ASHE15-1000_CNS_cost_est_blank.xls

XLS spreadsheet 250 KB Posted

Attached to
ASHE 15-1000 MAINTAIN AIRFIELD MARKINGS NORTH, AREA F, ASHE 16-1001 MAINTAIN ROAD MARKINGS, AREA F AND 1, AVIANO AB, ITALY
Solicitation number
FA5682-16-R-0019
Issued by

About this file

Construction Cost Estimate Breakdown

View the file

Other files

File Type Posted
ASHE_15-1000_REV_1_Tech._Specifications.pdf PDF
Attach___5_REV_1_Maps.pdf PDF
Attach___4_ASHE15-1000_REV._1_Signs.pdf PDF
Amendment_0001.pdf PDF
solicitation.pdf PDF
ADDITIONAL_REQUIREMENTS_(under_150K)_1_July.doc DOC document
Attach___4_ASHE_15-1000_Signs.pdf PDF
Attach___6_ASHE_15-1000.xls XLS spreadsheet
Attach__1_ASHE16-1001.pdf PDF
ASHE_16-1001_Tech_Spec.pdf PDF
Attach.___2_ASHE16-1001.pdf PDF
Attach___2_Specifications_of_paint_application.pdf PDF
ASHE_15-1000_Tech._Specs..pdf PDF
ASHE16-1001_CNS_cost_est_blank.xls XLS spreadsheet
Attach.___3_ashe16-1001.xls XLS spreadsheet
Attach___5_Maps.pdf PDF
Attach___3_Pavement_markings_02761.pdf PDF
Attach___1_Markings_specifications.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASHE15-1000

CONSTRUCTION COST ESTIMATE BREAKDOWN
MAINTAIN AIRFIELD MARKINGS NORTH, AREA F, AVIANO AB, ITALY
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 15-1000AIRFIELD, AREA F
MATERIAL and LABOR COSTSLABOR COSTS
LINE ITEM NO.ITEM (1)UNIT OF MEASURE (2)QUANTITY (3)UNIT (4)TOTAL (5)MANHOUR MANDAYS (6)AVERAGE RATE (7)TOTAL (8)OTHER DIRECT COSTS (9)LINE TOTAL (10)
SURFACE PREPARATION
1CLEANING, REMOVAL OF DIRT / OLD PAINTIT. No.4.aL.S.1€
REFRACTIVE PAINTING, YELLOW / WHITE
2YELLOW 6"/15CM WIDE BROKEN / CONTINUOUS LINEIT. No.4.b1Ln. Mt.30,500€
3NEW YELLOW 6"/15CM WIDE BROKEN / CONTINUOUS LINEIT. No.4.b2Ln. Mt.2,500€
4YELLOW 3' / 91 CM WIDE CONTINUOUS LINEIT. No.4.b3Ln. Mt.1,750€
5YELLOW AREA PAINTINGIT. No.4.b4Sq. Mt.600€
6NEW YELLOW AREA PAINTINGIT. No.4.b5Sq. Mt.400€
6WHITE 6"/15CM WIDE BROKEN / CONTINUOUS LINEIT. No.4.b6Ln. Mt.500€
6NEW WHITE 6"/15CM WIDE BROKEN / CONTINUOUS LINEIT. No.4.b7Ln. Mt.120€
6WHITE 50 CM WIDE CONTINUOUS LINEIT. No.4.b8Ln. Mt.300€
6NEW WHITE 50 CM WIDE CONTINUOUS LINEIT. No.4.b9Ln. Mt.500€
SEMI-REFRACTIVE PAINTING, RED
11RED 6"/15CM WIDE CONTINUOUS LINEIT. No.4.c10Ln. Mt.1,300€
12RED 50 CM WIDE CONTINUOUS LINEIT. No.4.c11Ln. Mt.100€
NON-REFRACTIVE PAINTING, BLACK
13NEW BLACK 15 CM WIDE CONTINUOS / BROKEN LINEIT. No.4.d12Ln. Mt.2,400€
14NEW BLACK AREA TO PAINTIT. No.4.d13Sq. Mt.1,500€
SIGNS
15DANGER SIGNS, 130X58 CMIT. No.4.e 14Each21€
16WARNING SIGNS, 51 X 38 CMIT. No.4.e 15Each10€
17ECP BOXESIT. No.4.e 16Each2€
18OPEN FUEL SIGNSIT. No.4.e 17Each3€
19PILOT BOXESIT. No.4.e 18Each11€
20STOP SIGNSIT. No.4.e 19Each6€
21NEW " STOP CHECK FOD" SIGNSIT. No.4.e 20Each13€
REMOVAL OF PAINT
22AREA TO REMOVE 150 - 200 CM WIDEIT. No.4.f 21Sq. Mt.1,600€
2345 / 50 CM WIDE CONTINUOUS LINES TO REMOVEIT. No.4.f 22Ln. Mt.400€
2415 CM WIDE CONTINUOUS LINES TO REMOVEIT. No.4.f 23Ln. Mt.300€
TEMPLETS
25CONSTRUCTION OF ALL SIGN TEMPLETSIT. No.4.gL.S.1€
0
TOTAL€

File details come from the government source that posted it. Updated .