TBOS Technical Exhibit A - Activated Services Matrix_13 Jul 26.xlsx
XLSX spreadsheet 51 KB Posted
- Solicitation number
- FA564126R0005
About this file
This file is a Technical Exhibit A - Activated Services Matrix for the Türkiye Base Operations Support (T-BOS) acquisition, which identifies the specific base operations support services required at each of six locations in Türkiye. The matrix lists services across six installations: Incirlik Air Base, Ankara Support Facility, US Military Group-Türkiye, Cigli Air Base, HQ NATO LANDCOM, and Istanbul. Services are designated as "Activated" or "TRUE/FALSE" to indicate whether they are required at each location.
The activated services matrix encompasses services across multiple functional categories including Program Management and Core Support Systems, Civil Engineering, Operations Management, Logistics Readiness, and Administrative Services. Civil Engineering services span Installation Management, Asset Management including Real Property Management and Housing Management, Environmental services, Emergency Services, Installation Engineering functions such as Portfolio Optimization and Project Management, and Operations and Maintenance including Heavy Repair and Infrastructure Systems. Logistics Readiness services include Traffic Management, Vehicle Management with fleet operations and maintenance, Ground Transportation, and Materiel Management. Notable variations in service activation exist across locations; for example, Safety and Occupational Health services are activated only at Incirlik Air Base, while Environmental services are primarily activated at Incirlik and limited locations. Emergency Services, Fire Operations, Food Service Operations, Morale and Welfare programs, and certain specialized MAJCOM support services are not activated at any location. This matrix serves as the foundation for scope definition in the T-BOS Performance Work Statement, enabling tailored requirements for each duty location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section L - T-BOS DRAFT RFP-07.17.2026.docx | DOCX document | |
| TBOS PWS Draft - 17 JUL 26.docx | DOCX document | |
| Pre-Award Question and Answer Form-T-BOS Draft RFP.xlsx | XLSX spreadsheet | |
| Section M - T-BOS DRAFT RFP-07.17.2026.docx | DOCX document | |
| Draft Solicitation - FA564126R0005-07.12.2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. Services Matrix
| Technical Exhibit A - Activated Services Matrix |
| This Services Matrix provides a menu of available services. |
The Technical Exhibits "shape" the requirements at each location.
| Incirlik Air Base | Ankara Support Facility | US Military Group -Türkiye | Çiğli Air Base | HQ NATO LANDCOM | Istanbul | ||
| PWS Reference | Service Name | Activated | Activated | Activated | Activated | Activated | Activated |
| 2 | Program Management, Integration, and Core Support Systems. | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE |
| 2.3 | Integrated Data Management System | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE |
| 2.5 | Safety, Occupational Health, and Industrial Hygiene. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 2.5.1 | Protection of Air Force Personnel. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3 | Civil Engineering. | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE |
| 3.1 | Installation Management. | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE |
| 3.2 | Asset Management. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.1. | Asset Accountability. | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE |
| 3.2.1.1. | Real Property Management | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.1.1.1.1. | Acquisition / Disposal | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.1.1.1.2. | Accountability Management | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.1.1.1.3. | Manage Customer Space Allocation | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.2 | Resources. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.2.1 | CE Trend Analysis | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.2.2 | Resources Integration | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.2.3 | Reimbursements / Refunds | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.2.4 | DEAMS and Financial Management Suite | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.2.5 | Accounts Receivable (AR)/Accounts Payable (AP) | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.3 | NexGen IT Administration. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.3.1 | Perform Systems Administration | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.3.2 | IT Security | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.3.3 | Web Page Management and Content Services | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.1.3.4 | IT Acquisition and Assets | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.2.2 | Housing Management. | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.1 | Housing Program Administration. | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2 | Family Housing Management. | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2.1.1 | Housing Referral and Relocation Services Offices | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2.1.2 | Community Liaison and Data Sources | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2.1.3 | Promoting Housing Services | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2.1.4 | Counseling and Assistance | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2.1.5 | Dispute Resolution | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2.1.6 | Community Housing Discrimination | FALSE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2.1.7 | Community Housing Inspections | FALSE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.2.1.8 | General Officer Quarters (GOQ) | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.2.3 | Unaccompanied Housing Management. | TRUE | FALSE | FALSE | FALSE | FALSE | TRUE |
| 3.2.2.4 | Furnishings Management. | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.4.1.1 | Back-Up Stock | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.4.1.2 | Acquisition of Furnishings | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.4.1.3 | Disposition of Furnishings | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.2.4.1.4 | Appliance Maintenance | TRUE | TRUE | FALSE | TRUE | TRUE | TRUE |
| 3.2.3 | Environmental. | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE |
| 3.2.3.1 | Environmental Planning, Programming, Budgeting, and Execution. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.3.2 | Environmental Management System and Inspection Process. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.3.3 | Air Quality. | TRUE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.2.3.4 | Water Quality. | TRUE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.2.3.5 | Hazardous Waste. | TRUE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.2.3.6 | Hazardous Material. | TRUE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.2.3.7 | Toxic Substances. | TRUE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.2.3.8 | Storage Tanks and Petroleum, Oil, and Lubricants. | TRUE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.2.3.9 | Natural and Cultural Resources. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.3.10 | Solid Waste. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.3.11 | Remediation. | TRUE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.2.3.12 | Environmental Impact Analysis Process and Baseline Surveys. | TRUE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.2.4 | Emergency Services. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.1 | Fire and Emergency Services. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.1.1 | Occupational Safety and Health Program | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.1.2 | Fire Operations | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.1.3 | Manning Standards | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.1.4 | Fire Prevention | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.1.5 | F&ES Training | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.1.6 | Emergency Communications Center | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.2 | Ambulance Services. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.2.1.1 | Emergency Response and Patient Transport | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.2.4.2.1.2 | Response to In-Flight Emergencies | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.3 | Installation Engineering. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.3.9 | Portfolio Optimization. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.1 | Planning. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.2 | Conduct Site Planning Process | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.3 | Build District Plans | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.4 | Manage Installation Development Planning Processes | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.5 | Provide Installation Planning Support to Base Comprehensive Asset Management Plan (BCAMP), AMP, and sub-AMP Working Groups | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.6 | Support New Mission Beddown Planning Activities | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.7 | Manage Airfield Obstruction Program | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.8 | Manage Off-Base Planning and Compatible Land Use Planning Activities | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.9 | Provide Facility Space Optimization and Utilization Planning | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.9.10 | Develop And Execute the Facility Demolition / Consolidation Program | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.10 | Program Development. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.10.2 | Provide Project Programming | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.10.3 | Manage Base Comprehensive Asset Management Plan (BCAMP) | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.10.4 | Provide for BCAMP Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.10.5 | Provide BAMP | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.10.6 | Develop and Manage the Installation Facilities AMP | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.10.7 | Provide and Manage Facility sub-AMP Activities | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.11 | Energy Manager. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.11.1 | Provide Energy and Utilities Program Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.11.2 | Provide Energy and Water Resilience Program Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.11.3 | Provide Energy Awareness | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.11.4 | Energy Programs and Projects | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.11.5 | Provide Utility Commodity Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12 | Project Management. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1 | Project Execution. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.1 | Provide Project Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.2 | Provide Design Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.3 | Develop Local A/E and Construction Contract Programs | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.4 | Develop Construction Contract Program Task Orders | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.5 | Initiate Funding Documents (Design, Construction, & Locally Funded Special Studies) | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.6 | Provide Project Execution Services (In-House Construction Management) | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.7 | Other Construction Inspection Requirements | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.8 | Provide MILCON Support | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.9 | Conduct Project Closeout for MILCON and FSRM Projects | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.1.10 | Coordinate Warranty Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.2 | Execution Support. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.2.1 | Installation Geospatial Information and Services (IGI&S) / GeoBase | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.2.2 | Provide Surveying Services | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.2.3 | Provide Drafting Services | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.2.4 | Provide Emergency Response Support | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.3.12.2.5 | Provide Other Engineering Support Functions | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4 | Operations Management. | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2 | Operations Engineering. | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2 | Requirements & Optimization. | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2.2 | Demand Maintenance / Customer Service | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2.3 | Corrective Maintenance Work Task Requirements | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2.4 | Unscheduled Corrective Maintenance - Emergency / Priority 1 | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2.5 | Priority 2A. Plant Operations (Chilled Water) and PM | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2.6 | Scheduled Sustainment Corrective Maintenance- Priority 3 | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2.7 | Facility Operations Facility Projects | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2.8 | Enhancement 4A/4B | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.2.2.9 | Work Request Work Group/Work Request Review Board | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.2.2.10 | In-House Maintenance & Repair Capability/Planning | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.2.2.11 | Activity / Sub-Activity Management Plan | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.2.2.12 | BUILDER Sustainment Management System | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.2.2.13 | Warranty Management | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.2.3 | Service Contracts Management. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.4.2.3.1 | Refuse | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.4.2.3.2 | Grounds | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.4.2.3.3 | Custodial | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.4.2.3.4 | Others | FALSE | FALSE | FALSE | TRUE | FALSE | FALSE |
| 3.4.2.4 | Material Control. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.2.4.2 | U-Fix-It Program Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.2.4.3 | Vehicle Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.2.5 | Building Automation Energy Analysis | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.2.6 | Ancillary Programs. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.3 | Operations and Maintenance. | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.3.1 | Heavy Repair. | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.3.1.6 | Structures | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.3.1.7 | Pavements/Equipment | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.3.1.8 | Pavement Sweeping/Clearance | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.3.1.9 | Infrastructure Systems | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.3.1.10 | Inspect | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.3.2 | Infrastructure Systems. | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.3.2.1 | Environmental Management Control Systems (EMCS)/Operations | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.3.2.2 | EMCS Operation | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.3.2.3 | Water & Fuels Systems Maintenance | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.3.2.4 | Entomology/Pest Management | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.3.2.5 | HVAC | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.3.3 | Facility Systems. | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.3.3.1 | Facility System Maintenance | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 3.4.3.3.4 | Fire Alarms | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.3.3.5 | Electrical Systems | TRUE | TRUE | TRUE | TRUE | TRUE | FALSE |
| 3.4.3.3.6 | Power Production | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 3.4.3.3.7 | Change of Occupancy Maintenance | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.4.3.3.8 | Unaccompanied and Family Housing Maintenance | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.5 | Security Escort Program. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.5.2 | Construction Security Escorts. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 3.5.3 | Construction Projects on the Flightline. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 4 | Communications Support. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 4.1.1 | Operations | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5 | Force Support. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1 | Food Service Operations. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.1 | Culinary and Production. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.1.1 | Food Preparation | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.1.2 | Food Service | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.1.3 | Meals Served Away from Dining Facilities | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.1.4 | Flight Meals | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.2 | Subsistence and Supply. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.2.1 | Prime Vendor Items | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.3 | Facility and Equipment. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.3.1 | Table Service | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.3.2 | Sanitation Requirements | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.3.3 | Housekeeping Services | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.3.4 | Maintenance and Repair | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.4 | Financials and Accounting. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.4.1 | Food Service Accounting | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.4.2 | Cashier Services | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.1.4.3 | Contractor Personnel Meals | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.2 | Morale, Welfare, and Recreation. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.2.1 | Fitness and Sports. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.2.1.1 | Lifeguard and Pool Operations | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.2.2 | Community Support. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.2.2.1 | Library and Information Services | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.2.3 | Resource Management. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.2.3.1 | Publicity Support | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 5.3 | Postal Services. | FALSE | TRUE | FALSE | FALSE | FALSE | FALSE |
| 6 | Logistics Readiness. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1 | Traffic Management. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.2 | Traffic Management Specific Functions. | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.3 | Freight and Cargo Movement. | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.3.1 | Cargo Inbound | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.3.2 | Cargo Outbound | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.4 | Personal Property Movement. | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.4.2 | Transportation and Storage of Personal Property Briefings | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.4.3 | Quality Control Inspections | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.5 | Passenger Travel Program. | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.5.2 | Passenger Special Functions | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.5.3 | Customer Service Assistance | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.6 | Other Traffic Management Functions. | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.6.2 | Other Deployment Training Functions | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.6.3 | Surface Travel | FALSE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.1.6.4 | Customs Border Clearance Program | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2 | Vehicle Management. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.2 | Fleet Management and Analysis. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.2.1 | Technical Order Publications | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.2.2 | TCTO Program | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.2.3 | Vehicle Historical Folder | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.2.4 | Commercial Lease Vehicle Data | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.2.5 | Reports and Analysis | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3 | Vehicle Maintenance. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.1 | Intermediate Maintenance | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.2 | Minor Maintenance | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.3 | Major Maintenance | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.4 | Scheduled Maintenance | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.5 | Mobile Maintenance | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.6 | Operator Care Maintenance | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.7 | Vehicles, Government/SP Provided | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.8 | Operations, Maintenance, Repair and Replacement of Government Furnished Vehicles/Equipment ASC 051 | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.9 | Tire Shop Services | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.10 | Limited Technical Inspections | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.11 | Depot-Level Maintenance | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.12 | Paint and Body Services | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.13 | Vehicle License Plate Program and Federal Motor Vehicle Registration System | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.14 | Fuel Issues | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.3.15 | Air Force IT Systems | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.4 | Materiel Control. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.4.1 | Vehicle Parts, Materials, and Supplies | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.4.2 | Parts Accountability | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.4.3 | Tools and Equipment (Specialized) | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.4.4 | Green Procurement Program | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.5 | Operational Support. | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.5.1 | Base Exercises | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.5.2 | Contingencies | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.5.3 | Accident and Abuse Program | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.2.5.4 | Coordination | TRUE | TRUE | FALSE | TRUE | FALSE | FALSE |
| 6.3 | Ground Transportation. | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.1 | Ground Transportation Management. | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.1.2 | Cost Accounting | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.2 | Dispatch Operations. | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.2.1 | Ground Transportation Operations Center | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.3 | Operator Records & Licensing. | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.3.1 | Training Validation & Operations | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.4 | Movement Operations. | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.4.1 | Passenger and Cargo Movement | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.4.2 | Provide Official Use Transportation | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.4.3 | Deployment and Mobility Operations | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.4.4 | Contingencies | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.4.5 | Cargo Transportation | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.4.6 | Recovery and Wrecker Service | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.5 | Fleet Support and Care. | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.5.1 | Vehicle Inspection/Cleaning | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.3.5.2 | Vehicle Washing Facility | TRUE | TRUE | TRUE | TRUE | FALSE | FALSE |
| 6.4 | Air Transportation. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5 | Materiel Management. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.2 | Asset Management. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.2.2 | Central Storage | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.2.3 | DLA-DS Staging Point | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.2.4 | Stage/RIPL | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.2.5 | Flight Service Center Function | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.2.6 | Customer Support Function | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.3 | Equipment Accountability. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.3.2 | Customer Support Liaison | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.3.3 | Document Control | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.3.4 | Inventory and Inspection | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.3.5 | Computer/Systems Operations | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.3.6 | Inspection Function | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.3.7 | Physical Inventory Control Function | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.5.3.8 | Decentralized Materiel Support | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 6.6 | Fuels Management. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8 | MAJCOM Support. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.1 | Contingency Facilities. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2 | Medical Maintenance Operation Management Services. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2 | Maintenance. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.1 | Maintenance Schedule | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.2 | Work Order Management | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.3 | Preventive Maintenance | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.4 | Scheduled Maintenance Standards | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.5 | Scheduled Maintenance Performance | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.6 | Cancellation of Work Requests | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.7 | Tradesmen Support | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.8 | Emergency Work | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.9 | New Project Work | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.2.10 | Manufacturer Warranty | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.3 | Quality Control Program. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.4 | Refuse and Hazardous Material Collection and Disposal. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.2.5 | Technical Library. | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.3 | Transient Alert. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.3.1 | Flight Operations. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.3.1.1 | Aircraft Reception | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.3.1.2 | Pre-Flight Inspections | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.3.1.3 | Aircraft Crash Damaged or Disabled Aircraft Recovery Program | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.3.2 | Servicing and Maintenance. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4 | War Reserve Materiel. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.1 | Tool Management Program. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.1.1 | Individual General/Common-Use Tools | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.1.2 | Special Tools and Shop Equipment | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.1.3 | Tool Control | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.2 | Aerospace Ground Equipment. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.2.2 | AGE General Tasks | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.3 | Rapid Airfield Damage Recovery (RADR)/War Reserve Materiel Non-Vehicular Equipment. | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.3.2 | RADR Reporting | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.3.3 | Monthly RADR Production Telecon | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.3.4 | RADR Reserve Rate | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.3.5 | RADR Reconstitution | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.4 | WAR Reserve Materiel RADR Vehicles | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.4.2 | Vehicle PMI Intervals/Storage Requirements | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.4.3 | Vehicle Deliverables | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.4.4 | Vehicle Management Information System | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.4.5 | Air Certification Letters (ACLs) | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.4.6 | Special Purpose Vehicle (SPV) Functional Inspection | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.4.7 | Stored Vehicle Serviceability Rate | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5 | Aerospace Ground Equipment (AGE) War Reserve Materiel (WRM) | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.2 | Storage Level | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.3 | Storage and Warehousing | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.4 | Maintenance Control Plan (MCP) | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.5 | Maintenance Deviations | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.6 | Maintenance Requirements | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.7 | Corrective and Preventive Maintenance Program | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.8 | Maintenance | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.9 | Unscheduled Maintenance | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.10 | Preventive Maintenance (PMI) Deferrals | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.11 | Acceptance Inspections (AI) | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.12 | Cannibalizations | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.13 | Time Compliance Technical Order (TCTO) | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.14 | Production | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.15 | Status Data Bases | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.16 | Scheduling | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.17 | Documentation | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.18 | Historical Files and Analysis | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.19 | Corrosion Control | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.20 | Functional Check | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.21 | Warranty Management | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.22 | Contingencies/Exercises | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.23 | Reconstitution | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.24 | Test Measurement Diagnostic Equipment (TMDE) | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.25 | Nuclear Surety Program | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.26 | Material Serviceability | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.27 | Contractor Acquired Parts and Materials (CAP) | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.28 | AGE Reconstitution | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 8.4.5.29 | Special Requirements | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE |
| 9 | Administrative Services | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE |
| 9.2 | Personnel Administrative Services | FALSE | TRUE | FALSE | FALSE | FALSE | FALSE |
| 9.3 | Host Nation Payroll Administrative Services | TRUE | FALSE | FALSE | FALSE | FALSE | FALSE |
File details come from the government source that posted it. Updated .