GOVERNMENT COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
INSTALL EMERGENCY SHOWERS/EYEWASHES FOR ACFT, MX
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 10-1032 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
NEW WORKS
Part 1c. CIVIL WORKS
1 TRENCHES EXCAVATION FOR NEW WATER AND
ELECTRICAL LINES.
IT. No.
Art.
No.
1 CM/MC
TRENCHES BACKFILLING , FURNISHING AND
INSTALLATION OF SAND 0.20 C.m./L.m, 16 sqmm
COPPER WIRE AND WARNING TAPE, COMPACTION
IT. No.
Art.
No.
2 CM/MC
3 DEMOLITION OF EXISTING ASPHALT PAVEMENTS
IT. No.
Art.
No.
3 SMQ/MQ
4 DEMOLITION OF EXISTING REINFORCED CONCRETE
SLAB
IT. No.
Art.
No.
4 SMQ/MQ
5 PROVIDE 8 CM BINDER COURSE FOR ASPHALT
PAVED AREAS
IT. No.
Art.
No.
5 SMQ/MQ
6 PROVIDE 3 CM WEARING COURSE FOR ASPHALT
PAVED AREAS, INCLUDING TACK COAT
IT. No.
Art.
No.
6 SMQ/MQ
CAST IN PLACE REINFORCED CONCRETE SLAB/PAD
UP TO 30 CM, INCLUDING 8 MM THICK, 20X20 CM
WIRE MESH, QUARZ FINISH
IT. No.
Art.
No.
7 SMQ/MQ
8 PERFORM TAXIWAY CROSSING USING PIPE
PERCUSSION JACK/ENDLESS SCREW METHOD
IT. No.
Art.
No.
8 LM/ML
9 DIA. 150 MM CONCRETE CORING ON SHELTERS UP
TO 65 CM THICKNESS WALL
IT. No.
Art.
No.
9 EA/CAD
10 GRASS RESTORATION WITH 15 CM TOP SOIL AND
SEEDING.
IT. No.
Art.
No.
10 SMQ/MQ
11 GEORADAR SURVEY AND REPORT
IT. No.
Art.
No.
11 LM/ML
TOTAL PART 1 C- CIVIL WORKS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
INSTALL EMERGENCY SHOWERS/EYEWASHES FOR ACFT, MX
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 10-1032 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Part 2 - MECHANICAL WORKS
12 FURNISH AND INSTALLATION OF POLYETHYLENE
PIPE, PN-16, DN 50 MM FOR WATER LINE
IT. No.
Art.
No.
1 LM/ML
FURNISH AND INSTALLATION OF DN 50 GATE
VALVES FOR PN 16 POLYETHYLENE PIPES,
INCLUDING CAST IRON BOX COVER
IT. No.
Art.
No.
2 EA/CAD
FURNISH AND INSTALLATION OF INOX STEEL CLAMP
SADDLE FOR THE EXECUTION OF CONNECTION TO
MAIN WATER LINE IN PRESSURE
IT. No.
Art.
No.
14 PIPE SIZE FROM 50 MM TO 63 MM
IT. No.
Art.
No
3.a EA/CAD
15 PIPE SIZE FROM 50 MM TO 125 MM
IT. No.
Art.
No.
3.b EA/CAD
16 PIPE SIZE FROM 50 MM TO 160 MM
IT. No.
Art.
No.
3.c EA/CAD
17 PIPE SIZE FROM 50 MM TO 250 MM
IT. No.
Art.
No.
3.d EA/CAD
18 PIPE SIZE FROM 50 MM TO 315 MM
IT. No.
Art.
No.
3.e EA/CAD
19 FURNISH AND INSTALLATION OF GALVANIZED STEEL
PIPE DN 1 " 1/4 FOR POTABLE WATER
IT. No.
Art.
No.
4 KG
20 THERMAL INSULATION , 40 MM THICKNESS, TYPE
ARMAFLEX AG, FOR COLD WATER PIPE DN 1 " 1/4
IT. No.
Art.
No.
5 LM/ML
21 COVERING THERMAL INSULATION WITH PVC SHEET ,
TYPE ISOGENOPAK
IT. No.
Art.
No.
6 SMQ/MQ
23 PROVIDE 3/4" STEEL BALL VALVE HOSE BIBBS AND
CHECK VALVE
IT. No.
Art.
No.
7 EA/CAD
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
INSTALL EMERGENCY SHOWERS/EYEWASHES FOR ACFT, MX
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 10-1032 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
24 SUPPLY STEEL TO PE TRANSITION JOINT
IT. No.
Art.
No.
8 EA/CAD
SUPPLY AND INSTALL INOX EMERGENCY
EYEWASHES / SHOWERS STATION, TYPE DENIOS
G1991
IT. No.
Art.
No.
9 EA/CAD
SUPPLY AND INSTALL HEATED/FROST PROOF - 25 C,
EMERGENCY EYEWASHES / SHOWERS STATION,
TYPE DENIOS MB250
IT. No.
Art.
No.
10 EA/CAD
TOTAL PART II MECHANICAL WORKS
Part III - ELECTRICAL WORKS
27 SUPPLY AND INSTALL ELECTRICAL CABLEDUCTS AND PITS
IT. No.
Art.
No.
1 LS/AC
28 SUPPLY AND INSTALL ELECTRICAL FEEDING LINE FOR
EMERGENCY STATIONS AND CIRCTUITS BREAKER
IT. No.
Art.
No.
2 LS/AC
TOTAL PART III ELECTRICAL WORKS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
INSTALL EMERGENCY SHOWERS/EYEWASHES FOR ACFT, MX
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 10-1032 AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUMMARY
Part 1
Part 2
Part 3
TOTAL/TOTALE
INSTRUCTIONS FOR COMPLETING THE FORM
TOTAL MATERIAL COSTS Euro
TOTAL LABOR COSTS Euro
TOTAL OTHER DIRECT COSTS Euro
TOTAL DIRECT COSTS Euro
OVERHEAD % Euro
SUBTOTAL Euro
PROFIT % Euro
TOTAL PRICE Euro
DATE NAME
TITLE BY
(Signature)
INSTRUCTIONS TO OFFERORS
1 euro = #DIV/0! $1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all
| ASHE 10-1032 Blank Cost Est. |
| WORK ITEMS LIST |
| ASHE 10-1032 Blank Cost Est..pdf |
| Totali |
File details come from the government source that posted it. Updated .