. |
| 30 | MASONRY WALL OF LIGHTWEIGHT CONCRETE HOLLOW BLOCKS - VAULT ROOM | ||
| Muratura di tamponamento in blocchi forati in cemento alleggerito con argilla espansa - Vault Room | IT. No. Art. n | 14 | m² |
| 31 | VOLT ROOM DOOR | ||
| Porta volt room | IT. No. Art. n | 15 | Ea./No. |
| 32 | CONCRETE BOND BEAM | ||
| Cordolo in calcestruzzo armato. | IT. No. Art. n. | 16 | m³ |
| 33 | STEEL LINTELS | ||
| Architravi in acciaio | IT. No. Art. n. | 17 | Ls/Ac |
| Total Architectural Work - Totale Lavori Architettonici |
| IIb Structural Work - IIb Lavori Strutturali |
| NOT APPLICABLE/Non applicabile |
IIc Civil Work - IIc Lavori Civili
Total Civil Work - Totale Lavori Civili
TOTAL PART II / Totale Parte II
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||
| PART IIIa - HVAC SYSTEMS / Parte IIIa -Impianti HVAC | |||
| 34 | CLEANING OF AIR DUCTWORKS. | ||
| Pulizia delle canalizzazioni dell'aria | IT. No. Art. n. | 1 | LS/AC |
| 35 | DAMAGED MECHANICAL EQUIPMENT | ||
| Apparecchiature meccaniche danneggiate | IT. No. Art. n. | 2 | LS/AC |
| 36 | COMPLETE REVISION OF THE AHUS, CLEANING FANS, HEAT EXCHANGE COIL, SUPPLAY FILTERS ETC. | ||
| Revisione completa dalla uta, pulizia ventilatori, batterie di scambio termico, fornitura filtri ecc. | IT. No. Art. n. | 3 | LS/AC |
| 37 | NEW HVAC CONTROL SYSTEM | ||
| Nuovo sistema di controllo HVAC | IT. No. Art. n. | 4 | LS/AC |
| 38 | ADJUST THE AIR DUCTS FUNCTION OF NEW ARCHITECTURAL REQUIREMENTS | ||
| Modificare i condotti dell'aria in funzione delle nuove esigenze architettoniche | IT. No. Art. n. | 5 | LS/AC |
| 39 | TESTING OF MECHANICAL SYSTEM | ||
| Verificare il funzionamento degli impianti meccanici | IT. No. Art. n. | 6 | LS/AC |
| Total HVAC Systems - Totale Impianti HVAC |
PART IIIb - PLUMBING SYSTEM / PARTE IIIa - Impianto Idrico-sanitario
Total Plumbing System - Totale Impianto Idrico-Sanitario
| TOTAL PART III / Totale Parte III | ||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||
| 40 | FURNISHING AND INSTALLATION NEW ELCTRYCAL "PANEL V" | |
| Fornitura e installazione di nuovo quadro elettrico "PANEL V" | IT. No. | |
| Art. n. | 1a | LS/AC |
| 41 | UPGRADE EXISTING ELECTRYCAL "PANEL C" (analyse lay-out diagram) | |
| Adeguamento impiantistico quadro elettrico esistente "PANEL C" (vedere schemi elettrici). | IT. No. | |
| Art. n. | 1b | LS/AC |
| 42 | UPGRADE EXISTING ELECTRYCAL "PANEL D" (analyse lay-out diagram) | |
| Adeguamento impiantistico quadro elettrico esistente "PANEL D" (vedere schemi elettrici). | IT. No. | |
| Art. n. | 1c | LS/AC |
| 43 | UPGRADE EXISTING ELECTRYCAL "PANEL E" (analyse lay-out diagram) | |
| Adeguamento impiantistico quadro elettrico esistente "PANEL E" (vedere schemi elettrici). | IT. No. | |
| Art. n. | 1d | LS/AC |
| 44 | UPGRADE EXISTING ELECTRYCAL "PANEL F" (analyse lay-out diagram) | |
| Adeguamento impiantistico quadro elettrico esistente "PANEL F" (vedere schemi elettrici). | IT. No. | |
| Art. n. | 1e | LS/AC |
| 45 | UPGRADE EXISTING ELECTRYCAL "PANEL G" (analyse lay-out diagram) | |
| Adeguamento impiantistico quadro elettrico esistente "PANEL G" (vedere schemi elettrici). | IT. No. | |
| Art. n. | 1f | LS/AC |
| 46 | UPGRADE EXISTING ELECTRYCAL "PANEL CT" (analyse lay-out diagram) | |
| Adeguamento impiantistico quadro elettrico esistente "PANEL CT" (vedere schemi elettrici). | IT. No. | |
| Art. n. | 1g | LS/AC |
| 47 | UPGRADE EXISTING ELECTRYCAL "PANEL EP1" (analyse lay-out diagram) | |
| Adeguamento impiantistico quadro elettrico esistente "PANEL EP1" (vedere schemi elettrici). | IT. No. | |
| Art. n. | 1h | LS/AC |
| 48 | adjusting and new position "PANEL FMU" WITH USA OUTLET 100A 208/120Vac. | |
| Adeguamento impiantistico quadri esistenti "FMU", completo di presa elettrica americana da 100A 208/120Vac. | IT. No. | |
| Art. n. | 1i | LS/AC |
| 49 | FURNISHING AND INSTALLATION NEW TRASFOMER |
400Vac/ 208-120Vac-20KVA Fornitura e installazione di nuovo trasformatore
| 400Vac / 208/120Vac -20KVA | IT. No. | |
| Art. n. | 2 | LS/AC |
| 50 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OR 3G1,5mmq | |
| Fornitura e installazione di Cavo elettrico FG7OR 3G1,5mmq | IT. No. | |
| Art. n. | 3a | m |
| 51 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OR 3G2,5mmq | |
| Fornitura e installazione di Cavo elettrico FG7OR 3G2,5mmq | IT. No. | |
| Art. n. | 3b | m |
| 52 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OR 3X6mmq | |
| Fornitura e installazione di Cavo elettrico FG7OR 3X6mmq | IT. No. | |
| Art. n. | 3c | m |
| 53 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OR 4X10mmq | |
| Fornitura e installazione di Cavo elettrico FG7OR 4X10mmq | IT. No. | |
| Art. n. | 3d | m |
| 54 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OR 5G4mmq | |
| Fornitura e installazione di Cavo elettrico FG7OR 5G4mmq | IT. No. | |
| Art. n. | 3e | m |
| 55 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OR 5G6mmq | |
| Fornitura e installazione di Cavo elettrico FG7OR 5G6mmq | IT. No. | |
| Art. n. | 3f | m |
| 56 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OR 5G16mmq | |
| Fornitura e installazione di Cavo elettrico FG7OR 5G16mmq | IT. No. | |
| Art. n. | 3g | m |
| 57 | FURNISHING AND INSTALLATION ELECTRICAL CABLE FG7OR 5G35mmq | |
| Fornitura e installazione di Cavo elettrico FG7OR 5G35mmq | IT. No. | |
| Art. n. | 3h | m |
| 58 | FURNISHING AND INSTALLATION ELECTRICAL CABLE NO7V-K 1x1,5mmq | |
| Fornitura e installazione di Cavo elettrico NO7V-K 1x1,5mmq | IT. No. | |
| Art. n. | 3i | m |
| 59 | FURNISHING AND INSTALLATION ELECTRICAL CABLE NO7V-K 1x2,5mmq | |
| Fornitura e installazione di Cavo elettrico NO7V-K 1x2,5mmq | IT. No. | |
| Art. n. | 3j | m |
| 60 | FURNISH AND INSTALL OF PVC PIPE - 20 DIAMETER | |
| Fornitura e posa in opera di tubo in PVC - diametro 20 mm | IT. No. | |
| Art. n. | 4k | m |
| 61 | FURNISH AND INSTALL OF PVC PIPE - 25 DIAMETER | |
| Fornitura e posa in opera di tubo in PVC - diametro 25 mm | IT. No. | |
| Art. n. | 4l | m |
| 62 | FURNISH AND INSTALL OF PVC PIPE - 32 DIAMETER | |
| Fornitura e posa in opera di tubo in PVC - diametro 32 mm | IT. No. | |
| Art. n. | 4m | m |
| 63 | FURNISH AND INSTALL OF PVC PIPE - 40 DIAMETER | |
| Fornitura e posa in opera di tubo in PVC - diametro 40 mm | IT. No. | |
| Art. n. | 4n | m |
| 64 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE FOR ALARM SYSTEM - 40 DIAMETER - ITEM COMPLETE JUNCTION BOX | |
| Fornitura e posa in opera di tubo in acciaio zincato per la predisposizione dell'impianto di allarme - diametro 40 mm | IT. No. | |
| Art. n. | 4o | m |
| 65 | FURNISHING AND INSTALLATION NEW TRAY CABLE 100x75mm | |
| Fornitura e posa in opera di nuovo canale metallico 100x75mm | IT. No. | |
| Art. n. | 5p | EA/NO |
| 66 | FURNISHING AND INSTALLATION NEW TRAY CABLE 150x75mm | |
| Fornitura e posa in opera di nuovo canale metallico 150x75mm | IT. No. | |
| Art. n. | 5q | EA/NO |
| 67 | FURNISHING AND INSTALLATION NEW TRAY CABLE 300x75mm | |
| Fornitura e posa in opera di nuovo canale metallico 300x75mm | IT. No. | |
| Art. n. | 5r | EA/NO |
| 68 | FURNISHING AND INSTALLATION NEW DATA RACK | |
| Fornitura ed installazione nuovo rack dati | IT. No. | |
| Art. n. | 6 | LS/AC |
| 69 | FURNISHING AND INSTALLATION n°2 COMMUNICATION OUTLET GROUP RJ45 cat,5e | |
| Fornitura e posa in opera di n°2 prese per telecomunicazioni RJ45 cat.5e | IT. No. | |
| Art. n. | 7 | EA/NO |
| 70 | FURNISHING AND INSTALLATION CAT.5e UTP, UNSHIELDED | |
| Fornitura e posa in opera di cavo UTP cat.5e, non schermato | IT. No. | |
| Art. n. | 8t | m |
| 71 | FURNISHING AND INSTALLATION UNEL RECEPTACLE COMPLEX, 230 VOLTS, N° 2X 10/16AMPS, 2P+G, WITH AUTOMATIC CIRCUIT BREAKER 3KA-16A-230V | |
| fornitura e posa in opera di n°2 prese UNEL, 230V 10/16A 2P+T, con int. automatico 3kA-16A-230V. | IT. No. | |
| Art. n. | 9u | EA/NO |
| 72 | FURNISHING AND INSTALLATION US RECEPTACLES COMPLEX WITH N°2 2x15A CB (120V), WITH AUTOMATIC CIRCUIT BREAKER 3KA-2X10A-230V | |
| Fornitura e posa in opera di n°2 prese USA, 120V 2P+Tx15A, con interruttore automatico 3kA, 2x10A. | IT. No. | |
| Art. n. | 9v | EA/NO |
| 73 | FURNISHING AND INSTALLATION |
ELECTRICAL WOKPLACE WITH:
#1 2PX16A CB (230 V SECTION)
#2 EUROPEAN RECEPTACLES
#1 2PX10A CB (120V SECTION)
#2 USA TYPE RECEPTACLES
#2 RJ45 CAT 5E DATA PLUGS
#1 SC CONNECTOR FOR F.O. CABLE (PREDISPOSITION)
INSTALLED ON WORKSTATIONS
Fornitura e posa opostazione di lavoro con:
no. 1 interruttore automatico 2px16a (sezione 230v)
no. 2 prese tipo europeo
no. 1 interruttore automatico 2px10a (sezione 120v)
no. 2 prese tipo americano
no. 2 prese rj45 cat 5e per dati
no. 1 connettore sc per cavo in f.o. (predisposizione) da prevedere direttamente sulla postazione lavoro
| IT. No. | ||
| Art. n. | 10w | EA/NO |
| 74 | FURNISHING AND INSTALLATION ELECTRICAL WOKPLACE WITH: |
#1 2PX16A CB (230 V SECTION)
#2 EUROPEAN RECEPTACLES
#1 2PX10A CB (120V SECTION)
#2 USA TYPE RECEPTACLES
#2 RJ45 CAT 5E DATA PLUGS
#1 SC CONNECTOR FOR F.O. CABLE (PREDISPOSITION)
ITEM WITH UNDERFLOOR VANISH SOCKET BOX
Fornitura e posa in opera postazione di lavoro (torretta a scomparsa) con:
no. 1 interruttore automatico 2px16a (sezione 230v)
no. 2 prese tipo europeo
no. 1 interruttore automatico 2px10a (sezione 120v)
no. 2 prese tipo americano
no. 2 prese rj45 cat 5e per dati
no. 1 connettore sc per cavo in f.o. (predisposizione)
| articolo completo di torretta a scomparsa | IT. No. | ||
| Art. n. | 10x | EA/NO | |
| 75 | FURNISHING AND INSTALLATION OF WALL FLUSHED POWER POINT FOR GENERAL USE. | ||
| Fornitura e posa in opera di punto di alimentazione generale. | IT. No. | ||
| Art. n. | 11y | EA/NO | |
| 76 | UPGRADE ELECTRICAL SYSTEM DAMAGE | ||
| Adeguamento impiantistico dell'impianto elettrico danneggiato | IT. No. | ||
| Art. n. | 11z | LS/AC | |
| 77 | FURNISHING AND INSTALLATION LIGHT POINT ADDED | ||
| Fornitura e installazione di Punto luce aggiunto | IT. No. | ||
| Art. n. | 12aa | EA/NO | |
| 78 | FURNISHING AND INSTALLATION NEW SENSOR POWER LIGHT - LUXOMAT PD3-1C TYPE | ||
| Fornitura e posa in opera di nuovo sensore di presenza per accensione luci - tipo luxomat pd3-1c | IT. No. | ||
| Art. n. | 12bb | EA/NO | |
| 79 | WALL FLUSHED LIGHT BUTTON OR SWITCH | ||
| Interruttore o pulsante sottotraccia | IT. No. | ||
| Art. n. | 12cc | EA/NO | |
| 80 | FURNISHING AND INSTALLATION AUTOFED LED EMERGENCY LIGHT -2H-220 LUMEN-IP65 | ||
| Fornitura e posa in opera di lampada di emergenza led autoalimentata - 2h-220 lumen-IP65 | IT. No. | ||
| Art. n. | 13dd | EA/NO | |
| 81 | FURNISHING AND INSTALLATION 1x8W (120 LUMEN) 2h EMERGENCY LED LAMP WITH PICTOGRAM TYPE PERMANENTLY | ||
| Fornitura e posa in opera di lampada di emergenza a led 1x8W (120 lumen) 2h con pittogramma sempre acceso. | IT. No. | ||
| Art. n. | 13ee | EA/NO | |
| 82 | FURNISHING AND INSTALLATION EXTERNAL FLOOD LED LIGHT - 17W - IP65 DISANO 1264 VEGA TYPE. | ||
| Fornitura e posa in opera di proiettore asimmetrico da esterno a LED 17W-IP65 tipo DISANO 1264 VEGA. | IT. No. | ||
| Art. n. | 13ff | EA/NO | |
| 83 | FORNISH AND INSTALL NEW ADJUSTED PEARLITIC CAST-IRON COVER AND ADJUSTED PEARLITIC CAST-IRON FRAME | ||
| Fornitura e posa in opera di nuovo chiusino in ghisa perlitica rettificata e telaio in ghisa perlitica rettificata | IT. No. | ||
| Art. n. | 14 | EA/NO | |
| 84 | GROUNDING PROTECTION SYSTEM EXTENSION - NEW EQUIPOTENTIAL BONDING | ||
| Estensione Impianto di messa a terra - nuovi collegamenti equipotenziali | IT. No. | ||
| Art. n. | 15 | LS/AC | |
| 85 | FURNISHING AND INSTALLATION CLASS I+II SPD IN ELECTRICAL PANEL | ||
| Fornitura e posa in opera di SPD di classe I+II all'interno di quadro elettrico | IT. No. Art. n. | 16 | EA/NO |
| 86 | FURNISHING AND INSTALLATION CLASS II SPD IN ELECTRICAL PANEL | ||
| Fornitura e posa in opera di SPD di classeII all'interno di quadro elettrico | IT. No. Art. n. | 17 | EA/NO |
| 87 | FURNISHING AND INSTALLATION CLASS III SPD IN ELECTRICAL PANEL OR ELECTRICAL EQUIPMENT | ||
| Fornitura e posa in opera di SPD di classe III all'interno di quadro elettrico o apparecchiatura elettrica | IT. No. Art. n. | 18gg | EA/NO |
| 88 | FURNISHING AND INSTALLATION CLASS III SPD FOR RACK DATA SYSTEM | ||
| Fornitura e posa in opera di SPD di classe III a servizio dell'impainto rack dati | IT. No. Art. n. | 18hh | LS/AC |
| 89 | TEST AND CERTIFICATION OF THE NEW ELECTRCYCAL SYSTEM. | ||
| Collaudo e certificazione del nuovo impianto elettrico | IT. No. | ||
| Art. n. | 19ii | LS/AC | |
| 90 | EXECUTION OF THE AS BUILT DRAWINGS AND SCHEDULES | ||
| Redazione ed emissione di disegni e schemi di As Built finali | IT. No. | ||
| Art. n. | 19jj | LS/AC | |
| TOTAL PART IV / Totale Parte IV |
| REPAIR WORK SUMMARY / Riepilogo Lavori di Ristrutturazione |
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS |
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK |
| PART III - MECHANICAL WORK |
| PART IV - ELECTRICAL WORK |
| TOTAL PRICE / Costo Totale |