ASHE 14-1011 REPAIR ELECTRICAL SYSTEM 3 PASs AT ZULU, AVIANO AB
Solicitation number
FA5682-15-R-0007
Issued by

About this file

ASHE 14-1011 COST ESTIMATE BREAKDOWN

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

new cnstr.

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ASHE 14-1011 RPR PASs ELEC SYS AT ZULU LOOP, B. 8010, 7910, 7870
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 14-1011B. 8010, 7910, 7870, AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.NEW CONSTRUCTION / Nuova Costruzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Work - Ia Lavori Architettonici
NOT APPLICABLE Non Applicabile
Total Architectural Work - Totale Lavori Architettonici0.000.000.000.00
Ib Structural Work - Ib Lavori Strutturali0.000.000.00
NOT APPLICABLE Non Applicabile
Total Structural Work - Totale Lavori Strutturali0.000.000.00
0.000.000.00
Ic Civil Work - Ic Lavori Civili0.000.000.00
NOT APPLICABLE Non Applicabile
Total Civil Work - Totale Lavori Civili0.000.000.00
Id Mechanical Work - Ic Lavori Meccanici
NOT APPLICABLE Non Applicabile
Total Mechanical Work - Totale Lavori Meccanici0.000.000.00
Ie Electrical Work - Ic Lavori Elettrici
NOT APPLICABLE Non Applicabile
Total Mechanical Work - Totale Lavori Meccanici0.000.000.00
TOTAL PART I - Totale Parte I0.000.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
NOT APPLICABLE Non Applicabile
0.000.000.00
Total Architectural Work - Totale Lavori Architettonici0.000.000.000.00
IIb Structural Work - IIb Lavori Strutturali0.000.000.00
NOT APPLICABLE Non Applicabile
Total Structural Work - Totale Lavori Strutturali0.000.000.000.00
IIc Civil Work - IIc Lavori Civili0.000.000.00
NOT APPLICABLE Non Applicabile
Total Civil Work - Totale Lavori Civili0.000.000.000.00
TOTAL PART II / Totale Parte II0.000.000.000.00
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
IIIa HVAC System - IIIa Impianto di Condizionamento
NOT APPLICABLE Non Applicabile
Total HVAC Systems - Totale Impianti HVAC0.000.000.000.00
PART IIIb - COMPRESSED AIR AND SPRINKLER SYSTEMS / PARTE IIIa - Impiant di aria compressa e sprinkler
NOT APPLICABLE Non Applicabile
Total Compressed air and sprinkler Systems - Totale Impianti di aria compressa e sprinkler0.000.000.000.00
TOTAL PART III / Totale Parte III0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte IV - Lavori Elettrici0.000.00
NOT APPLICABLE Non Applicabile
TOTAL PART IV / Totale Parte IV0.000.000.000.00
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ 0.00€ 0.00€ 0.00€ 0.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK€ 0.00€ 0.00€ 0.00€ 0.00
PART III - MECHANICAL WORK€ 0.00€ 0.00€ 0.00€ 0.00
PART IV - ELECTRICAL WORK€ 0.00€ 0.00€ 0.00€ 0.00
TOTAL PRICE / Costo Totale€ 0.00€ 0.00€ 0.00€ 0.00
$0.00$0.00$0.00$0.00

&RSheet &P of &N repair

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ASHE 14-1011 RPR PASs ELEC SYS AT ZULU LOOP, B. 8010, 7910, 7870
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 14-1011B. 8010, 7910, 7870, AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
B.REPAIR WORK / Lavori di Ristrutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Work - Ia Lavori Architettonici
1ASBESTOS REMOVAL. COMPLETE OF DUMP FEE

BLDG 8010, 7910, 7870

Rimozione amianto. Completo di oneri discarica.

Edifici 8010,7910, 7870IT. No. Art. n.1LS/AC
Total Architectural Work - Totale Lavori Architettonici
Ib Structural Work - Ib Lavori Strutturali
2PERFORATION METAL AND CONCRETE WALLS

BLDG 8010, 7910, 7870

Esecuzione di carrotaggi su pareti in metallo e calcestruzzo

Edifici 8010,7910, 7870IT. No. Art. n.1LS/AC
Total Structural Work - Totale Lavori Strutturali
Ic Civil Work - Ic Lavori Civili0.000.000.00
3Not Applicable

Non applicabile

Total Civil Work - Totale Lavori Civili0.000.000.00
0
Id Mechanical Work- Id Lavori Meccanici0.000.000.00
4Not Applicable

Non applicabile

Total Mechanical Work - Totale Lavori Meccanici0.000.000.000.00
Ie Electrical Work - Ie Lavori Elettrici0.000.000.00
5REMOVAL OF EXISTING ELECTRICAL AND COMMUNICATION SYSTEM. COMPLETE OF PUBBLIC DUMP FEE

BLDG 8010, 7910, 7870

Rimozione dell'impianto elettrico e dati esistente. Completo di oneri pubblica discarica.

Edifici 8010,7910, 7870IT. No. Art. n.1LS/AC
Total Electrical Work - Totale Lavori Elettrici0.000.000.000.00
TOTAL PART I / Totale Parte I0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural Work - IIa Lavori Architettonici
6Not Applicable

Non applicabile

Total Architectural Work - Totale Lavori Architettonici0.000.000.000.00
IIb Structural Work - IIb Lavori Strutturali0.000.000.00
7Not Applicable

Non applicabile

Total StructuralL Work - Totale Lavori Strutturali0.000.000.000.00
IIc Civil Work - IIc Lavori Civili0.000.000.00
8INSTALL DOOR SEALS

BLDG 8010, 7910, 7870

Installare nuove guarnizioni porta.

Edifici 8010, 7910, 7870IT. No. Art. n.1LS/AC
9SAND FLOOR SURFACE AND VACUUM
Pulizia meccanica delle superfici da trattare con resinaIT. No. Art. n.2am2
10PRIMER
Fornitura e posa di primerIT. No. Art. n.2bm2
11THREE-COMPONENT "CONTRO SPINTA"
Fornitura e posa di strato resina epossidica tri-componenteIT. No. Art. n.2cm2
12FIRST COAT OF RESIN AND ANTI-SKID CORUNDUM
Fornitura e posa di primo strato di trattamento della resinaIT. No. Art. n.2dm2
13SECOND COAT OF EPOXY RESIN
Fornitura e posa di secondo strato di trattamento della resinaIT. No. Art. n.2em2
14ANTI-SCRATCH OPAQUE FINISHING WITH CORUNDUM
Fornitura e posa di strato finale di trattamente della resinaIT. No. Art. n.2fm2
15ELASTIC JOINT SEAL
Fornitura e posa di giunto elestico di tenutaIT. No. Art. n.2gm
16COLORED STRIPING AND MARKING

BLDG 8010, 7910, 7870

Colorazione e marcatura delle superfici

Edifici 8010, 7910, 7870IT. No. Art. n.2hLS/AC
Total Civil Work - Totale Lavori Civili
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
PART IIIa - HVAC SYSTEMS / Parte IIIa -Impianti HVAC
17GALVANIZED SHEET METAL DUCT D.630mm, COMPLETE WITH SUCTION GRIDS, DUCT SUPPORTS AND ACCESSORIES
Canali in lamiera zincata D.630mm, completo di bocchette, staffaggi e accessoriIT. No. Art. n.1am
18EXHAUST AIR MOTOR - EXPLOSION PROOF
Estrattore fumi - CE ATEX Zona 1IT. No. Art. n.2EA/NO
19EXPULSION GRID
Griglia di esplulsione ariaIT. No. Art. n.3aEA/NO
20FINAL TEST MECHANICAL SYSTEMS. SUBMITTAL MECHANICAL WORK CERTIFICATIONS.

BLDG 8010, 7910, 7870

Verifica impianto meccanico . Sottomissione delle dichiarazioni di conformità DM 37/08.

Edifici 8010, 7910, 7870IT. No. Art. n.4LS/AC
Total HVAC Systems - Totale Impianti HVAC
PART IIIb - PLUMBING - COMPRESSED AIR - SPRINKLER SYSTEMS / PARTE IIIa - Impianti Idrico-sanitario - aria compressa - sprinkler
21Not Applicable

Non applicabile

Total Plumbing - Compressed air - Sprinkler Systems - Totale Impianti Idrico-Sanitario - Aria compressa - Sprinkler
TOTAL PART III / Totale Parte III
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici
22NEW MAIN BREAKER 4x160A IN THE EXISTING SUBSTATION BLDG #78030
Installazione nuovo int. 4x160A all'interno della cabina elettrica esistente n.78030IT. No. Art. n.1EA/NO
23EXISTING "MDP " ELECTRICAL PANEL - (ELECTRICAL CHANGE AND ADJUST)- BUILDINGS #7910 AND #7870
Quadro elettrico esistente "MDP" (modifiche elettriche ed adeguamento) - EDIFICIO N.7910 E N.7870IT. No. Art. n.2LS/AC
24"MDP" ELECTRICAL PANEL - EXPLOSION PROOF -BUILDING #8010
Quadro elettrico "MDP" tipo ATEX - EDIFICIO N.8010IT. No. Art. n.3aEA/NO
25"GEN" ELECTRICAL PANEL
Quadro elettrico "GEN"IT. No. Art. n.3bEA/NO
26MAIN PANEL FEEDER LINE FG7R-3x240+240N+240PENmmq
Linea di alimentazione generale FG7R-3x240+240N+240PEN mmqIT. No.4m
27ELECTRICAL CABLE FG7R 1x50mmq
Cavo elettrico FG7R 1x50mmqIT. No. Art. n.5am
28ELECTRICAL CABLE FG7OR 3G2,5mmq
Cavo elettrico FG7OR 3G2,5mmqIT. No. Art. n.5bm
29ELECTRICAL CABLE FG7OR 3G4mmq
Cavo elettrico FG7OR 3G4mmqIT. No. Art. n.5cm
30ELECTRICAL CABLE FG7OR 3G6mmq
Cavo elettrico FG7OR 3G6mmqIT. No. Art. n.5dm
31ELECTRICAL CABLE FG7OR 3G10mmq
Cavo elettrico FG7OR 3G10mmqIT. No. Art. n.5em
32ELECTRICAL CABLE FG7OR 5G6mmq
Cavo elettrico FG7OR 5G6mmqIT. No. Art. n.5fm
33ELECTRICAL CABLE FG7OR 4G10mmq
Cavo elettrico FG7OR 4G10mmqIT. No. Art. n.5gm
34ELECTRICAL CABLE FG7OR 7G1,5mmq
Cavo elettrico FG7OR 7G1,5mmqIT. No. Art. n.5hm
35ELECTRICAL CABLE FG7OR 10G1,5mmq
Cavo elettrico FG7OR 10G1,5mmqIT. No. Art. n.5im
36EXCAVATION FOR NEW CONDUITS
Scavo per nuove tubazioni interrateIT. No. Art. n.6m3
37EXCAVATION BY PIPE PERCUSSION
Scavo per nuove tubazioni interrateIT. No. Art. n.7m
38SUPPLY AND INSTALLATION AT SIGHT, OR DIGGING WITHIN WELLS, CONDUITS OF HIGH-DENSITY POLYETHYLENE "HDPE DIAM. 160
Fornitura e posa in opera a vista, entro cavedi o scavo, di cavidotti in polietilene alta densità "PEHD DIAM. 160IT. No.8m
39PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 100X100X150x10cm.
Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 100x100x150x10cm (dimensioni interne)IT. No.9aEA/NO
40PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 40X40X40X5cm, COMPLETE BY COPPER EARTH ROD 1,5m AND INFORMATION GROUDING SYSTEM.
Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 40x40x40x5cm, completo di picchetto in rame 1,5m e cartello di terra.IT. No.9bEA/NO
41BURRIED GROUND CABLE - 95mmq COPPER
Corda di rame nuda 95mmq interrataIT. No. Art. n.10m
42HOT GALVANISED STEEL STRIP - 40x4mm
Barra di terra in acciaio zincato - 40x4mmIT. No. Art. n.11m
43GALVANIZED STEEL ROUND WIRE - D.8mm
Tondino in acciaio zinacato - D.8mmIT. No. Art. n.12m
44GROUND DISCONNECT
Sezionatore di terraIT. No. Art. n.13m
45PICKING-UP ROD H=2,5m
Asta di captazione H=2,5mIT. No. Art. n.14EA/NO
46C16/20 LEAN CONCRETE
Calcestruzzo C16/20IT. No. Art. n.15m3
47SAND
SabbiaIT. No. Art. n.16m3
48FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1/2 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1/2 polliceIT. No.17am
49FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 3/4 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 3/4 polliceIT. No.17bm
50FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1 polliceIT. No.17cm
51FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 2 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 2 pollicIIT. No.17dm
52FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 4 INCH DIAMETER
Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 4 pollicIIT. No.17em
53180W IP66 LIGHTING FIXTURE LED TYPE - EXPLOSION PROOF II2GD Ex de IIC T5
Corpo illuminante LED IP66 180W - CE ATEX II2GD Ex de IIC T5IT. No.18aEA/NO
541x36W IP65 LIGHTING FIXTURE FLUORESCENT TUBE TYPE - EXPLOSION PROOF II2GD Ex de IIC T5/T6 - EMERGENCY ONLY
Corpo illuminante 1x36W fluorescente IP65 - CE ATEX II2GD Ex de IIC T5/T6 - Solo emergenzaIT. No.18bEA/NO
55EXTERNAL FLOOD LIGHT, LED TYPE - 92W - IP66
Proiettore asimmetrico industriale da esterno a LED - 92W - IP66IT. No.18cEA/NO
562x31W LIGHTING FIXTURE LED TYPE - EXPLOSION PROOF II 2GD Ex d IIC T6
Corpo illuminante 1x36W fluorescente IP65 - CE ATEX II2GD Ex d IIC T6IT. No.18dEA/NO
57PHOTOCELL SWITCH
Sensore crepuscolareIT. No.19EA/NO
58INTERLOCKED OUTLET 2P+G 16A 230V - EXPLOSION PROOF II2GD Ex de IIC T5
Presa interbloccata 2P+G 16A 230V - CE ATEX II2GD Ex de IIC T5IT. No.20aEA/NO
59INTERLOCKED OUTLET 3P+G 16A 400V - EXPLOSION PROOF II2GD Ex de IIC T5
Presa interbloccata 3P+G 16A 400V - CE ATEX II2GD Ex de IIC T5IT. No.20bEA/NO
60INTERLOCKED OUTLET IP55 3P+N+G 125A 400V WITH CIRCUIT BREAKER - GENERATOR
Presa interbloccata IP55 3P+N+G 125A 400V con interruttore magnetotermico ed interblocco - GeneratoreIT. No.20cEA/NO
61JUNCTION BOX FOR INSTALLATION OF FIRE ALARM EQUIPMENTS. EQUIPPED WITH CIRCUIT BREAKER - INSIDE DIMENSIONS 890x590x340mm - EXPLOSION PROOF II2GD Ex d IIB T5/T6
Custodia per apparati impianto rilevazione incendi, completo di interrruttori - dimmensioni interne 890x590x340mm - CE ATEX II2GD Ex d IIB T5/T6IT. No.21aEA/NO
62JUNCTION BOX FOR INSTALLATION OF COMMUNICATION EQUIPMENTS. EQUIPPED WITH CIRCUIT BREAKER 16A (ON FRONT), TEMPERATURE PROBE AND DISPLAY (ON FRONT) TRAILING SOCKETS, N.3 CABLE GLANDS (ELECTRICAL SET UP), GROUND BAR - INSIDE DIMENSIONS 890x590x340mm - EXPLOSION PROOF II2GD Ex d IIB T5/T6
Custodia per apparati impianto dati. Completa di int. magnetotermico 16A su fronte custodia, sonda temperatura e display (quest'ultima su fronte custodia), ciabatta multipresa interna, 3 pressavavi per futuri punti di ingresso, barra di terra. - dimmensioni interne 890x590x340mm - CE ATEX II2GD Ex d IIB T5/T6IT. No.21bEA/NO
63CONTROL STATION FOR CONTROL - DOUBLE UNIT: 4+4 PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIC T5/T6
Pulsantiera doppio corpo - 4+4 pulsanti - CE ATEX II2GD Ex d IIC T5/T6IT. No.22aEA/NO
64CONTROL STATION FOR SIGNALING - SINGLE UNIT: 1 RED PILOT LIGHT - EXPLOSION PROOF II2GD Ex d IIC T5/T6
Spia di segnalazione - 1 spia colore rosso - CE ATEX II2GD Ex d IIC T5/T6IT. No.22bEA/NO
65SEALING THE HOLES

BLDG 8010, 7910, 7870

Sigillare i fori o gli attraversamenti

Edifici 8010, 7910, 7870IT. No. Art. n.23LS/AC
66VERIFY , RESTORE AND ADJUST THE EXISTING EQUIPOTENTIAL CONNECTIONS

BLDG 8010, 7910, 7870

Verificare, ripristinare e verificare i collegamenti equipotenziali esistenti

Edifici 8010, 7910, 7870IT. No. Art. n.24LS/AC
67REALIZE NEW EQUIPOTENZIAL CONNECTIONS

BLDG 8010, 7910, 7870

Realizzare nuovi collegamenti equipotenziali

Edifici 8010, 7910, 7870IT. No. Art. n.25LS/AC
68RECONNECT EXISTING SYSTEMS OR DEVICES

BLDG 8010, 7910, 7870

Ricollegare gli impianti o le apparecchiature esistenti non rimosse

Edifici 8010, 7910, 7870IT. No. Art. n.26LS/AC
69FINAL TEST ELECTRICAL SYSTEMS. SUBMITTAL ELECTRICAL WORK CERTIFICATIONS.

BLDG 8010, 7910, 7870

Verifica impianto elettrico . Sottomissione delle dichiarazioni di conformità DM 37/08.

Edifici 8010, 7910, 7870IT. No. Art. n.27LS/AC
70FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM SYSTEM - STANDARD EN 50200 - SECTION 2X1 SQ.MM.
Fornitura e posa in opera di cavo loop per allarme incendio EN 50200 - sezione 2x1 mmq.IT. No.28am
71FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM SYSTEM - STANDARD EN 50200 - SECTION 2X1,5 SQ.MM.
Fornitura e posa in opera di cavo loop per allarme incendio EN 50200 - sezione 2x1,5 mmq.IT. No.28bm
72FURNISH AND INSTALL OUTPUT MODULE
Fornitura e posa in opera di modulo ad 1 uscitaIT. No.29aEA/NO
73FURNISH AND INSTALL INPUT MODULE
Fornitura e posa in opera di modulo ad 1 ingressoIT. No.29bEA/NO
74FURNISH AND INSTALL CONVENTIONAL MANUAL CALL POINT - PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIB T6
Fornitura e posa in opera di pulsante antincendio completro di cartello monitore - CE ATEX II2GD Ex d IIB T6IT. No.29cEA/NO
75FURNISH AND INSTALL RED FLASHING LIGHT - EXPLOSION PROOF II 2GD Ex d IIC T6
Fornitura e posa in opera lampeggiatore luminoso rosso - CE ATEX II 2GD Ex d IIC T6IT. No.29dEA/NO
76FURNISH AND INSTALL SOUNDER - EXPLOSION PROOF II 2GD Ex d IIC T6
Fornitura e posa in opera avvisatore acustico - CE ATEX II 2GD Ex d IIC T6IT. No.29eEA/NO
77FURNISH AND INSTALL TRIPLE IR FLAME DETECTOR - EXPLOSION PROOF Ex II 2GD
Fornitura e posa in opera di rivelatore di fiamma - CE ATEX Ex II 2GDIT. No.29fEA/NO
78FURNISH AND INSTALL ADRESSABLE FIRE ALARM CONTROL PANEL. EQUIPPED WITH 2X12V / 17-18AH BATTERIES AND ACCESSORIES.
Fornitura e posa in opera di centrale allarme incendio. Equipaggaita con batterie 2x12V / 17-18Ah ed accessori.IT. No.29gEA/NO
79SUPPLY AND INSTALLATION OF TRANSMITTER MONACO. COMPLETE WITH ANTENNA, cable, SPD, ECC.
Fornitura e posa in opera di trasmettitore MONACO. Completo di antenna, cavo, SPD, ecc.IT. No.29hEA/NO
80FURNISH AND INSTALL JP8 FUEL GAS DETECTOR - EXPLOSION PROOF Ex-d IIC 2GD T6
Fornitura e posa in opera di rivelatore di gas JP8 - CE ATEX Ex-d IIC 2GD T6IT. No.29iEA/NO
81TEST AND CERTIFICATION OF THE NEW FIRE ALARM SYSTEM.

BLDG 8010, 7910, 7870

Collaudo e certificazione del nuovo impianto allarme incendio.

Edifici 8010, 7910, 7870IT. No.30LS/AC
824 COMMUNICATION OUTLET GROUP RJ45 - EXPLOSION PROOF II 3G Ex-nA II T6X - IP68
Gruppo 4 prese per telecomunicazioni RJ45 - CE ATEX II 3G Ex-nA II T6X - IP68IT. No.31EA/NO
83COMMUNICATION CABLE CAT.6 UTP
cavo UTP cat.6, non schermatoIT. No.32am
84TEST AND CERTIFICATION OF COMMUNICATION SYSTEM.

BLDG 8010, 7910, 7870

Collaudo e certificazione dell'impianto dati.

Edifici 8010, 7910, 7870IT. No.33LS/AC
85RECONNECT EXISTING COMMUNICATION SYSTEMS OR DEVICES

BLDG 8010, 7910, 7870

Ricollegamento impianto o le apparecchiature dati esistenti.

BLDG 8010, 7910, 7870IT. No. Art. n.34LS/AC
TOTAL PART IV / Totale Parte IV
REPAIR WORK SUMMARY / Riepilogo Lavori di Ristrutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
TOTAL PRICE / Costo Totale
$0.00$0.00$0.00$0.00

&RSheet &P of &N

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
ASHE 14-1011 RPR PASs ELEC SYS AT ZULU LOOP, B. 8010, 7910, 7870
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 14-1011B. 8010, 7910, 7870, AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
A.NEW CONSTRUCTION / Nuova Costruzione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ 0.00€ 0.00€ 0.00€ 0.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK€ 0.00€ 0.00€ 0.00€ 0.00
PART III - MECHANICAL WORK€ 0.00€ 0.00€ 0.00€ 0.00
PART IV - ELECTRICAL WORK€ 0.00€ 0.00€ 0.00€ 0.00
SUB TOTAL A.€ 0.00€ 0.00€ 0.00€ 0.00
B.REPAIR / Ristutturazione
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
PART IV - ELECTRICAL WORK
SUB TOTAL B.
TOTAL PRICE / Costo Totale
$0.00$0.00$0.00$0.00
900X2150 mm METAL DOOR, STC50, SYMBOL "D5"
Porta in ferro 900x2150 mm, STC50, Sigla "D5"2

&RSheet &P of &N

Grand Total

CONSTRUCTION COST ESTIMATE BREAKDOWN
ASHE 14-1011 RPR PASs ELEC SYS AT ZULU LOOP, B. 8010, 7910, 7870
INSTRUCTIONS FOR COMPLETING AF FORM 3052
A. NEW CNSTRB. REPAIRTOTAL A+B (€)
TOTAL MATERIAL COSTS€0.00€0.00€0.00
TOTAL LABOR COSTS€0.00€0.00€0.00
TOTAL OTHER DIRECT COSTS€0.00€0.00€0.00
TOTAL DIRECT COSTS€0.00€0.00€0.00
OVERHEAD%€0.00€0.00€0.00
SUBTOTAL€0.00€0.00€0.00
PROFIT%€0.00€0.00€0.00
TOTAL PRICE€0.00€0.00€0.00
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .