U.S AIR FORCE
STATEMENT OF OBJECTIVES
GIANT VOICE (GV) SYSTEM UPGRADE
Aviano Air Base, Italy 12 Aug 2015
Prepared By 38 ES
FA5682-15-Q-5106, SOO Page 1 of 16
FA5682-15-Q-5106, SOO Page 1 of 16
1.0 SCOPE. This Statement of Objectives (SOO) defines the requirements for the contractor to Engineer, Design, Furnish, Install, and Test (EDFI&T) a Giant Voice (GV) System required at Aviano AB, Italy. Aviano AB currently has ten (10) existing Whelen outdoor omni-directional siren speakers. The current GV components have degraded due to age and the upgraded wireless components have created a non-standardized system configuration. The existing metal poles are in good condition and can be reused. The requirement will replace the current GV system equipment which communicates via two-way radio frequency communication infrastructure.
This project covers the following technical objectives.
1.1 Replace the current Giant Voice system components with an approved controller units. The current Whelen system at Aviano AB, Italy currently communicates via two-way Radio Frequency (RF) to all siren speaker towers throughout the base.
1.2 The two current central control systems, located at the Command Post and the Alternate Command Post, shall be replaced with compatible, maintainable controllers, two-way control communication software, PC based computers, and monitors for control, activation and display of siren speaker’s status.
1.3 The upgraded GV system shall provide terrorist attack announcements, weather warnings, Force Protection, chemical spills, active shooter, local accidents affecting base operations and/or general announcements.
2.0 GENERAL REQUIREMENTS. The contractor shall provide all equipment, software, speakers, wiring, power, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to EDFI&T the requirements as stated in this SOO.
The contractor shall replace the current GV system, plus all required support for Radio Frequency (RF) infrastructure, solar cells and control center equipment and software. All equipment, materials and software shall be new and not refurbished. The existing solar arrays, poles, radio, and antenna will be reused and will be installed and connected to the new siren controller units. The existing Motorola CDM750 radios shall be removed from the existing siren controllers and reinstalled in the new siren controller units. The Contractor shall utilize walk-thru information to analyze the project requirements, perform engineering design tasks, and develop the data deliverables.
Note 1. The solar panels hook into a Whelen solar regulator which charges the batteries inside of the siren controller cabinet.
Note 2. The radios that are currently connected to the Whelen system would need to be pinned out and terminated into the new GV system. The reason for keeping the current radios is so the base would not have to request for a new frequency. If the new system cannot be connected to the CDM 750s, the proposed radio system shall be able to provide coverage to area 1 of the base (about 8 miles line of site from the base) and operate on the existing VHF frequency (XXX.250 MHZ band). Otherwise, a new frequency will need to be approved. This process is a lengthy process and will require host nation approval as well as the supportability in Italy.
FA5682-15-Q-5106, SOO Page 2 of 16
FA5682-15-Q-5106, SOO Page 2 of 16
2.1 Safety Requirements. The Contractor shall meet with the base safety officer immediately upon arrival on site for review of the specific safety requirements prior to installation.
2.1.1. Accident/Incident Reporting and Investigation. The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel to the Wing Safety Office unless otherwise stated in the SOO. The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the 31 CS/SCXP. If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.
2.2 Security Requirements
2.2.1 Secure Areas. Some of this work will take place in secure areas where Contractor employees must be escorted at all times. The Contractor must coordinate access to secure areas at least seven (7) calendar days ahead of time. It is the Government's responsibility to provide escorts.
2.3 Environmental Management. The Contractor shall comply with the most stringent environmental Aviano AB, Italy, local laws and regulations; and Air Force policies, instructions, and plans. The Contractor shall maintain an awareness of changing environmental regulatory requirements to avoid environmental deficiencies for activities on Aviano AB, Italy. The Prime Contractor shall ensure their sub-contractors comply with these specifications.
2.4 Permits. No digging, construction, or alteration of real property is anticipated as part of this project since the intent is to reuse existing infrastructure. If the pre-proposal site visit or a submitted proposal reveals the need for construction work, the contractor must meet any applicable Italian Societa Organismo Di Attestazine (SOA) certification requirements to be considered for award. The Contractor shall be responsible for coordination with Base Civil Engineers (CE) on completion of AF Form 103 Digging Permits before any digging is accomplished. The contractor shall complete and process all permits to 31 CS/SCXP approximately six (6) weeks prior to commencement of work.
2.5 Integrated Product Team (IPT). The contractor shall chair a weekly IPT meeting that includes Contractor representatives, the Contracting Officer (CO), the 38 CSI-B, representatives of 31 CS/SCXP and all required base personnel from Aviano AB, Italy. The contractor shall provide a worldwide “Meet Me” Teleconference capability for the duration of the project. The purpose of this meeting is to discuss project progress, problems being encountered, and other discussions necessary/beneficial to ensure success and timely completion of the Task Order. The contractor shall be responsible for the meeting minutes. A copy of the minutes shall be provided to each attendee and disseminated via e- mail addresses (CDRL A004).
2.6 Quality Assurance. The Contractor shall provide a Quality Control Program for the entire life of the project. The Contractor’s quality assurance evaluator shall assist the Government representative in performing random spot checks and system acceptance tests. The Contractor
FA5682-15-Q-5106, SOO Page 3 of 16
FA5682-15-Q-5106, SOO Page 3 of 16 shall be responsible for identifying system and outside plant deficiencies and/or discrepancies throughout the life of the project. A weekly report (soft copy) shall be submitted indicating progress/status and listing any deficiencies/discrepancies found and actions to correct them
(CDRL A003).
2.7 Contractor Personnel
2.7.1 Project Management. The Contractor shall provide a Project Manager (PM) and alternate(s) responsible for contract performance and continuity. The Contractor shall identify the Project Manager’s or alternate's range of authority to act for the Contractor relating to daily contract operation.
2.7.2 Site Point of Contact (POC). The Contractor shall designate the Contractor's on-site team leader and alternate(s) as the Site POC for individual projects in their Site Visit Request Letter.
The Site POC or alternate(s) shall be on site during duty hours until project completion. The Site POC shall be the interface for all work site communications with the Government, including quality, safety, and discrepancy matters.
2.7.3 Enterprise-Wide Contractor Manpower Reporting Application (ECMRA) The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for upgrading the Aviano AB, Italy Giant Voice system via a secure data collection site. The contractor is required to completely fill out all required data fields using the following web address at:
http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September
30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the ECMRA help desk.
2.8 Warranty. The Contractor shall warranty the products of its manufacturer to be free from defective material and workmanship. Break-fix support for hardware and software related to the new GV system shall be provided for one year after the GV system acceptance date, to include all field trips, telephone support, and shipping costs.
2.9 Out-brief. The Contractor shall conduct an out-brief with the 31 CS/SCXP POC or designated representative at the conclusion of the implementation. The implementation out-brief shall inform the customer of implementation results and necessary maintenance issues (including warranties).
2.9.1 Manuals and Practices. The Contractor shall provide the latest version of operation, installation, and maintenance manuals and practices/users guide for each system installed as provided by the original manufacturer with all new or upgrade equipment.
FA5682-15-Q-5106, SOO Page 4 of 16
FA5682-15-Q-5106, SOO Page 4 of 16
3.0 SPECIFIC REQUIREMENTS
3.1 Outside Plant Requirements. The contractor shall EDFI&T the communications infrastructure needed to install a new GV system. The contractor shall use existing poles, radios and solar power sources at existing locations and shall provide as-built drawings upon project completion (CDRL A001).
3.1.1 The contractor shall reutilize the existing poles; the locations of the poles are identified in figures 1 and 2 below.
3.1.2 The contractor shall install the proper weatherproof head devices to prevent moisture from entering the dedicated electrical and communication systems.
3.1.3 The contractor shall ensure the appropriate voltage and current are provided to the siren tower location electrical load. The contractor shall test the voltage, current, wire size, distance, transformer size, fuses, breakers, voltage, current limiting devices, and other variables to ensure they are correctly utilized to drive the new load.
3.1.4 The contractor shall coordinate with 31 CS/SCX and 31 CES before energizing all new power loads.
3.1.5 The contractor shall comply with all applicable documents including standards in paragraph 5.2.
3.1.6 Upon project completion the contractor shall provide configuration management the as-built drawings and documentation of the installed system, including the predicted and tested audible coverage areas. (CDRL A001)
3.2 Installation Requirements.
3.2.1 Restoration. Any wall penetrations shall be restored to meet NFPA 1, NFPA 70 and NFPA 72 standards.
3.2.2 Grounding. The contractor shall ground new copper cable to the Telecommunication Main Ground Bus-Bar (TMGB), near the terminal in all communication rooms. Contractor shall properly ground electrical power installs in accordance with base, local, state and federal codes, laws and National Electric Code’s most recent edition and in paragraph 4.2. In addition, contractor shall abide by the regulations listed within Motorola Standards and Guideline for Communications Sites “R56” 68P81089E50 manual. It states “Ground all RF transmission lines from the antenna structure to the shelter or building as described in Chapter 6.” And “Upon entering the building, all RF transmission lines shall route through a coaxial RF-type Transient Voltage Surge Suppression (or Surge Protection Device). Technical Order (TO) 31-10-24 “Installation Practices – Communication Systems Grounding, Bonding, and Shielding” must also be adhered to.
FA5682-15-Q-5106, SOO Page 5 of 16
FA5682-15-Q-5106, SOO Page 5 of 16
3.2.3 Bonding. Shield bonding connectors, bond bars, braids, ribbons, clamps, etc., shall be provided to maintain cable shield continuity at splices and at ground connections. Bonding connectors shall be provided IAW the Rural Utilities Service (RUS) Bulletin 1753F-803 (PE- 33). Shields shall be grounded and continuous throughout the cable distribution system.
3.2.4 Power Source. The existing unit on each pole operates on solar cells. If the new system operate the same way as the Whelen system does, the solar panels would provide sufficient power (if the system has enough battery power to operate). Currently each stack has 4 Optimum batteries with 900 CCA each which would be charged during the day by the solar panels and hold enough charge to operate at night.
3.2.5 Giant Voice (GV) System Installation. The contractor shall remove the existing ten (10) outdoor siren controller units and replace them with the new outdoor siren controller units. The existing Motorola CDM750 radio shall be removed from the existing outdoor siren controllers and be installed in the new siren controller units.
3.2.5.1 The outdoor siren controller cabinets must be rated NEMA-4 (if needed), digital two-way communication, 128 bit encrypted security, and provide feedback status to the central control stations.
3.2.5.2 Polyphasers will be required for lighting protection for the radio transceivers.
3.2.5.3 The upgraded GV system shall provide pre-recorded voice alert messages, informational messages, action to be taken, playing of taps, retreat, reveille, and active shooter announcement messages to all personnel in the event of an emergency, terrorist threats, Force Protection contingencies, and exercises. Note: The pre-recorded messages will be provided upon contract award.
3.2.6 Features and Capabilities. The upgraded GV System shall provide the following features and capabilities:
3.2.6.1 The contractor shall provide a solution to install the new weatherproof high power speaker arrays (HPSA) and controllers at the current siren locations. The new siren speaker arrays shall provide adequate and intelligible live voice and prerecorded message coverage for the entire base populace including the following populated areas (see figures 1 and 2):
FA5682-15-Q-5106, SOO Page 6 of 16
FA5682-15-Q-5106, SOO Page 6 of 16
Figure 1 – Area F
FA5682-15-Q-5106, SOO Page 7 of 16
FA5682-15-Q-5106, SOO Page 7 of 16
Figure 2 - Areas 1 & 2
3.2.6.2 The siren speakers shall deliver alert, warning and informational messages of what to do before, during and after an emergency, exercises or disaster by the operators at the Primary central control station at the Primary Command Post (CP) (Bldg. 1360), and the Alternate Command Post (Bldg. 1135).
3.2.6.3 The Primary and Alternate Central Control Stations shall transmit emergency announcements as live voice messages to alert and warn base personnel through remote siren speakers via microphone to any individual or group zone or all zone speakers.
3.2.6.4 Activation and control subsystems. The contractor shall utilize the existing radios;
however, should the contractor propose a new radio system, the radio for all system communications shall be approved by US Military Communications Electronics Board J/F-12 (Joint/Format-12), have supportability in Italy, and be capable of utilizing a Frequency Shift Keying (FSK) modulation scheme. The contractor shall provide activation and control with the FSK format.
FA5682-15-Q-5106, SOO Page 8 of 16
FA5682-15-Q-5106, SOO Page 8 of 16
3.2.6.5 The contractor shall provide two-way communications central station encoders for the Primary and Alternate control stations. The encoder shall have the latest software features and be capable of integrating with the current AtHoc net-centric network alerting system.
3.2.6.6 The system shall allow operators to activate remote siren controllers independently, in groups, or as an entire system. The system shall be equipped with a silent test diagnostic that allows it to test all major system components without producing an audible signal.
3.2.6.7 The remote siren controllers shall allow for multiple activation sequences to be programmed from the primary or alternate control stations or locally at the site.
3.2.6.8 The Siren Controller Unit shall utilize a separate battery cabinet that isolates the batteries from the electronic circuitry. The system shall be equipped with a silent test diagnostics that allows it to test all major system components without producing an audible signal.
3.2.6.9 The Siren Controller Unit shall use extremely efficient hot swappable pulse width modulated amplifiers or single board amplifiers to provide the highest reliability and efficiency in a small modular weatherproof enclosure. Controller units shall be powered from standard 12VDC batteries, and the sirens shall operate continuously for at least 30 minutes in tone and voice.
3.2.6.10 The amplifier shall be a modular component, which is hot swappable or single board amplifier, allowing easier maintenance and increased redundancy.
3.2.6.11 The encoder shall be programmed to perform automatic testing of all speakers in the system, weekly and/or monthly routine report, quiet testing, growl testing, or a full system test.
3.2.6.12 A detailed sound propagation analysis shall be performed to determine the exact siren speaker’s size and intelligible voice coverage. (CDRL A006)
3.2.6.13 Each outdoor siren speaker’s poles shall utilize solar power as the primary power source.
3.2.6.14 The GV system shall be operated on the current operating designated VHF frequency (XXX.250) which was assigned by the base spectrum manager.
3.2.7 System Interface. The GV System shall provide the following features:
3.2.7.1 Application Programming Interface (API) to remotely activate audible alerts.
3.2.7.2 Standard TCP/IP network protocols, RS 232, RS-485, and audio-in input.
3.2.7.3 The API shall conduct all interactions using XML messages conforming to the OASIS (Organization for the Advancement of Structured Information Standard) Common Alerting Protocols (CAP) Standard.
FA5682-15-Q-5106, SOO Page 9 of 16
FA5682-15-Q-5106, SOO Page 9 of 16
3.2.7.4 The API shall allow an external system to initiate specified pre-recorded audio alerts in the Giant Voice/PA system.
3.2.7.5 Target activation of specific sirens or speakers.
3.2.7.6 Request reports on the status of delivery and activation of an alert already in progress;
specifically, if the alert was delivered to all targeted speakers and these speakers are sounding the alert.
3.2.7.7 Terminate an alert already in progress.
3.2.7.8 Request reports on system health status, replying with a detailed response.
3.2.7.9 The Giant Voice system shall allow the activation of target siren or speaker via dry-contacts and audio-in input.
3.2.8 Pre-programming. The GV system shall be pre-programmed with the following messages:
Note: This is intended as a general list and the exact list will be made available upon contract award.
3.2.8.1 Broadcasting Messages:
Westminster Chime Attack Warning Disaster Warning FPCON Alpha FPCON Bravo FPCON Charlie FPCON Delta Lightning Announcement All Clear Hazardous Material Severe Weather Recall Message Active Shooter Announcement Heat Advisory Start/End Weather Warning To The Colors Retreat, Bugle Reveille Bugle Taps The National Anthem Retreat/Anthem Lock down End Message Indicator
FA5682-15-Q-5106, SOO Page 10 of 16
FA5682-15-Q-5106, SOO Page 10 of 16
3.2.8.2 Broadcasting Tones:
Alt Steady Alt Wail Pulse Steady Pulse Wail
3.2.8.3 Broadcasting Voice:
Public Address Audio level (line-level) input
3.2.8.4 Control System will perform the following functions:
Reset - used to reset all poles Cancel - used to cancel a message in mid-stream Test Message Silent Test
3.2.9 Zone Selectable. The GV system shall provide a speaker zone selective capability. All zones are linked to provide simultaneous activations and selective zone ability to activate each individual zone or group of zones or all zones. The GV system shall allow for the pre-configuration of at least ten (10) zones, which can be selected by the operator to promptly issue an announcement to the selected area.
3.2.10 Override Capability. Not applicable
3.2.11 Central Control Stations. The new GV system shall have two-way RF communications alarm software with graphics screen for control and status monitoring. The system shall be capable of being activated, monitored, and controlled and receive real-time remote status monitoring of all system activities from the Primary Command Post and alternate Command Post.
3.2.12 Command Post Building. The contractor shall provide a Desktop PC with Windows 7 OS, 22 inch monitor and ink jet printer, encoder, desk mount noise canceling microphone, Smart UPS (120VAC), software package and the radio base station. The CDM750 (or the new proposed radios) VHF base station radio shall be installed in the communications room.
3.2.13 Alternate Command Post Building. The contractor shall provide a Desktop PC with Window 7 OS, 22 in monitor and ink jet printer, encoder, desk mount noise canceling microphone, Smart UPS (120VAC), software package, and the VHF base station radio. The radio shall be installed in the communications room.
3.2.14 Backup Power for Control Stations. The Contractor shall provide each central control station with its own backup power (UPS) to maintain operations during emergencies that could result from temporary loss of normal base utilities. Backup Power Capacity for fire alarm systems is defined in the National Fire Alarm Code, NFPA 72, and section 4.4.1. As stated in Annex E of NFPA 72, mass notification systems should have the same backup power capacity as
FA5682-15-Q-5106, SOO Page 11 of 16
FA5682-15-Q-5106, SOO Page 11 of 16 fire alarms. NFPA 72 states that the secondary supply for the control station shall be capable of supporting alarm operation for a minimum of 4 hours.
3.2.15 Backup Power for Siren Speaker Locations. Each speaker location shall be operated on solar cells (existing) as their main operating power source.
3.2.16 Wiring and Infrastructure. The contractor shall furnish and install all signaling wiring to include RF to provide control of the GV system.
3.2.17 Electrical Power. Contractor shall install electrical power to the system by connecting to base utilities. The base Civil Engineering Squadron (31 CES) will identify the facility and power for supplying the electrical power. The Government has identified the recommended electrical power sources. The Base will provide the power source list at the pre-proposal walk through.
Coordinate with Civil Engineering Electrical Shop on power removal, modification, and/or installation feeds at each site. Installations must comply with NFPA 70 (National Electric Code) and UFC 3-520-01 low voltage requirements.
3.2.18 Coordination. All support infrastructures shall be coordinated and approved by the 31 CS/SCX and 31 CES.
3.2.19 Audible Signal. When broadcasting tone alerts for different warnings and when used as a vocal GV system for command and control instructions, the speaker system shall produce an audible signal and intelligible voice messages to any personnel located in the populated areas.
3.2.20 Music and Voice. The new GV system shall be capable of broadcasting standard military music selections and recorded voice.
3.2.21 Onsite Training. Upon completion of the installation process, the Contractor shall provide User Training to the designated Site Staff in accordance with the customer requirements.
User training shall include step-by-step instructions on the utilization of all features of the new system as well as basic system troubleshooting. The Contractor shall provide operational training to the users and system training to the Operators/Maintainers as needed. Instructional sessions including training slides/guidance/documentation shall be permitted to be videotaped for future training purposes. The Government shall retain the right to duplicate and distribute the training material for future training purposes. This training shall include setup, configuration, operations, and user diagnostic, repair and replacement. The contractor shall conduct a classroom instruction on the system to include the operational and maintenance requirements of the system for up to twenty (20) students utilizing a government approved training plan. (CDRL A007)
3.2.22 Legacy System Removal/Site Restoration/Debris Removal. The contractor shall remove existing GV equipment and infrastructure (electronics, cabling, and power) which is not used in the project, to include all spares. Coordinate with Civil Engineering Electrical Shop on power removal, modification, and/or installation feeds at each site. Installations must comply with NFPA 70 (National Electric Code) and UFC 3-520-01 low voltage requirements. All equipment and residuals from this project including amplifiers, conduits and cabling shall be disposed of or handed over to the Defense Realization and Marketing Office (DRMO) at Aviano
FA5682-15-Q-5106, SOO Page 12 of 16
FA5682-15-Q-5106, SOO Page 12 of 16
AB, Italy as directed by the contracting officer. Prior to project completion, the contractor shall remove all debris and surplus materials from the work place. Equipment and materials required to complete the work effort may remain on site during the project as long as they are organized/stored in a manner that does not cause a safety or security hazard.
3.2.23 Final Acceptance. The Contractor shall schedule a final project walk-through and complete system test of all work completed prior to close out with the government representative from 31 CS/SCXP and the contracting officer. This should be scheduled at least 5 calendar days prior to the acceptance. The contractor shall perform testing and inspections of the GV systems IAW the approved test plan. When any system, subsystem, component or requirement test fails to meet the requirements of the test, Government acceptance will be withheld until such time as the cause of the failure is corrected to the Government’s satisfaction. After appropriate corrective action has been taken, all tests including those previously completed related to the failed test and the corrective action shall be repeated and successfully completed prior to Government acceptance. (CDRL A005)
3.2.24 Service Outages. The Contractor shall prevent any unscheduled (i.e. cutting or disabling any in-service cables or equipment.) interruptions of communications capabilities. The Contractor shall coordinate planned outages with 31 CS/SCXP in advance of the outage if the implementation necessitates disruption of service, (e.g., communications, electrical, or other utilities).
3.2.25 Identification/Marking. The Contractor shall clearly mark all Contractor-Furnished Property and Equipment (CFP/CFE) with their company's name. The Contractor shall place an easily read, very visible, sign (minimum 8.5" x 11") on large containers, construction equipment, or un-manned rental vehicles while on the Government installation indicating the company name and both the Contractor and Site POC's names and local telephone numbers. The contractor shall label all equipment and cables they install in accordance with ANSI/TIA/EIA-606-A-2002.
3.2.26 Installation Schedules. The Contractor shall provide a complete milestone schedule that denotes project activities to include time-phased start and completion dates for the project and sub-projects associated with the installation of the components and system. (CDRL A002)
3.2.27 Weekly Status Reports. The Contractor shall prepare a Weekly Status Report and distribute IAW CDRL A003. The purpose of the report is to inform IPT members of project progress, problems being encountered, and other topics necessary/beneficial to ensure success and timely completion of the contract requirements.
3.2.28 Red-Line and As-Built Drawings. The contractor shall submit drawing showing the “as built” configuration in Visio format. The As Built Drawings shall include the locations of all existing and the upgraded tower locations; the Global Positioning Satellite (GPS) coordinates of each tower location, the logical diagram of the GV system, the facility location of the GV equipment, a floor plan of the room location, power source facilities and connections, a rack elevation plan of the GV equipment, and tested coverage areas for Aviano AB, Italy. The coverage area drawings shall be shown on a satellite image of the coverage areas with the street names, facility locations and other geo-references shown. (CDRL A001)
FA5682-15-Q-5106, SOO Page 13 of 16
FA5682-15-Q-5106, SOO Page 13 of 16
3.2.29 Restricted Access Areas. Aviano AB, Italy has some restricted areas where access is limited and requires Government escorts. The Contractor must coordinate access to secure areas at least seven (7) calendar days ahead of time.
3.2.30 Test Plan. The contractor shall submit a written test plan that details how they will test the new GV system, all station encoders, all siren speakers arrays, and ensure compliance with Unified Facilities Criteria (UFC) 4-021-01. In addition, the contractor shall submit written instructions to system operators for conducting periodic system tests. The test plan shall include the Cutover Plan. The new GV system shall be tested and demonstrate to the Government that the system is fully operational and meets or exceeds the specified requirements and that the system is fully ready to be placed into service IAW CDRL A005. These tests shall be accomplished prior to the system being placed into service.
3.2.31 Acceptance/Installation Test Report. The Contractor shall provide an installation test report of the results of the testing accomplished under the installation test plan. CDRL A006
3.2.32 Cutover Plan. The contractor shall provide a detailed cutover plan to delineate how the transition shall be implemented to minimize or avoid GV system down time. This plan shall outline how the system shall be placed into service and clearly specify how the newly installed system shall connect to the existing base system. CDRL A005
3.2.33 Testing Requirements. The contractor shall furnish all test equipment and personnel required to conduct all required testing. The contractor shall document all test results in a “Test Report(s)” and submit to local 31 CS/SCX within 5 calendar days of completion of each test.
During any testing phase, the Government reserves the right to perform any of the contractor performed inspections and tests to assure solutions conform to prescribed requirements. The contractor shall provide on-site support during the acceptance testing. CDRL A006
3.2.34 Line of Sight Test. The contractor shall test two-way RF transmit and receive communications signals from the Central Control Stations and Antennas (Primary and Backup) to the Remote siren controller units and Antennas. Test shall be accomplished to ensure the new GV system will obtain good RF communications signals.
4.0 GENERAL INFORMATION
4.1 Period of Performance. The period of performance for this project is 180 days after date of contract. All work including installation, training, testing, and acceptance must be completed with this timeframe.
4.2 Place of Performance. The place of performance is Aviano AB, Italy.
4.3 Hours of Operation. The Contractor shall perform the services required under this contract during normal duty hours of the facility where work is being performed. At Aviano AB, Italy, normal duty hours are: 0730 – 1630 CET. Any other work schedule outside of normal duty hours requires Contracting Officer (CO) approval. The Contractor shall not perform work under this
FA5682-15-Q-5106, SOO Page 14 of 16
FA5682-15-Q-5106, SOO Page 14 of 16 contract on US Federal holidays or site-unique down-days unless expressly authorized by the CO. Part or all of the facility may be occupied during this effort. Contractor shall accomplish the installation with minimum disruption of daily office activities. If performance of work outside normal duty hours will be required to meet the scheduled dates stated above, include desired working hours in the Proposal.
4.4 Base Support. The laydown and dry storage areas will be provided upon request. The contractor shall secure this area if needed.
5.0 GOVERNMENT FURNISHED EQUIPMENT/STANDARDS/ DELIVERABLES
5.1 Government Furnished Equipment. The existing GV system at Aviano AB, Italy consists of the following:
10 Metal poles 10 Motorola CDM750 radio 10 Solar Panels with 4 ea. batteries per stack
5.2 Government Applicable Documents and Standards. The contractor shall comply with these documents during the performance of this contract. The contractor shall obtain and comply with any other applicable manuals not identified in this SOO that would be required to meet industry standards.
UFC 4-021-01; 9 Apr 2008, change 1, Jan 2010 - Design and O &M: Mass Notification Systems UFC 4- 010-01/02 - Minimum Antiterrorism Standard for Buildings AFI 10-2501 - AF Emergency Management Program Planning and Operations Executive Order 13407, 28 Jun 2006 - National Public Alert and Warning System Secretary of Defense Memorandum: Final Recommendations of the Ft Hood Follow-On Review, 18 Aug DoDI 6055-17, 13 Jan 2009 - DoD Installation Emergency Management (IEM) program incorporating change 1, Nov 19, 2010 OSHA CFR 29 Part 1910-268 - (1988) Telecommunications REA TE&CM 701/PC-5A - Rural Electrification Administration (REA) REA TE&CM 643 Form 515C - Rural Electrification Administration (REA) NEMA TC 2-1998 - Electrical Polyvinyl Chloride (PVC) Tubing and Conduit ANSI/TIA/EIA-568-B - (2001) Commercial Building Telecommunications (568B-1, 568B-2, 568B-3) Cabling Standard
AVIANO AB, ITALY FOUO REPLACE GVS SOO 38ES/ENII 14
ANSI/TIA/EIA-569-A - (1998) Commercial Building Standard for Telecommunications Pathways and Spaces ANSI/TIA/EIA-606-A - (2002) Administration Standard for the Telecommunications Infrastructure of Commercial Buildings ANSI/TIA/EIA-607 - (1994) Commercial Building Grounding and Bonding Requirements for Telecommunications ANSI/EIA-310-D - Cabinets, Racks, Panels, and Associated Equipment BICSI TDM Manual - (1998) Building Industries Consulting Services International Telecommunications Distribution Methods (TDM) Manual RUS Bulletin 1751F-640 - Design of Buried Plant-Physical Consideration RUS Bulletin 1751F-641 - Construction of Buried Plant
FA5682-15-Q-5106, SOO Page 15 of 16
FA5682-15-Q-5106, SOO Page 15 of 16
RUS Bulletin 1751F-643 - Underground Plant Design RUS Bulletin 1751F-644 - Underground Plant Construction Telecommunications Engineering Shield Continuity and Construction Manual (TE&CM) 451.2 RUS Bulletin 345-65 (PE-33) - RUS Specification for Shield Bonding Connectors RUS Bulletin 345-54 (PE-52) - RUS Specification for Telephone Cable Splicing Connectors RUS Bulletin 345-72 (PE-74) - RUS Specification for Filled Splice Closures RUS Bulletin 345-150 (515a) - Specifications and Drawings for Construction of Direct Buried Plant RUS Bulletin 345-152 (515d) - Specifications and Drawings for Underground Cable Installation Electronics Industry Alliance EIA-310-D - Cabinets, Racks, Panels, and Associated Equipment ANSI/TIA/EIA-758 - Outside Plant Telecommunication Cabling Standard ANSI/TIA/EIA-606 - Administration Standard for Commercial Telecommunication Standard PVC) Tubing and Conduit NFPA 70 - (2011) National Electric Code NFPA 72 - (2010) National Fire Alarm Code AFI 91-203, Chapter 23 - Air Force Consolidated Occupational Safety Instruction Unified Facilities Code (UFC) 3-520-01 (2012), Interior Electrical Systems; Engineering Technical Letter(ETL) 11-29 (2011), Use of Light-Emitting Diode (LED) Fixtures in Airfield Lighting Systems on Air Force Installations and Enduring/Contingency Location. UFC 3-560-01 (2006), Electrical Safety, O&M; UFC 3-535-01 (2005).
Visual Air Navigation Facilities.
NFPA 70E, Standard for Electrical Safety in the Work Place. Aviano AB, Italy Electrical Standards.
UFC 3-520-01 Low Voltage Requirements Aviano AB, Italy Instruction 32-2001 - Fire Emergency Services Program International Building Codes (IBC) of 2012
5.3 List of Deliverables. All deliverables are subject to Government acceptance and approval.
They shall meet professional standards and the requirements set forth in this SOO. All deliverables shall be produced using recommended software tools/versions as accepted by the Government. The Contractor shall submit the following deliverables:
Data Item Title CDRL Data Item Data Item Title Required Date A001 As-Builts DI-DRPR-80151A/T Prior to final acceptance of the project
A002 Work Schedule DI-MISC-81382/T Within 10 days after date of contract
A003 Status Reports DI-MGMT-80368A Weekly on Wednesdays
A004 Meeting Minutes DI-ADMIN-81505/T Within 3 days of meeting
A005 Test Plan & Cutover DI-NDTI-80566A/T Within 30 days after date of contract
A006 Test Report DI-QCIC-80512 Within 3 days after testing
A007 Training Plan DI-ILSS-81070/T Within 60 days after date of contract
FA5682-15-Q-5106, SOO Page 16 of 16