GOVERNMENT COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

INSTALL EMERGENCY SHOWERS/EYEWASHES FOR ACFT, MX

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 10-1032 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

NEW WORKS

Part 1c. CIVIL WORKS

1 TRENCHES EXCAVATION FOR NEW WATER AND

ELECTRICAL LINES.

IT. No.

Art.

No.

1 CM/MC

TRENCHES BACKFILLING , FURNISHING AND

INSTALLATION OF SAND 0.20 C.m./L.m, 16 sqmm

COPPER WIRE AND WARNING TAPE, COMPACTION

IT. No.

Art.

No.

2 CM/MC

3 DEMOLITION OF EXISTING ASPHALT PAVEMENTS

IT. No.

Art.

No.

3 SMQ/MQ

4 DEMOLITION OF EXISTING REINFORCED CONCRETE

SLAB

IT. No.

Art.

No.

4 SMQ/MQ

5 PROVIDE 8 CM BINDER COURSE FOR ASPHALT

PAVED AREAS

IT. No.

Art.

No.

5 SMQ/MQ

6 PROVIDE 3 CM WEARING COURSE FOR ASPHALT

PAVED AREAS, INCLUDING TACK COAT

IT. No.

Art.

No.

6 SMQ/MQ

CAST IN PLACE REINFORCED CONCRETE SLAB/PAD

UP TO 30 CM, INCLUDING 8 MM THICK, 20X20 CM

WIRE MESH, QUARZ FINISH

IT. No.

Art.

No.

7 SMQ/MQ

8 PERFORM TAXIWAY CROSSING USING PIPE

PERCUSSION JACK/ENDLESS SCREW METHOD

IT. No.

Art.

No.

8 LM/ML

9 DIA. 150 MM CONCRETE CORING ON SHELTERS UP

TO 65 CM THICKNESS WALL

IT. No.

Art.

No.

9 EA/CAD

10 GRASS RESTORATION WITH 15 CM TOP SOIL AND

SEEDING.

IT. No.

Art.

No.

10 SMQ/MQ

11 GEORADAR SURVEY AND REPORT

IT. No.

Art.

No.

11 LM/ML

TOTAL PART 1 C- CIVIL WORKS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

INSTALL EMERGENCY SHOWERS/EYEWASHES FOR ACFT, MX

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 10-1032 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Part 2 - MECHANICAL WORKS

12 FURNISH AND INSTALLATION OF POLYETHYLENE

PIPE, PN-16, DN 50 MM FOR WATER LINE

IT. No.

Art.

No.

1 LM/ML

FURNISH AND INSTALLATION OF DN 50 GATE

VALVES FOR PN 16 POLYETHYLENE PIPES,

INCLUDING CAST IRON BOX COVER

IT. No.

Art.

No.

2 EA/CAD

FURNISH AND INSTALLATION OF INOX STEEL CLAMP

SADDLE FOR THE EXECUTION OF CONNECTION TO

MAIN WATER LINE IN PRESSURE

IT. No.

Art.

No.

14 PIPE SIZE FROM 50 MM TO 63 MM

IT. No.

Art.

No

3.a EA/CAD

15 PIPE SIZE FROM 50 MM TO 125 MM

IT. No.

Art.

No.

3.b EA/CAD

16 PIPE SIZE FROM 50 MM TO 160 MM

IT. No.

Art.

No.

3.c EA/CAD

17 PIPE SIZE FROM 50 MM TO 250 MM

IT. No.

Art.

No.

3.d EA/CAD

18 PIPE SIZE FROM 50 MM TO 315 MM

IT. No.

Art.

No.

3.e EA/CAD

19 FURNISH AND INSTALLATION OF GALVANIZED STEEL

PIPE DN 1 " 1/4 FOR POTABLE WATER

IT. No.

Art.

No.

4 KG

20 THERMAL INSULATION , 40 MM THICKNESS, TYPE

ARMAFLEX AG, FOR COLD WATER PIPE DN 1 " 1/4

IT. No.

Art.

No.

5 LM/ML

21 COVERING THERMAL INSULATION WITH PVC SHEET ,

TYPE ISOGENOPAK

IT. No.

Art.

No.

6 SMQ/MQ

23 PROVIDE 3/4" STEEL BALL VALVE HOSE BIBBS AND

CHECK VALVE

IT. No.

Art.

No.

7 EA/CAD

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

INSTALL EMERGENCY SHOWERS/EYEWASHES FOR ACFT, MX

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 10-1032 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

24 SUPPLY STEEL TO PE TRANSITION JOINT

IT. No.

Art.

No.

8 EA/CAD

SUPPLY AND INSTALL INOX EMERGENCY

EYEWASHES / SHOWERS STATION, TYPE DENIOS

G1991

IT. No.

Art.

No.

9 EA/CAD

SUPPLY AND INSTALL HEATED/FROST PROOF - 25 C,

EMERGENCY EYEWASHES / SHOWERS STATION,

TYPE DENIOS MB250

IT. No.

Art.

No.

10 EA/CAD

TOTAL PART II MECHANICAL WORKS

Part III - ELECTRICAL WORKS

27 SUPPLY AND INSTALL ELECTRICAL CABLEDUCTS AND PITS

IT. No.

Art.

No.

1 LS/AC

28 SUPPLY AND INSTALL ELECTRICAL FEEDING LINE FOR

EMERGENCY STATIONS AND CIRCTUITS BREAKER

IT. No.

Art.

No.

2 LS/AC

TOTAL PART III ELECTRICAL WORKS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

INSTALL EMERGENCY SHOWERS/EYEWASHES FOR ACFT, MX

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 10-1032 AREA F, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO. ITEM UNIT OF

MEASURE QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE TOTAL OTHER DIRECT

COSTS LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

SUMMARY

Part 1

Part 2

Part 3

TOTAL/TOTALE

INSTRUCTIONS FOR COMPLETING THE FORM

TOTAL MATERIAL COSTS Euro

TOTAL LABOR COSTS Euro

TOTAL OTHER DIRECT COSTS Euro

TOTAL DIRECT COSTS Euro

OVERHEAD % Euro

SUBTOTAL Euro

PROFIT % Euro

TOTAL PRICE Euro

DATE NAME

TITLE BY

(Signature)

INSTRUCTIONS TO OFFERORS

1 euro = #DIV/0! $1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all

ASHE 10-1032 Blank Cost Est.
WORK ITEMS LIST
ASHE 10-1032 Blank Cost Est..pdf
Totali