FA5682-14-R-0004-0003_-_Copy.doc
DOC document 44 KB Posted
- Solicitation number
- FA5682-14-R-0004
About this file
AMENDMENT 0003 TO THE SOLICITATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA5682-14-R-0004-0004.pdf | ||
| ASHE_09_1012_BLANK_Est_REV_3_-_Copy.xls | XLS spreadsheet | |
| ASHE_09_1012_att_1_REV_3_-_Copy.pdf | ||
| ASHE_09-1012_SOW_2014_REV3_-_Copy.doc | DOC document | |
| Solicitation_FA5682-14-R-0004_AMENDMENT_0002.doc | DOC document | |
| Attch_2_-_Solar_Panels_Dorms_Schematic.pdf | ||
| Solicitation_FA5682-14-R-0004_AMENDMENT_0001.doc | DOC document | |
| Attch_1_-_Solar_Panels_Dorms_Attic.pdf | ||
| ASHE_09-1012_CCEB_2014_REV__2_Final.xls | XLS spreadsheet | |
| Solicitation_FA5682-14-R-0004_(Solar_Panels_4_Dorms).doc | DOC document | |
| ADD__1_Attachment_Schematic_Drawing.pdf | ||
| ASHE_09-1012_SOW_Addendum__1.doc | DOC document | |
| Master_Technical_Specifications.zip | ZIP file | |
| ASHE_09-1012_CCEB_2014.xls | XLS spreadsheet | |
| Design_Guide_ _Attachments.zip | ZIP file | |
| ASHE_09-1012_SOW_2014_REV_1.doc | DOC document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
THE PURPOSE OF THIS AMENDMENT IS TO:
· REPLACE PROJECT TECHNICAL SPECIFICATIONS IN THEIR ENTIRETY AND
· REPLACE CONSTRUCTION COST ESTIMATE BREAKDOWN FOR SUBMISSION OF OFFERS.
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The performance period code Mandatory has been added.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED HEREUNDER AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE DOCUMENTS LISTED IN SECTION J HEREIN.TECHNICAL SPECIFICATIONS PROJECT ASHE 09-1012 RENEWABLE: INSTALL SOLAR HEATING PANELS, 4 DORMS, FAC# 1423, 1424, 1425, 1426 AREA F, AVIANO AIR BASE, ITALY - REVISION #2 to THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED HEREUNDER AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE DOCUMENTS LISTED IN SECTION J HEREIN.TECHNICAL SPECIFICATIONS PROJECT ASHE 09-1012 RENEWABLE: INSTALL SOLAR HEATING PANELS, 4 DORMS, FAC# 1423, 1424, 1425, 1426 AREA F, AVIANO AIR BASE, ITALY - REVISION #3.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS
The following documents are an integral part of this contract:
a. Attachment 1:
Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November 2005
b. Attachment 2:
Aviano AB Design Guide 2011 Revision including Annexes
c. Attachment 3:
Technical Specifications Project ASHE 09-1012 Renewable: Install Solar Heating Panels, 4 Dorms, Fac# 1423, 1424, 1425,1426 Area F, Aviano Air Base, Italy – Revision #3 marked Statement of Work – Rev #3 and dated Apr 2014.
- 15 pages including cover page and attachment 1 marked Technical Specifications – Rev#3 April 2014
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR INFORMATION OTHER THAN CERTIFIED COST OR PRICING DATA (OCT 2010)—ALTERNATE IV (OCT 2010)
(a) Submission of certified cost or pricing data is not required.
(b) Provide data described below
Completed Construction Cost Estimate Breakdown – Revision #3 (End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .