ADDENDUM 1 PROJECT ASHE 16-1032

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project ASHE 16-1032 - Addendum #1

PROJECT ASHE 16-1032

EIC-RENOVATE FAC. 1174 FOR 606th ACS BED DOWN, AREA F

AVIANO AB, ITALY

TECHNICAL SPECIFICATIONS

Addendum #1

New Construction Works

1) New Construction Works, Part IIa - Architectural Work, Item 5. Change reference to surface of the existing industrial concrete floor to read 1,834.63 Sq.m. Floor resin will be installed in rooms 1/1a./12/20. Installation of resin in construction joints is included.

124.63 Sq.m.

2) New Construction Works, Part IIa - Architectural Work, Item 8. Furnishing and installation of safety devices on roof include installation of steel rope.

Repair Works

3) Repair Works, Part IIIc - Fire Protection System, Item 4. Preassembled fire room is shown on Drawing C-4 General Site Plan and Drawing M-10. Construction of the fire room shall be adequate for the dimensions and weight of the mechanical equipment to be installed and in compliance with the regulations.

Sustainment Works

Existing roof condition

Existing roof side drainage channel condition

Existing lower roof condition

Existing side windows condition

Existing drain pipe

4) Removal and reinstallation of LPS system on higher part of the roof.

L.S.

5) Furnishing and installation of bituminous membrane 3 mm thickness above the existing one, in water collection channels. Item includes cleaning of the existing membrane, overlap, 60 cm on wall and 100 cm on existing concrete roof tiles (total development 210 cm) and installation of new leaf guard.

300.00 Sq.m.

6) Sealing interior PVC drain pipes that connect the water discharge channels to external downspouts. Item includes estimated 30% of drain pipes replacement.

7) Furnishing and installation of steel sandwich panels (top roof), thickness 60 mm, color grey, installed on existing concrete roof tiles anchored to steel brackets fixed in advance to roof structure. Item includes all hardware and ridge roof.

2,200.00 Sq.m.

8) Cleaning and installation of elastomeric sealing of all windows, between frame and glazing and frame and exterior wall.

9) Supply and installation of hot deep galvanized fall protection life line, including safety anchors, wire, accessories, and hot deep galvanized metal ladder for roof access, as requested by Italian Law D.M. 81/2008. Item includes submission of all certification documents and shop drawings.

10) Sustainment Works, Part Ia - Architectural Demolitions, Item 9b. Item considers demolition of 15% of the plaster for the exterior surfaces (corresponding to a quantity of 30 Sq.m.). Same for Part IIa - Architectural Works, Item 3.

11) Sustainment Works, Part IIa - Architectural Work, Item 11b. Change number of doors type “D5” to read 5 EA, as showed on Drawings A-13/A-14.

1.00 EA

12) Sustainment Works, Part IIa - Architectural Work, Item 13. Change dimensions of door Type “D2” to read 100x190 cm, as shown in Cost Estimate and Drawing A-16.

Maintenance Works

13) Maintenance Works, Part IIa - Architectural Work, Item 2. Change quantity of exterior painting, lowest part of the builing, to read 390.00 Sq.m.

130.00 Sq.m.