ASHE_16-1048_CNS_Cost_Est_Blank.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Replace Perimeter Lights Area F Armory & Area G & Sierra Loop and Zulu Loop, Area F, Aviano AB, italy
- Solicitation number
- FA5682-16-R-0021
About this file
ASHE 16-1048 Construction Cost Estimate Breakdown
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE_16-1048_Technical_Specifications_July_2016_Revision__2.pdf | ||
| Amendment_FA5682-16-R-0021-0001_dated_19_Jul_2016.pdf | ||
| ASHE_16-1048_Technical_Specifications_July_2016_Revision__1.pdf | ||
| ASHE_16-1046_Technical_Specifications_July_2016_Revision__1.pdf | ||
| ADDITIONAL_REQUIREMENTS_06_July_2016.doc | DOC document | |
| FA5682-16-R-0021.pdf | ||
| LIGHT_PLAN_SIERRA_ _ZULU.pdf | ||
| ASHE_16-1046_CNS_Cost_Est_blank.xlsx | XLSX spreadsheet | |
| ASHE_16-1046_Technical_Specifications_June_2016.doc | DOC document | |
| ASHE_16-1046_POLES_TABLE_June_2016.xlsx | XLSX spreadsheet | |
| ASHE_16-1048_Technical_Specifications_June_2016.doc | DOC document | |
| ASHE161048_-POLES_TABLE_June_2016.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASHE 16-1048
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPLACE PERIMETER LIGHT FIXTURES AREA F SIERRA LOOP AND ZULU LOOP | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 16-1048 | AREA F SIERRA AND ZULU LOOP Aviano AB ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| WORK ITEMS | ||||||||||
| SIERRA AND ZULU |
| 1 | REMOVAL | IT. No. Art. n. | 4.1a | EA/Pezzi | 127 |
| 2 | REINSTALLATION | IT. No. Art. n. | 4.1b | EA/Pezzi | 127 |
| TOTAL PROJECT/TOTALE PROGETTO |
$0.00