ASHE_11-1044_Blank_Cost_Est.xls

XLS spreadsheet 107 KB Posted

Attached to
ASHE 11-1044 SUSTAIN STAIRWELLS COMM FAC. 1442, AREA F, AVIANO AB, ITALY
Solicitation number
FA5682-16-R-0030
Issued by

View the file

Other files

File Type Posted
Solicitation.pdf PDF
ASHE_11-1044_SUSTAIN_STAIRWELLS_COMM_FAC._1442.pdf PDF
ADDITIONAL_REQUIREMENTS_(under_150K)_1_August.doc DOC document
01100_en.pdf PDF
09310_en.pdf PDF
01101_en.pdf PDF
05500_en.pdf PDF
Attachment__1.pdf PDF
09900_en.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASHE 16-5001

CONSTRUCTION COST ESTIMATE BREAKDOWNPAGE 1 OF1
SUSTAIN STAIRWELLS COMM. FACILITY 1442
PURCHASE REQ. NO.Project ASHE 11-1044WORK LOCATION : AREA F, AVIANO AIR BASE
LineITEMUnitQuant.Material cost
no.ofUnitTotalManAverageTotalLine total
me.Hoursrate
5.1Furnish and installation of acoustical-thermal insulation system package type ROFIX LIGHT FIRESTOP 036 or equivalent,SQ.M./MQ
5.2Provide manpower, material and equipment to remove, modify and re-install 9 lighting fixtures, 6 outlets, metal handrails, sprinkler heads and piping.LS/AC
5.3Furnish and installation of new ceramic baseboard, 10 cm height and removal/disposal of existing one.LM/ML
5.4ScaffoldingLS/AC
Total Cost€

Sheet2

Sheet1

FOR GOVERNMENT USE ONLY
SABER PROJECT GOVERNMENT CONSTRUCTION COST ESTIMATE BREAKDOWNPAGE 1 OF
CONTRACT FOR
PURCHASE REQ. NO.SABER PROJECT #WORK LOCATION
LineUPBITEMUnitQuant.Material cost
no.CODEofUnitc.TotalManAveragec.TotalLine total
me.Hoursrate
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000

Sheet3

File details come from the government source that posted it. Updated .