ASHE16-1001_CNS_cost_est_blank.xls

XLS spreadsheet 248 KB Posted

Attached to
ASHE 15-1000 MAINTAIN AIRFIELD MARKINGS NORTH, AREA F, ASHE 16-1001 MAINTAIN ROAD MARKINGS, AREA F AND 1, AVIANO AB, ITALY
Solicitation number
FA5682-16-R-0019
Issued by

About this file

Construction Cost Estimate Breakdown

View the file

Other files

File Type Posted
ASHE_15-1000_REV_1_Tech._Specifications.pdf PDF
Attach___5_REV_1_Maps.pdf PDF
Attach___4_ASHE15-1000_REV._1_Signs.pdf PDF
Amendment_0001.pdf PDF
solicitation.pdf PDF
ADDITIONAL_REQUIREMENTS_(under_150K)_1_July.doc DOC document
Attach___4_ASHE_15-1000_Signs.pdf PDF
Attach___6_ASHE_15-1000.xls XLS spreadsheet
Attach__1_ASHE16-1001.pdf PDF
ASHE_16-1001_Tech_Spec.pdf PDF
Attach.___2_ASHE16-1001.pdf PDF
Attach___2_Specifications_of_paint_application.pdf PDF
ASHE_15-1000_Tech._Specs..pdf PDF
Attach.___3_ashe16-1001.xls XLS spreadsheet
Attach___5_Maps.pdf PDF
Attach___3_Pavement_markings_02761.pdf PDF
Attach___1_Markings_specifications.pdf PDF
ASHE15-1000_CNS_cost_est_blank.xls XLS spreadsheet
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASHE16-1001

CONSTRUCTION COST ESTIMATE BREAKDOWN
MAINTAIN ROAD MARKINGS AREA F AND AREA 1, AVIANO AB, ITALY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 16-1001AIRFIELD, AREA F
MATERIAL and LABOR COSTSLABOR COSTS
LINE ITEM NO.ITEM (1)UNIT OF MEASURE (2)QUANTITY (3)UNIT (4)TOTAL (5)MANHOUR MANDAYS (6)AVERAGE RATE (7)TOTAL (8)OTHER DIRECT COSTS (9)LINE TOTAL (10)
SURFACE PREPARATION
1AREA F, CLEANING, REMOVAL OF DIRT / OLD PAINTIT. No.4.a1L.S.1€
2AREA 1, CLEANING, REMOVAL OF DIRT / OLD PAINTIT. No.4.a2L.S.1€
REFRACTIVE PAINTING, WHITE
3AREA F, 15CM WIDE BROKEN / CONTINUOUS LINEIT. No.4.b3Ln. Mt.16,950€
4AREA 1, 15CM WIDE BROKEN / CONTINUOUS LINEIT. No.4.b4Ln. Mt.500€
5AREA F, PARKING 12 CM WIDE CONTINUOUS LINEIT. No.4.b5Ln. Mt.150€
6AREA F, AREA TO PAINTIT. No.4.b6Sq. Mt.300€
REMOVE OBSOLETE PAINT
7AREA F, 15 CM WIDE CONTINUOS / BROKEN LINEIT. No.4.c7Ln. Mt.190€
8AREA F, AREA TO REMOVEIT. No.4.c8Sq. Mt.210€
9AREA 1, AREA TO REMOVEIT. No.4.c9Sq. Mt.10€
COLD PLASTIC BI-COMPONENT PAINTING
10AREA F, 15CM WIDE BROKEN / CONTINUOUS LINEIT. No.4.d10Ln. Mt.700€
11AREA F, AREA TO PAINTIT. No.4.d11Sq. Mt.300€
12AREA F, PEDESTRIAN CROSSINGSIT. No.4.d12Sq. Mt.416€
13AREA 1, PEDESTRIAN CROSSINGSIT. No.4.d13Sq. Mt.44€
VERTICAL SIGN RELOCATION
12AREA F, RELOCATE VERTICAL STOP SIGNSIT. No.5Each4€
TOTAL AREA F€
TOTAL AREA 1€
TOTAL AREA F AND AREA 1€

Sheet1

File details come from the government source that posted it. Updated .