ASHE_15-1049_Blank_Construction_Cost_Estimate_Breakdown.xls
XLS spreadsheet 90 KB Posted
- Solicitation number
- FA5682-16-R-0035
About this file
Construction Cost Estimate Breakdown
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDITIONAL_REQUIREMENTS_(under_150K)_12_August.doc | DOC document | |
| ASHE__15-1049_Submittals.doc | DOC document | |
| Solicitation.pdf | ||
| ASHE_15-1049_SUSTAIN_FAC._1412_Rev_.pdf | ||
| ASHE_15-1049_SUSTAIN_FAC._1412.pdf | ||
| 1412_Floor_Plan.pdf | ||
| Section_OF_Master_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
ASHE 15-1049
| CONSTRUCTION COST ESTIMATE BREAKDOWN | PAGE 1 OF1 | ||||||||
| SUSTAIN DINING FACILITY, BLDG 1412 | |||||||||
| PURCHASE REQ. NO. | Project ASHE 15-1049 | WORK LOCATION : AREA F, AVIANO AIR BASE | |||||||
| Line | ITEM | Unit | Quantity | Material cost + Labor Cost | |||||
| no. | of | Unit | Total | Man | Average | Total | Line total | ||
| measure | Hours | rate | |||||||
| 5.1 | Removal and disposal of existing chair rail, 10 cm height | LM/ML | |||||||
| 5.2 | Perform joints sealant | LM/ML | |||||||
| 5.3 | Furnish and installation of dehumidifying calcium silicate panel | SM/MQ | |||||||
| 5.4 | Application of two coats of silicate paint | SM/MQ | |||||||
| 5.5 | Funrnish and installation of aluminum profiles and glazing for closing existing roof skylights | SM/MQ | |||||||
| 5.6 | Furnish and installation of beech wooden strip (listello), L shape 35x45 mm., 5 mm thick | LM/ML | |||||||
| 5.7 | Furnish and installation of 8/10 downspout, dia. 120, 4 mt. length, metal box and modification of existing flashing | L.S./AC | |||||||
| 5.8 | Scaffolding | LS/AC | |||||||
| Total Cost |
Sheet1
| FOR GOVERNMENT USE ONLY | ||||||||||||
| SABER PROJECT GOVERNMENT CONSTRUCTION COST ESTIMATE BREAKDOWN | PAGE 1 OF | |||||||||||
| CONTRACT FOR | ||||||||||||
| PURCHASE REQ. NO. | SABER PROJECT # | WORK LOCATION | ||||||||||
| Line | UPB | ITEM | Unit | Quant. | Material cost | |||||||
| no. | CODE | of | Unit | c. | Total | Man | Average | c. | Total | Line total | ||
| me. | Hours | rate | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 | ||||||||||
| 0 | 0 | 0 |
Sheet3
File details come from the government source that posted it. Updated .