Amend_0001.pdf
PDF 130 KB Posted
- Solicitation number
- FA5682-16-R-0038
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE_16-1039_CCEBD-100__MDT_R1_(1).xlsx | XLSX spreadsheet | |
| 2493_ASHE_16-1039_FAC_1342_AC1_ENG_100_binderR1.pdf | ||
| solicitation.pdf | ||
| Checklist.pdf | ||
| Design_Guides_Aviano.zip | ZIP file | |
| DWG_part_1.pdf | ||
| 2493_ASHE_16-1039_FAC_1342_AC1_ENG_100_binder.pdf | ||
| DWG_part_3.pdf | ||
| ashe_16-1039_-_planimetria_di_cantiere.pdf | ||
| ASHE_16-1039_CCEBD-100_.xlsx | XLSX spreadsheet | |
| ADDITIONAL_REQUIREMENTS_(under_150K)_12_August.doc | DOC document | |
| DWG_part_2.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
The purpose of this amendment is to make changes as indicated below and in the following pages:
Section A/Standard Form 1442, block 13A: change the closing date for receipt of offers.
Section A/Standard Form 1442, block 13D: change the number of days for Government acceptance of offers.
Section B/extended description of item 0001 and Section J/Attachment 1: Replace Technical Specifications with Technical Specifications Revision 1.
Section K: add one provision Section L, provision L-01 Offer Preparation Instructions, paragraphs (b) and (d): replace the Construction Cost Estimate Breakdown with the Construction Cost Estimate Breakdown Revision 1
31 CONS LGC - FA5682
VIA PORDENONE 89/B, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
AVIANO (PN) 33081
See Item 6
J
F1F3A26210A003
FA5682-16-R-0038
ASHE 16-1039
1 4
09/07/2016
08/18/2016
FA5682-16-R-0038
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Sep-2016 04:00 PM to 14-Sep-2016 04:00 PM.
The offeror acceptance period has decreased by 6 from 22 to 16.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
To:
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT,MATERIALS, TRANSPORTATION,
SUPERVISION AND ANY OTHERNECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED
ATTHE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITHTHE TERMS AND CONDITIONS
OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:
A. TECHNICAL SPECIFICATIONS REVISION 1 PROJECT ASHE 16-1039 EIC-RENOVATE FAC. 1342 FOR
606 ACS BED DOWN AREA F, AVIANO AB, ITALY - DATED AUG 16 AND MARKED 100% FINAL
- 306 WRITTEN PAGES INCLUDING COVER PAGE, WORK SITE LAYOUT AND BUILDING ACCEPTANCE
CHECKLIST
B. DRAWINGS
- 28 SHEETS
C. AVIANO DESIGN GUIDE 2011 REVISION
- 317 WRITTEN PAGES
D. ADDITIONAL REQUIREMENTS DATED 12 AUGUST 2016
- 4 WRITTEN PAGES
The CLIN extended description has changed from:
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT,MATERIALS, TRANSPORTATION,
SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED ATTHE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITHTHE TERMS AND
CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:
A. TECHNICAL SPECIFICATIONS PROJECT ASHE 16-1039 EIC-RENOVATE FAC. 1342 FOR 606 ACS BED
DOWN AREA F, AVIANO AB, ITALY - DATED AUG 16 AND MARKED 100% FINAL
- 306 WRITTEN PAGES INCLUDING COVER PAGE, WORK SITE LAYOUT AND BUILDING
ACCEPTANCE CHECKLIST
B. DRAWINGS
- 28 SHEETS
C. AVIANO DESIGN GUIDE 2011 REVISION
- 317 WRITTEN PAGES
D. ADDITIONAL REQUIREMENTS DATED 12 AUGUST 2016
- 4 WRITTEN PAGES
Technical Specifications Revision 1 Project ASHE 16-1039 EIC-Renovate Fac. 1342 for 606 Acs Bed Down Area F, Aviano AB, Italy - Dated Aug 16 And Marked 100% Final
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS
The following documents are attachments to this document and are an integral part hereof:
a. Attachment 1:
FA5682-16-R-0038
- 306 Written Pages Including Cover Page, Work Site Layout And Building Acceptance Checklist
b. Attachment 2:
Drawings
- 28 Sheets
c. Attachment 3:
Aviano Design Guide 2011 Revision
- 317 Written Pages
d. Attachment 4:
Additional Requirements dated 12 August 2016 - 4 Written Pages
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
The following have been added by full text:
52.204-20 Predecessor of Offeror (JUL 2016)
(a) Definitions. As used in this provision--
Commercial and Government Entity (CAGE) code means--
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.
Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [____] is or [____] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code: ____ (or mark “Unknown”).
Predecessor legal name: ____.
(Do not use a “doing business as” name).
(End of provision)
2. TECHNICAL ACCEPTABILITY
Submit current SOA certification for category OG01 and/or OG10 and classification adequate to cover offeror’s amount for project performance.
L-02. CURRENCY
All prices in response to this solicitation will be in Euro currency.
L-03. OFFER DOCUMENTATION
All offer documentation in response to this solicitation may be submitted in either the host nation language (Italian) or in the English language.
L-04. OFFER SUBMISSION INSTRUCTIONS
Offers in response to this solicitation shall be submitted to reach the issuing office indicated at page 1 of the solicitation, Standard Form 1442 block 7, by date and time specified in block 13A of the Standard Form 1442.
(End of Summary of Changes)
FA5682-16-R-0038
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
L-01. OFFER PREPARATION INSTRUCTIONS
To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.
The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:
1. PRICE OFFER
(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442 In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown - Revision 1 form. The extended amount must equal the whole Euro unit price multiplied by the number of units.
(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 4, "Additional Requirements”.
(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown
- Revision 1 shall be returned in their entirety.
| Amendment 0001.pdf |
| Blank Page |
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .