Technical Description

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA561318QHVAC

Attachment 5

TECHNICAL DESCRIPTION

Ventilation equipment and air circulation

The technical room is located on the first and second floor of the Annex West building. Altogether 3 systems were installed. The overall technical criteria of the ventilation systems are:

Win ter

Summer

-12°C (10,4°F)/80% r.F.

+32°C (89,6°F)/40% r.F.

Supply air system Hangar LO L.1 + LO 1.2

Exhaust air system Hangar L02.l+ L02.2

Make:

Type:

Air amount supply air:

Air amount exhaust air:

KLIMATEC

KZG-KO-RAL-09003

2 x 55.000 m3/h

2 x 55.000 m3/h

In the area of the hangar bay supply air and exhaust air ventilation will be conducted wi th

1 10.000m3/h. The outside air is filtered, heated up to I 5,6°C and humidified to 40%.

For the energy optimization, a circulatory combination system wi th heat recovery is planned.

Based on the specific weight of the fuel gases, air guidance from top to bottom takes place. The processed supply air is inserted through a channel system on the technical grid. Additionally y two industrial source air outlets are installed on the outer walls.

The exhaust air direction takes place through an accessible ground channel wi th concrete exhaust air channels.

Supply air system hydrofoil/foam dry room and cell test room L03

Exhaust air system hydrofoil L04

Air amount nt supply air: Air amount exhaust air:

KLIMATE

KZG.KZG-KO-RAL-01 603

7.250 m3/h

4.000 m3/h

( The ventilation system is needed for maintenance work on the hydrofoils. The foam dry room is also supplied with fresh air through this system.

The supply and exhaust air d irection for the hyd rofoils is conducted through a hose rewinder mounted above the technical grid. Ifnecessa1y the hoses can be rolled down to the hydrofoils and attached to the hydrofoils.

The supply air provision of the dry foam room is conducted through a channel system which is mounted under the ceiling. The exhaust air direction is conducted through grid inlets near the floor.

Supply air system Annex building LOS

Exhaust air system cell test room/dry foam room L06

Air amount supply air:

Ai r amount exhaust air:

KLlMATEC

KZG.KZG-KO-RAL-00903

3.960 m3/h

3.250 m3/h

The lounges/break rooms, the social areas, the tool room, chief of shop room, administration and celt test room arc ventilated and vented.

The processing of the outside air is conducted as in the system LOI . The necessary temperature increase the break areas, the offices and the social areas is conducted through a decentralized after burner . The exhaust air of the break areas, the offices and social areas is vented through separate exhaust air ventilators mounted in the subceiling on the first floor.

The exhaust air of the cell test room is conducted through the exhaust air system L06.

The air circulation is located under the ceiling, respectively in the hollow ceiling space. Ln the break areas and offices turn outlets are installed. In the socia l areas ventilation valves arc installed.

Fire prevention I f the exhaust lines cross th rough a fire protection zone, fire protection va lves will be installed . After installation of the fire protection valves, they will be joi ned wi th fire protection mortar to the buildi ng shel l.

Insulation The supply air is insulated through 30mm aluminum clad mineral fiber. The outside air will be

( , insulated wi th 40 mm aluminum clad mineral fiber. Heat i sulation will be IAW current regulations.

In areas of possible mechanical strain, the insulation will be a cover made of A LU-coarse grain.

Air recirculation air equipment

The inside unit of the air recirculation system is installed in the server room Annex -East.

Di rectly above, in the attic, the outside unit is installed. The drip water line leads into the heating room.

Ai r recirculation unit

Make: POLEN Z

Cooling capacity: 5 KW

Maintenance Schedule for Air Ventilation and Air

Handling Unit Hangar CS Bldg 3330

Overall Monthly Quarterly Annually As Required

Inspect and test for the cleanli ness of the fi l ters (flat, angle, rigid, bag, H EPA & charcoal ) and replace or clean filters that arc d i rty or inefficient.

x

Veri fy fil ter gauge and/or swi tch fu nctions pro perly. x

Thoroughly inspect and clean al l condensate drains. x

I nspect and report on fi lter condition based on static pressure drop. x

Maintai n equ ipment i n a clean cond i t ion x

Replace as required, fi lters will be chargeable and the cost will be incl uded above with scheduled work based upon best estimate of contractor

I nspect, test and maintai n filter frames (fil ter tracks) for residual contan1inates and clean as necessary lnspect, test and maintai n drive ki t for damage, loose parts, wear, d i rt , a l ignmen t and belt tension.

lnspecl, test and main tain bell tension. Replace belts when i nspection reveals weakness or wear.

Inspect, test and mai ntai n cond i tion of extended l u bri cation l i nes when present.

Clean dan1pers. test operation, lubricate and adjust control s as necessary to ensure smooth operation .

Inspect motor bearings, test and lubricate as results warrant.

Measure current draw of electric motors, replace prior to failure.

Test operation of crankcase heaters, replace when compressors arc services i f warranted by test results.

Inspect and ti h ten all loose electrical connections in mechanical swi tch board and control panel.

Clean exterior of air handler cabinet. x

Inspect doors, hand les, latches and hinges for proper operation.

Inspect door gaskets for damage and proper seal x

Inspect panels for damage. x

Clean fan segment and fan assembly (supply, ret urn, exhaust).

Inspect test and maintain fan housing, wheel, shaft, frame.

inlet vanes and bearings for damage, wear, loose parts, dirt and debri s

Inspect. test and mai ntain Oex connector for damage and wear.

Lubricate fan bearings x Clean variable inlet vanes. x Inspect, test and maintain adjustable fan motor base and mounting hardware for loose parts.

Inspect, test and maintain adjustable fan motor base for damage.

Maintain, Inspect and service all technical and administrative system components IAW DIN 31051