Atch_4 _PMP-QCP_27May15.doc
DOC document 34 KB Posted
- Solicitation number
- FA5613-15-R-0007
About this file
Performance Management Plan (PMP)/Quality Control Plan (QCP)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Comb_Synop-Sol_15-R-0007_26May15.doc | DOC document | |
| Atch_6 _EMS_Flyer.doc | DOC document | |
| Atch_2 _PWS_22_Apr_15_final.doc | DOC document | |
| Atch_1 _Pricing_Schedule__26_May_15.doc | DOC document | |
| Atch_5 _PPQ_19May15.doc | DOC document | |
| Atch_3 _Clauses Prov_26May15_final.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4, PMP/QCP Solicitation FA5613-15-R-0007
PERFORMANCE MANAGEMENT PLAN (PMP)/QUALITY CONTROL PLAN (QCP)
for
Occupational Health Care (OHC) and Consultation Service of Local National Civilians at Ramstein, Spangdahlem Air Base and their Geographically Separated Units (GSUs) in Germany Please complete the following paragraphs A., 1. through 5., and B., 1. through 3, addressing the identified areas:
COMPANY _(Name and Address)__
A. PERFORMANCE MANAGEMENT PLAN (PMP)
1. How will it be ensured that contractor employees have current and valid professional certifications/licenses and health certificates etc. in accord. with para 1.5.3.2 of the PWS:
2. Address personnel and technical ability to perform at all RAB, SAB and their GSU locations in accordance with paragraph 1.11.2 of the PWS:
3. Show Manpower calculation to support (The following manning structure will be utilized) all RAB, SAB and their GSU locations:
4. How will be ensured the availablility of contractor employees for Consultations/Work center visits:
5. All services under this requirement will be performed:
[ ] as a single contractor
[ ] in a team arrangement (other than subcontractor) and please identify below the percentage and describe the tasks that will be performed by subcontractor(s) by referencing the PWS paragraph.
[ ] in a subcontracting arrangement (please identify below the percentage and describe the tasks that will be performed by subcontractor(s) by referencing the PWS paragraph).
B. QUALITY CONTROL PLAN (QCP)
1. The management structure with regard to the company’s quality control program is as follows:
2. Following procedures will be used to identify, prevent and ensure non-performance and continual repeat of defective services does not occur, in accordance with the Service Summary (SS) items:
3. Other procedures as part of the quality control program are as follows: