FA5682-16-R-0029_Amendment_0001.pdf

PDF 102 KB Posted

Attached to
ASHE 16-1038 RENOVATE FAC 1335 FOR 606 ACS BED DOWN, AVIANO AB
Solicitation number
FA5682-16-R-0029
Issued by

About this file

Solicitation FA5682-16-R-0029_Amendment 0001

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE

PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

FA5682

The purpose of this amendment is to make changes as indicated below and in the following pages:

Section A/SF1442 Block 13A: change the closing date for receipt of offers;

Section A/SF1442 Block 13D: change the number of days for Government acceptance of offers;

Section B/extended description of item 0001 and Section J/attachment 1: Incorporate Addendum #1 to the Technical Specifications.

Section K: add one provision section L, provision L-01 Offer Preparation Instructions, paragraphs (b) and (d): replace Construction Cost Estimate Breakdown.

31 CONS/LGC - FA5682

VIA PORDENONE 89/B, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

AVIANO (PN) 33081

See Item 6

J

F1F3A26210A002

FA5682-16-R-0029

ASHE 16-1038

1 4

09/07/2016

08/19/2016

FA5682-16-R-0029

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 8-Sept-2016 04:00 PM to 13-Sept-2016 04:00 PM.

The offeror acceptance period has decreased by 5 from 22 to 17.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN: A. TECHNICAL SPECIFICATIONS R1 PROJECT ASHE 16-1038 EIC - RENOVATE

FAC 1335 FOR 606 ACS BED DOWN, AREA F, AVIANO AB, ITALY DATED AUGUST 16 - 368 PAGES

INCLUDING COVER PAGE, SCHEDULE OF MATERIAL SUBMITTALS, APPLICABLE SECTIONS OF THE

MASTER TECHNICAL SPECIFICATIONS AND FACILITY SYSTEMS FUNCTIONAL TEST CHECKLIST

B. ASHE 16-1038 DRAWINGS - 28 SHEETS

to

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN: A. TECHNICAL SPECIFICATIONS R1 PROJECT ASHE 16-1038 EIC - RENOVATE

FAC 1335 FOR 606 ACS BED DOWN, AREA F, AVIANO AB, ITALY DATED AUGUST 16 AND

ADDENDUM #1 DATED SEPTEMBER 16 - 370 PAGES INCLUDING COVER PAGE, SCHEDULE OF

MATERIAL SUBMITTALS, APPLICABLE SECTIONS OF THE MASTER TECHNICAL SPECIFICATIONS,

FACILITY SYSTEMS FUNCTIONAL TEST CHECKLIST AND ADDENDUM #1

B. ASHE 16-1038 DRAWINGS - 28 SHEETS

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are attachments to this document and are an integral part hereof:

a. Attachment 1:

Technical Specifications R1 Project ASHE 16-1038 EIC-Renovate Fac. 1335 for 606 ACS Bed Down Area F, Aviano AB, Italy - dated August 16 and marked submittal 100% and Addendum#1 dated September 16

- 370 written pages including cover page, Schedule of Material Submittals, applicable sections of the Master

Technical Specifications, Facility Systems Functional Test Checklist and Addendum#1

b. Attachment 2:

Project ASHE 16-1038 Drawings

- 28 sheets

c. Attachment 3:

Additional Requirements, dated August 2016

- 3 written pages

d. Attachment 4:

Aviano AB Design Guide 2011 Revision including Annexes

- 317 written pages

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

The following provision has been added:

52.204-20 – Predecessor of Offeror (JUL 2016)

(a) Definitions. As used in this provision—

“Commercial and Government Entity (CAGE) code” means—

(1) An identifier assigned to entities located in the United States and its outlying areas by the Defense Logistics

Agency (DLA) Contractor and Government Entity (CAGE) Branch to identify a commercial or government entity, or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that DLA

Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.

“Successor” means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.

(b) The Offeror represents that it [ ] is or [ ] is not a successor to a predecessor that held a Federal contract or grant within the last three years.

(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):

Predecessor CAGE code: ________ (or mark “Unknown”).

Predecessor legal name: ______________________________.

(Do not use a “doing business as” name).

(End of provision)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

L-01. OFFER PREPARATION INSTRUCTIONS

To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.

The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:

1. PRICE OFFER

(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation

Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown R form. The extended amount must equal the whole Euro unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J Attachment 3

“Additional Requirements”.

(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate

Breakdown R shall be returned in their entirety.

2. TECHNICAL ACCEPTABILITY.

Qualification Certification:

Submit current SOA certification for category OG01 and/or OG11 and classification adequate to cover offeror’s proposed amount for project performance.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .