new cnstr.
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ASHE 14-1011 RPR PASs ELEC SYS AT ZULU LOOP, B. 8010, 7910, 7870 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 14-1011 | B. 8010, 7910, 7870, AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| A. | NEW CONSTRUCTION / Nuova Costruzione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||
| Ia Architectural Work - Ia Lavori Architettonici | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Architectural Work - Totale Lavori Architettonici | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| Ib Structural Work - Ib Lavori Strutturali | 0.00 | 0.00 | 0.00 | |||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Structural Work - Totale Lavori Strutturali | 0.00 | 0.00 | 0.00 | |||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| Ic Civil Work - Ic Lavori Civili | 0.00 | 0.00 | 0.00 | |||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Civil Work - Totale Lavori Civili | 0.00 | 0.00 | 0.00 | |||||||
| Id Mechanical Work - Ic Lavori Meccanici | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Mechanical Work - Totale Lavori Meccanici | 0.00 | 0.00 | 0.00 | |||||||
| Ie Electrical Work - Ic Lavori Elettrici | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Mechanical Work - Totale Lavori Meccanici | 0.00 | 0.00 | 0.00 | |||||||
| TOTAL PART I - Totale Parte I | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| Total Architectural Work - Totale Lavori Architettonici | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| IIb Structural Work - IIb Lavori Strutturali | 0.00 | 0.00 | 0.00 | |||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Structural Work - Totale Lavori Strutturali | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| IIc Civil Work - IIc Lavori Civili | 0.00 | 0.00 | 0.00 | |||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Civil Work - Totale Lavori Civili | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL PART II / Totale Parte II | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||
| IIIa HVAC System - IIIa Impianto di Condizionamento | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total HVAC Systems - Totale Impianti HVAC | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| PART IIIb - COMPRESSED AIR AND SPRINKLER SYSTEMS / PARTE IIIa - Impiant di aria compressa e sprinkler | ||||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| Total Compressed air and sprinkler Systems - Totale Impianti di aria compressa e sprinkler | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL PART III / Totale Parte III | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| PART IV- ELECTRICAL WORK / Parte IV - Lavori Elettrici | 0.00 | 0.00 | ||||||||
| NOT APPLICABLE Non Applicabile | ||||||||||
| TOTAL PART IV / Totale Parte IV | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| PART III - MECHANICAL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| PART IV - ELECTRICAL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| TOTAL PRICE / Costo Totale | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 |
&RSheet &P of &N repair
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| ASHE 14-1011 RPR PASs ELEC SYS AT ZULU LOOP, B. 8010, 7910, 7870 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 14-1011 | B. 8010, 7910, 7870, AREA F, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| B. | REPAIR WORK / Lavori di Ristrutturazione | |||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||
| Ia Architectural Work - Ia Lavori Architettonici | ||||||||||
| 1 | ASBESTOS REMOVAL. COMPLETE OF DUMP FEE |
BLDG 8010, 7910, 7870
Rimozione amianto. Completo di oneri discarica.
| Edifici 8010,7910, 7870 | IT. No. Art. n. | 1 | LS/AC |
| Total Architectural Work - Totale Lavori Architettonici | |||
| Ib Structural Work - Ib Lavori Strutturali | |||
| 2 | PERFORATION METAL AND CONCRETE WALLS |
BLDG 8010, 7910, 7870
Esecuzione di carrotaggi su pareti in metallo e calcestruzzo
| Edifici 8010,7910, 7870 | IT. No. Art. n. | 1 | LS/AC | |||
| Total Structural Work - Totale Lavori Strutturali | ||||||
| Ic Civil Work - Ic Lavori Civili | 0.00 | 0.00 | 0.00 | |||
| 3 | Not Applicable |
Non applicabile
| Total Civil Work - Totale Lavori Civili | 0.00 | 0.00 | 0.00 | ||
| 0 | |||||
| Id Mechanical Work- Id Lavori Meccanici | 0.00 | 0.00 | 0.00 | ||
| 4 | Not Applicable |
Non applicabile
| Total Mechanical Work - Totale Lavori Meccanici | 0.00 | 0.00 | 0.00 | 0.00 | |
| Ie Electrical Work - Ie Lavori Elettrici | 0.00 | 0.00 | 0.00 | ||
| 5 | REMOVAL OF EXISTING ELECTRICAL AND COMMUNICATION SYSTEM. COMPLETE OF PUBBLIC DUMP FEE |
BLDG 8010, 7910, 7870
Rimozione dell'impianto elettrico e dati esistente. Completo di oneri pubblica discarica.
| Edifici 8010,7910, 7870 | IT. No. Art. n. | 1 | LS/AC | ||||
| Total Electrical Work - Totale Lavori Elettrici | 0.00 | 0.00 | 0.00 | 0.00 | |||
| TOTAL PART I / Totale Parte I | 0.00 | 0.00 | 0.00 | 0.00 | |||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili | |||||||
| IIa Architectural Work - IIa Lavori Architettonici | |||||||
| 6 | Not Applicable |
Non applicabile
| Total Architectural Work - Totale Lavori Architettonici | 0.00 | 0.00 | 0.00 | 0.00 | |
| IIb Structural Work - IIb Lavori Strutturali | 0.00 | 0.00 | 0.00 | ||
| 7 | Not Applicable |
Non applicabile
| Total StructuralL Work - Totale Lavori Strutturali | 0.00 | 0.00 | 0.00 | 0.00 | |
| IIc Civil Work - IIc Lavori Civili | 0.00 | 0.00 | 0.00 | ||
| 8 | INSTALL DOOR SEALS |
BLDG 8010, 7910, 7870
Installare nuove guarnizioni porta.
| Edifici 8010, 7910, 7870 | IT. No. Art. n. | 1 | LS/AC |
| 9 | SAND FLOOR SURFACE AND VACUUM | ||
| Pulizia meccanica delle superfici da trattare con resina | IT. No. Art. n. | 2a | m2 |
| 10 | PRIMER | ||
| Fornitura e posa di primer | IT. No. Art. n. | 2b | m2 |
| 11 | THREE-COMPONENT "CONTRO SPINTA" | ||
| Fornitura e posa di strato resina epossidica tri-componente | IT. No. Art. n. | 2c | m2 |
| 12 | FIRST COAT OF RESIN AND ANTI-SKID CORUNDUM | ||
| Fornitura e posa di primo strato di trattamento della resina | IT. No. Art. n. | 2d | m2 |
| 13 | SECOND COAT OF EPOXY RESIN | ||
| Fornitura e posa di secondo strato di trattamento della resina | IT. No. Art. n. | 2e | m2 |
| 14 | ANTI-SCRATCH OPAQUE FINISHING WITH CORUNDUM | ||
| Fornitura e posa di strato finale di trattamente della resina | IT. No. Art. n. | 2f | m2 |
| 15 | ELASTIC JOINT SEAL | ||
| Fornitura e posa di giunto elestico di tenuta | IT. No. Art. n. | 2g | m |
| 16 | COLORED STRIPING AND MARKING |
BLDG 8010, 7910, 7870
Colorazione e marcatura delle superfici
| Edifici 8010, 7910, 7870 | IT. No. Art. n. | 2h | LS/AC |
| Total Civil Work - Totale Lavori Civili | |||
| TOTAL PART II / Totale Parte II | |||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | |||
| PART IIIa - HVAC SYSTEMS / Parte IIIa -Impianti HVAC | |||
| 17 | GALVANIZED SHEET METAL DUCT D.630mm, COMPLETE WITH SUCTION GRIDS, DUCT SUPPORTS AND ACCESSORIES | ||
| Canali in lamiera zincata D.630mm, completo di bocchette, staffaggi e accessori | IT. No. Art. n. | 1a | m |
| 18 | EXHAUST AIR MOTOR - EXPLOSION PROOF | ||
| Estrattore fumi - CE ATEX Zona 1 | IT. No. Art. n. | 2 | EA/NO |
| 19 | EXPULSION GRID | ||
| Griglia di esplulsione aria | IT. No. Art. n. | 3a | EA/NO |
| 20 | FINAL TEST MECHANICAL SYSTEMS. SUBMITTAL MECHANICAL WORK CERTIFICATIONS. |
BLDG 8010, 7910, 7870
Verifica impianto meccanico . Sottomissione delle dichiarazioni di conformità DM 37/08.
| Edifici 8010, 7910, 7870 | IT. No. Art. n. | 4 | LS/AC |
| Total HVAC Systems - Totale Impianti HVAC | |||
| PART IIIb - PLUMBING - COMPRESSED AIR - SPRINKLER SYSTEMS / PARTE IIIa - Impianti Idrico-sanitario - aria compressa - sprinkler | |||
| 21 | Not Applicable |
Non applicabile
| Total Plumbing - Compressed air - Sprinkler Systems - Totale Impianti Idrico-Sanitario - Aria compressa - Sprinkler | |||
| TOTAL PART III / Totale Parte III | |||
| PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici | |||
| 22 | NEW MAIN BREAKER 4x160A IN THE EXISTING SUBSTATION BLDG #78030 | ||
| Installazione nuovo int. 4x160A all'interno della cabina elettrica esistente n.78030 | IT. No. Art. n. | 1 | EA/NO |
| 23 | EXISTING "MDP " ELECTRICAL PANEL - (ELECTRICAL CHANGE AND ADJUST)- BUILDINGS #7910 AND #7870 | ||
| Quadro elettrico esistente "MDP" (modifiche elettriche ed adeguamento) - EDIFICIO N.7910 E N.7870 | IT. No. Art. n. | 2 | LS/AC |
| 24 | "MDP" ELECTRICAL PANEL - EXPLOSION PROOF -BUILDING #8010 | ||
| Quadro elettrico "MDP" tipo ATEX - EDIFICIO N.8010 | IT. No. Art. n. | 3a | EA/NO |
| 25 | "GEN" ELECTRICAL PANEL | ||
| Quadro elettrico "GEN" | IT. No. Art. n. | 3b | EA/NO |
| 26 | MAIN PANEL FEEDER LINE FG7R-3x240+240N+240PENmmq | ||
| Linea di alimentazione generale FG7R-3x240+240N+240PEN mmq | IT. No. | 4 | m |
| 27 | ELECTRICAL CABLE FG7R 1x50mmq | ||
| Cavo elettrico FG7R 1x50mmq | IT. No. Art. n. | 5a | m |
| 28 | ELECTRICAL CABLE FG7OR 3G2,5mmq | ||
| Cavo elettrico FG7OR 3G2,5mmq | IT. No. Art. n. | 5b | m |
| 29 | ELECTRICAL CABLE FG7OR 3G4mmq | ||
| Cavo elettrico FG7OR 3G4mmq | IT. No. Art. n. | 5c | m |
| 30 | ELECTRICAL CABLE FG7OR 3G6mmq | ||
| Cavo elettrico FG7OR 3G6mmq | IT. No. Art. n. | 5d | m |
| 31 | ELECTRICAL CABLE FG7OR 3G10mmq | ||
| Cavo elettrico FG7OR 3G10mmq | IT. No. Art. n. | 5e | m |
| 32 | ELECTRICAL CABLE FG7OR 5G6mmq | ||
| Cavo elettrico FG7OR 5G6mmq | IT. No. Art. n. | 5f | m |
| 33 | ELECTRICAL CABLE FG7OR 4G10mmq | ||
| Cavo elettrico FG7OR 4G10mmq | IT. No. Art. n. | 5g | m |
| 34 | ELECTRICAL CABLE FG7OR 7G1,5mmq | ||
| Cavo elettrico FG7OR 7G1,5mmq | IT. No. Art. n. | 5h | m |
| 35 | ELECTRICAL CABLE FG7OR 10G1,5mmq | ||
| Cavo elettrico FG7OR 10G1,5mmq | IT. No. Art. n. | 5i | m |
| 36 | EXCAVATION FOR NEW CONDUITS | ||
| Scavo per nuove tubazioni interrate | IT. No. Art. n. | 6 | m3 |
| 37 | EXCAVATION BY PIPE PERCUSSION | ||
| Scavo per nuove tubazioni interrate | IT. No. Art. n. | 7 | m |
| 38 | SUPPLY AND INSTALLATION AT SIGHT, OR DIGGING WITHIN WELLS, CONDUITS OF HIGH-DENSITY POLYETHYLENE "HDPE DIAM. 160 | ||
| Fornitura e posa in opera a vista, entro cavedi o scavo, di cavidotti in polietilene alta densità "PEHD DIAM. 160 | IT. No. | 8 | m |
| 39 | PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 100X100X150x10cm. | ||
| Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 100x100x150x10cm (dimensioni interne) | IT. No. | 9a | EA/NO |
| 40 | PRECAST REINFORCED CONCRETE MANHOLES WITH MANHOLE DRIVEWAY VIBRATED BY 40X40X40X5cm, COMPLETE BY COPPER EARTH ROD 1,5m AND INFORMATION GROUDING SYSTEM. | ||
| Pozzetti prefabbricati in CLS armato vibrato con chiusino carrabile da 40x40x40x5cm, completo di picchetto in rame 1,5m e cartello di terra. | IT. No. | 9b | EA/NO |
| 41 | BURRIED GROUND CABLE - 95mmq COPPER | ||
| Corda di rame nuda 95mmq interrata | IT. No. Art. n. | 10 | m |
| 42 | HOT GALVANISED STEEL STRIP - 40x4mm | ||
| Barra di terra in acciaio zincato - 40x4mm | IT. No. Art. n. | 11 | m |
| 43 | GALVANIZED STEEL ROUND WIRE - D.8mm | ||
| Tondino in acciaio zinacato - D.8mm | IT. No. Art. n. | 12 | m |
| 44 | GROUND DISCONNECT | ||
| Sezionatore di terra | IT. No. Art. n. | 13 | m |
| 45 | PICKING-UP ROD H=2,5m | ||
| Asta di captazione H=2,5m | IT. No. Art. n. | 14 | EA/NO |
| 46 | C16/20 LEAN CONCRETE | ||
| Calcestruzzo C16/20 | IT. No. Art. n. | 15 | m3 |
| 47 | SAND | ||
| Sabbia | IT. No. Art. n. | 16 | m3 |
| 48 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1/2 INCH DIAMETER | ||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1/2 pollice | IT. No. | 17a | m |
| 49 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 3/4 INCH DIAMETER | ||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 3/4 pollice | IT. No. | 17b | m |
| 50 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 1 INCH DIAMETER | ||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 1 pollice | IT. No. | 17c | m |
| 51 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 2 INCH DIAMETER | ||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 2 pollicI | IT. No. | 17d | m |
| 52 | FURNISH AND INSTALL OF GALVANIZED STEEL PIPE (UNI 7683) - 4 INCH DIAMETER | ||
| Fornitura e posa in opera di tubo in acciaio zinacato (UNI 7683) - diametro 4 pollicI | IT. No. | 17e | m |
| 53 | 180W IP66 LIGHTING FIXTURE LED TYPE - EXPLOSION PROOF II2GD Ex de IIC T5 | ||
| Corpo illuminante LED IP66 180W - CE ATEX II2GD Ex de IIC T5 | IT. No. | 18a | EA/NO |
| 54 | 1x36W IP65 LIGHTING FIXTURE FLUORESCENT TUBE TYPE - EXPLOSION PROOF II2GD Ex de IIC T5/T6 - EMERGENCY ONLY | ||
| Corpo illuminante 1x36W fluorescente IP65 - CE ATEX II2GD Ex de IIC T5/T6 - Solo emergenza | IT. No. | 18b | EA/NO |
| 55 | EXTERNAL FLOOD LIGHT, LED TYPE - 92W - IP66 | ||
| Proiettore asimmetrico industriale da esterno a LED - 92W - IP66 | IT. No. | 18c | EA/NO |
| 56 | 2x31W LIGHTING FIXTURE LED TYPE - EXPLOSION PROOF II 2GD Ex d IIC T6 | ||
| Corpo illuminante 1x36W fluorescente IP65 - CE ATEX II2GD Ex d IIC T6 | IT. No. | 18d | EA/NO |
| 57 | PHOTOCELL SWITCH | ||
| Sensore crepuscolare | IT. No. | 19 | EA/NO |
| 58 | INTERLOCKED OUTLET 2P+G 16A 230V - EXPLOSION PROOF II2GD Ex de IIC T5 | ||
| Presa interbloccata 2P+G 16A 230V - CE ATEX II2GD Ex de IIC T5 | IT. No. | 20a | EA/NO |
| 59 | INTERLOCKED OUTLET 3P+G 16A 400V - EXPLOSION PROOF II2GD Ex de IIC T5 | ||
| Presa interbloccata 3P+G 16A 400V - CE ATEX II2GD Ex de IIC T5 | IT. No. | 20b | EA/NO |
| 60 | INTERLOCKED OUTLET IP55 3P+N+G 125A 400V WITH CIRCUIT BREAKER - GENERATOR | ||
| Presa interbloccata IP55 3P+N+G 125A 400V con interruttore magnetotermico ed interblocco - Generatore | IT. No. | 20c | EA/NO |
| 61 | JUNCTION BOX FOR INSTALLATION OF FIRE ALARM EQUIPMENTS. EQUIPPED WITH CIRCUIT BREAKER - INSIDE DIMENSIONS 890x590x340mm - EXPLOSION PROOF II2GD Ex d IIB T5/T6 | ||
| Custodia per apparati impianto rilevazione incendi, completo di interrruttori - dimmensioni interne 890x590x340mm - CE ATEX II2GD Ex d IIB T5/T6 | IT. No. | 21a | EA/NO |
| 62 | JUNCTION BOX FOR INSTALLATION OF COMMUNICATION EQUIPMENTS. EQUIPPED WITH CIRCUIT BREAKER 16A (ON FRONT), TEMPERATURE PROBE AND DISPLAY (ON FRONT) TRAILING SOCKETS, N.3 CABLE GLANDS (ELECTRICAL SET UP), GROUND BAR - INSIDE DIMENSIONS 890x590x340mm - EXPLOSION PROOF II2GD Ex d IIB T5/T6 | ||
| Custodia per apparati impianto dati. Completa di int. magnetotermico 16A su fronte custodia, sonda temperatura e display (quest'ultima su fronte custodia), ciabatta multipresa interna, 3 pressavavi per futuri punti di ingresso, barra di terra. - dimmensioni interne 890x590x340mm - CE ATEX II2GD Ex d IIB T5/T6 | IT. No. | 21b | EA/NO |
| 63 | CONTROL STATION FOR CONTROL - DOUBLE UNIT: 4+4 PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIC T5/T6 | ||
| Pulsantiera doppio corpo - 4+4 pulsanti - CE ATEX II2GD Ex d IIC T5/T6 | IT. No. | 22a | EA/NO |
| 64 | CONTROL STATION FOR SIGNALING - SINGLE UNIT: 1 RED PILOT LIGHT - EXPLOSION PROOF II2GD Ex d IIC T5/T6 | ||
| Spia di segnalazione - 1 spia colore rosso - CE ATEX II2GD Ex d IIC T5/T6 | IT. No. | 22b | EA/NO |
| 65 | SEALING THE HOLES |
BLDG 8010, 7910, 7870
Sigillare i fori o gli attraversamenti
| Edifici 8010, 7910, 7870 | IT. No. Art. n. | 23 | LS/AC |
| 66 | VERIFY , RESTORE AND ADJUST THE EXISTING EQUIPOTENTIAL CONNECTIONS |
BLDG 8010, 7910, 7870
Verificare, ripristinare e verificare i collegamenti equipotenziali esistenti
| Edifici 8010, 7910, 7870 | IT. No. Art. n. | 24 | LS/AC |
| 67 | REALIZE NEW EQUIPOTENZIAL CONNECTIONS |
BLDG 8010, 7910, 7870
Realizzare nuovi collegamenti equipotenziali
| Edifici 8010, 7910, 7870 | IT. No. Art. n. | 25 | LS/AC |
| 68 | RECONNECT EXISTING SYSTEMS OR DEVICES |
BLDG 8010, 7910, 7870
Ricollegare gli impianti o le apparecchiature esistenti non rimosse
| Edifici 8010, 7910, 7870 | IT. No. Art. n. | 26 | LS/AC |
| 69 | FINAL TEST ELECTRICAL SYSTEMS. SUBMITTAL ELECTRICAL WORK CERTIFICATIONS. |
BLDG 8010, 7910, 7870
Verifica impianto elettrico . Sottomissione delle dichiarazioni di conformità DM 37/08.
| Edifici 8010, 7910, 7870 | IT. No. Art. n. | 27 | LS/AC |
| 70 | FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM SYSTEM - STANDARD EN 50200 - SECTION 2X1 SQ.MM. | ||
| Fornitura e posa in opera di cavo loop per allarme incendio EN 50200 - sezione 2x1 mmq. | IT. No. | 28a | m |
| 71 | FURNISH AND INSTALL LOOP CABLE FOR FIRE ALARM SYSTEM - STANDARD EN 50200 - SECTION 2X1,5 SQ.MM. | ||
| Fornitura e posa in opera di cavo loop per allarme incendio EN 50200 - sezione 2x1,5 mmq. | IT. No. | 28b | m |
| 72 | FURNISH AND INSTALL OUTPUT MODULE | ||
| Fornitura e posa in opera di modulo ad 1 uscita | IT. No. | 29a | EA/NO |
| 73 | FURNISH AND INSTALL INPUT MODULE | ||
| Fornitura e posa in opera di modulo ad 1 ingresso | IT. No. | 29b | EA/NO |
| 74 | FURNISH AND INSTALL CONVENTIONAL MANUAL CALL POINT - PUSH BUTTON - EXPLOSION PROOF II2GD Ex d IIB T6 | ||
| Fornitura e posa in opera di pulsante antincendio completro di cartello monitore - CE ATEX II2GD Ex d IIB T6 | IT. No. | 29c | EA/NO |
| 75 | FURNISH AND INSTALL RED FLASHING LIGHT - EXPLOSION PROOF II 2GD Ex d IIC T6 | ||
| Fornitura e posa in opera lampeggiatore luminoso rosso - CE ATEX II 2GD Ex d IIC T6 | IT. No. | 29d | EA/NO |
| 76 | FURNISH AND INSTALL SOUNDER - EXPLOSION PROOF II 2GD Ex d IIC T6 | ||
| Fornitura e posa in opera avvisatore acustico - CE ATEX II 2GD Ex d IIC T6 | IT. No. | 29e | EA/NO |
| 77 | FURNISH AND INSTALL TRIPLE IR FLAME DETECTOR - EXPLOSION PROOF Ex II 2GD | ||
| Fornitura e posa in opera di rivelatore di fiamma - CE ATEX Ex II 2GD | IT. No. | 29f | EA/NO |
| 78 | FURNISH AND INSTALL ADRESSABLE FIRE ALARM CONTROL PANEL. EQUIPPED WITH 2X12V / 17-18AH BATTERIES AND ACCESSORIES. | ||
| Fornitura e posa in opera di centrale allarme incendio. Equipaggaita con batterie 2x12V / 17-18Ah ed accessori. | IT. No. | 29g | EA/NO |
| 79 | SUPPLY AND INSTALLATION OF TRANSMITTER MONACO. COMPLETE WITH ANTENNA, cable, SPD, ECC. | ||
| Fornitura e posa in opera di trasmettitore MONACO. Completo di antenna, cavo, SPD, ecc. | IT. No. | 29h | EA/NO |
| 80 | FURNISH AND INSTALL JP8 FUEL GAS DETECTOR - EXPLOSION PROOF Ex-d IIC 2GD T6 | ||
| Fornitura e posa in opera di rivelatore di gas JP8 - CE ATEX Ex-d IIC 2GD T6 | IT. No. | 29i | EA/NO |
| 81 | TEST AND CERTIFICATION OF THE NEW FIRE ALARM SYSTEM. |
BLDG 8010, 7910, 7870
Collaudo e certificazione del nuovo impianto allarme incendio.
| Edifici 8010, 7910, 7870 | IT. No. | 30 | LS/AC |
| 82 | 4 COMMUNICATION OUTLET GROUP RJ45 - EXPLOSION PROOF II 3G Ex-nA II T6X - IP68 | ||
| Gruppo 4 prese per telecomunicazioni RJ45 - CE ATEX II 3G Ex-nA II T6X - IP68 | IT. No. | 31 | EA/NO |
| 83 | COMMUNICATION CABLE CAT.6 UTP | ||
| cavo UTP cat.6, non schermato | IT. No. | 32a | m |
| 84 | TEST AND CERTIFICATION OF COMMUNICATION SYSTEM. |
BLDG 8010, 7910, 7870
Collaudo e certificazione dell'impianto dati.
| Edifici 8010, 7910, 7870 | IT. No. | 33 | LS/AC |
| 85 | RECONNECT EXISTING COMMUNICATION SYSTEMS OR DEVICES |
BLDG 8010, 7910, 7870
Ricollegamento impianto o le apparecchiature dati esistenti.
| BLDG 8010, 7910, 7870 | IT. No. Art. n. | 34 | LS/AC | ||||
| TOTAL PART IV / Totale Parte IV | |||||||
| REPAIR WORK SUMMARY / Riepilogo Lavori di Ristrutturazione | |||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | |||||||
| PART III - MECHANICAL WORK | |||||||
| PART IV - ELECTRICAL WORK | |||||||
| TOTAL PRICE / Costo Totale | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 |
&RSheet &P of &N
Summary
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| ASHE 14-1011 RPR PASs ELEC SYS AT ZULU LOOP, B. 8010, 7910, 7870 | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 14-1011 | B. 8010, 7910, 7870, AREA F, AVIANO AIR BASE, ITALY | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| A. | NEW CONSTRUCTION / Nuova Costruzione | |||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| PART III - MECHANICAL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| PART IV - ELECTRICAL WORK | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| SUB TOTAL A. | € 0.00 | € 0.00 | € 0.00 | € 0.00 | ||||||||
| B. | REPAIR / Ristutturazione | |||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||||||||||
| PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK | ||||||||||||
| PART III - MECHANICAL WORK | ||||||||||||
| PART IV - ELECTRICAL WORK | ||||||||||||
| SUB TOTAL B. | ||||||||||||
| TOTAL PRICE / Costo Totale | ||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| 900X2150 mm METAL DOOR, STC50, SYMBOL "D5" | ||||||||||||
| Porta in ferro 900x2150 mm, STC50, Sigla "D5" | 2 |
&RSheet &P of &N
Grand Total
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| ASHE 14-1011 RPR PASs ELEC SYS AT ZULU LOOP, B. 8010, 7910, 7870 | |||||||||
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | |||||||||
| A. NEW CNSTR | B. REPAIR | TOTAL A+B (€) | |||||||
| TOTAL MATERIAL COSTS | € | 0.00 | € | 0.00 | € | 0.00 | |||
| TOTAL LABOR COSTS | € | 0.00 | € | 0.00 | € | 0.00 | |||
| TOTAL OTHER DIRECT COSTS | € | 0.00 | € | 0.00 | € | 0.00 | |||
| TOTAL DIRECT COSTS | € | 0.00 | € | 0.00 | € | 0.00 | |||
| OVERHEAD | % | € | 0.00 | € | 0.00 | € | 0.00 | ||
| SUBTOTAL | € | 0.00 | € | 0.00 | € | 0.00 | |||
| PROFIT | % | € | 0.00 | € | 0.00 | € | 0.00 | ||
| TOTAL PRICE | € | 0.00 | € | 0.00 | € | 0.00 | |||
| DATE | FIRM NAME | ||||||||
| TITLE | BY | ||||||||
| INSTRUCTIONS TO OFFERORS |
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are…