ASHE_15-1049_SUSTAIN_FAC._1412.pdf
PDF 423 KB Posted
- Solicitation number
- FA5682-16-R-0035
About this file
Technical Specifications ASHE 15-1049
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDITIONAL_REQUIREMENTS_(under_150K)_12_August.doc | DOC document | |
| ASHE__15-1049_Submittals.doc | DOC document | |
| Solicitation.pdf | ||
| ASHE_15-1049_SUSTAIN_FAC._1412_Rev_.pdf | ||
| ASHE_15-1049_Blank_Construction_Cost_Estimate_Breakdown.xls | XLS spreadsheet | |
| 1412_Floor_Plan.pdf | ||
| Section_OF_Master_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASHE 15-1049 Technical Specifications DATE: JUNE 2016 (1 Attachment)
31CES/CENMP 1
DATE: JUNE 2016
U.S. AIR FORCE
31ST FIGHTER WING
31ST CES/CENMP
AVIANO AIR BASE, ITALY
TECHNICAL SPECIFICATIONS
ASHE 15-1049
SUSTAIN DINING FACILITY BLDG. 1412, AREA F
AVIANO AB, ITALY
31CES/CENMP 2
1. SCOPE OF WORK. The Contractor shall provide all management, tools, supplies, equipment, transportation, scaffolding and qualified personnel necessary to sustain La Dolce Vita Dining Facility, Bldg. 1412, with the following works: close with windows the existing roof skylights on North East- South East of the facility; reseal all structural joints around the external perimeter of the entire facility; repair the internal damaged plaster/paint in many rooms, thus the application of dehumidifying insulating panel made of pure calcium silicate and an adequate silicate paint. In addition, the contractor shall install an addition downspout and box in the South West corner of the facility (chiller area).
Contractor shall store their materials in designated areas as specified by the Project Inspector or Representative. Period of performance shall be 90 calendar days to allow for material procurement, work completion and clean up. Contractor work, inside the facility, shall be performed in three (3) phases in order do not affect normal activities of the La Dolce Vita Dining Facility.
2. WORK LOCATION: Bldg. 1412, Area F, Aviano Air Base, Italy.
31CES/CENMP 3
3. WORK SITE CONDITIONS
a. Before works start, Contractor in coordination with the facility manager will provide a detailed work schedule to be approved by C.O.
b. Before works start, Contractor in coordination with the project manager will provide a detailed plan for each phase to be approved by C.O.
c. The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.
d. Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 08.00 to 17.00 hours. Work during weekends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring weekend and holiday work are not valid or for security or other necessities.
e. Toilet facilities in the vicinity of the work site shall be available for Contractor use. The Contractor shall use facilities in a manner to maintain their state of cleanliness and hygiene.
f. The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.
g. The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety. At all times the Contractor will assure all personnel are wearing the correct safety equipment when performing their work, such as steel toe boots, gloves, reflective gear and any other equipment deemed necessary to perform their work in the safest form. The Contractor shall also assure all personnel comply with Italian laws DM. 81/08.
h At least 7 days prior to the pre-final inspection, the Contractor shall furnish to the Contracting Officer all installed equipment operation and maintenance documentation, certificates concerning installed systems as required by host country laws.
4. GENERAL NOTES
1. At the end of the work, the Contractor shall provide the Government with three copies of the following documents: for warranty call purpose, 3 copies of letter identifying project number, item, company address, phone number, point of contact, item warranty expiration date, etc. One copy of the letter will be installed next the item for immediate consultation.
2. It will be contractor responsibility to protect with polyethylene sheets all kitchen equipment and dining room furniture. Furthermore contractor shall maintain the area clean as much as possible and remove resulting material daily.
3. Offerors will submit Material Technical data with the proposal documentation.
31CES/CENMP 4
5. WORK DESCRIPTION
Each item of the schedule is inclusive of furnishing and installation of materials and equipment, scaffolding, transportation to dump or storage of demolished and/or removed materials, in accordance with contracting officer's instructions and all finishing work required to make each item complete in a workmanlike manner.
All the quantities that are indicated or successively added are estimates. Therefore the government shall be not held responsible for the accuracy of the estimated quantities. The contract requires a completed project on a lump sum basis. It is therefore the responsibility of the contractor to calculate, foresee and perform all quantities and work necessary even if not mentioned in the specifications but included in the drawings and/or are manifested, in order to deliver a complete project based on its overall scope.
5.1 Removal of existing brown color hard wood chair rail, 10 cm height, in the rooms 023-023a-023b-
007 to allow the installation of dehumidifying calcium silicate panel. Item includes complete removal of the panel, loading and transportation of resulting material to authorized dump site, dumping fees and any other job to give a work performed in a workmanlike manner.
77.50 L.M.
5.2 Provide manpower, equipment and material to remove existing joint sealant on all exterior vertical structural joints and on horizontal joints between exterior terrace pavement and perimeter walls.
Item includes cleaning of the joints, scaffolding, supply and installation of paintable, waterproof, polyurethane sealant type SikaHyflex®-250 Facade or equivalent. Provide installation according to manufacturer application instructions.
340 L.M.
5.3 Furnish and installation of insulating panel made of pure calcium silicate, having an high dehumidifying power, good thermal conductivity of W/mk 0,053 , 800 Kg/Cum absorption capacity, antiseptic insulating panel (ph 12, which prevent mold formation) type Rofix Renopur- I 060 Isolante, thickness 2.5 cm or similar approved. The panel installation process will be performed as follow:
• Insulating panels shall be preferably 100% covered (or at least 70% minimum coverage) by means of a toothed trowel with Rofix Renopor Collante e Rasante specifico (glue and leveling) consisting of slaked lime, hydraulic binders and marble aggregates, 0-1.0 mm granulometric curve, 15.0 N/Sqmm compressive strength at 28 days.
• Panels shall be installed staggered and separated from the floor with application of Rofix Nastro di guarnizione BG2 (seal). Panel joints can be sealed with Rofix Renopor Collante e Rasante up to 1-3 mm thick. Recommend to join them accurately. Dowels shall not be used to anchor panels to avoid thermal bridges
• Panel reinforcing. Rofix Renopor Collante e Rasante shall be applied on the entire surface. The product consists of slaked lime, hydraulic binders and marble aggregates, 0-
1.0 mm granulometric curve, 15.0 N/Sqmm compressive strength at 28 days. To be applied 3 mm thick by means of toothed trowel. Reinforcement mesh P50 will be installed in order to prevent surface cracks formation.
31CES/CENMP 5
• Execution of mineral finish with powder pre-mixed mortar ROFIX 345 consisting of slaked lime, hydraulic binders and marble aggregates 0-0.8 mm granulometric curve, 2.0 N/Sqmm compressive strength at 28 days. Two coats of product shall be applied on a pretreated surface. Application must be with steel trowel and sponge trowel. Painting shall be performed after 1 week curing.
Panels installation shall be performed in the rooms showed in the attached drawing A-1. Existing mold patches must be previously treated with ROFIX Alghicida and then removed with a brush.
Irregularities of the existing support, of a certain entity, shall be leveled with “Rofix Renoplus Rasante” for restoration ( up to 3 cm thick in a single layer).
175.00 m²
5.4 Application of two coats of Rofix PI 262 OKOSIL PLUS “Pittura ai silicati” (silicate paint), potassium aluminum silicate based, acid resistant, or equivalent, ideal for conservative restoration in conformity with DIN 18363 EN 13300. The product shall be applied by brush or roll on a prepared surface. Silicate must be thinned only with silicate (never with water). Recommend using Rofix PP 201 Silica LF (silicate thinner).
The following are the rooms that need to be painted:
Rooms 001-002-013-023a-023b-023: walls and ceilings Rooms 015-027-021-008-009-010-028: only walls – no ceiling Room 007 : paint only walls and columns until the height of 3.40 mt from the floor.
1900.00 m²
5.5 Furnish and installation of roof closing, in both building entrance, for twelve (12) skylights as shown on the attached drawing (A-1) and having the following dimensions:
4 ski lights dim: 1.10 x 2.70 mt 4 ski lights dimension approx. : 1.45 x1.10 mt 2 ski lights dimension approx. : 1.90 x1.10 mt 2 ski lights dimension approx. : 1.30 x1.10 mt Item will includes:
Extruded structural factory coated with polyester powder aluminum, thermal cut profile Type Metra NC65 STH or similar approved. Color will be selected by Project Manager.
Thermo-pane glazing unit will be composed by:
-Stratified glass internal side 3+3 mm with pvb 0.38 mm thick low emissive, -Air gas 15 mm thick saturated with argon, -External self-cleaning tempered glass, 6 mm thick, type Saint Gobain, Bioclean SC II or equivalent.
Contractor will have to provide civil assistance, removal of existing metal flashing, S235 metal frame, counter frame, new metal flashing 8/10 thickness, fasteners, painting touch –up, scaffolding, lifting equipment and any necessary item to provide a work performed in a workmanlike manner and in a safety condition.
25.50 m²
5.6 Furnish and installation of beech wooden strip (listello), L shape, dimensions 35x45 mm, thickness 5 mm, to be installed all along the top of dehumidifying ROFIX panel. Item includes glue, nails, special shape pieces, cleaning and any other operation to give a job performed in a workmanlike manner.
144.50 L.M.
31CES/CENMP 6
5.7 Furnish and installation of new 8/10 thickness downspout, dia. 120 mm., 4.00 length, color dark brown, in the south west corner of building just in front of the chiller area. Item includes modification of existing metal flashing, furnish and installation of metal pre-painted box, having dimensions approx. 40x25x25 cm, thickness 8/10, new concrete splash block, fastenings, supports and any other operation to give a job performed in a workmanlike manner.
L.S.
5.8 Contractor shall use proper scaffolding, platforms and lifting equipment to perform works on exterior and interior of the facility due to the height of the areas that needs to be painted and for roof skylights works. At all times, the contractor shall adhere to proper safety procedures where scaffolding has been set up and for all personnel that are working in the immediate area to wear the proper safety equipment at all times.
L.S.
PHOTO OF INTERIOR OF THE FACILITY
ROOM 023 ROOM 023
31CES/CENMP 7
ROOM 023 ROOM 021
SKYLIGHTS TO BE CLOSED
31CES/CENMP 8
6. APPLICABLE TECHNICAL SPECIFICATIONS
The following Sections of the Master Specifications for construction projects of the Air Base in Aviano (PN), Italy, dated November 2005 and applicable modifications shall be applicable to the present project, together with the List of Work Items to be performed:
01100 GENERAL CONDITIONS
01101 PROJECT SIGN
05500 METAL FABRICATIONS
07600 07920 08520 08800
FLASHING AND SHEET METAL
JOINT SEALANTS
ALUMINUM WINDOWS
GLAZING
09900 PAINTS AND COATINGS
DATE: JUNE 2016
File details come from the government source that posted it. Updated .