Aircraft Deicer Repair Performance Work Statement Draft new.docx
DOCX document 20 KB Posted
- Attached to
- Deicer Truck Repair - Spangdahlem AB Germany
- Solicitation number
- FA560625R0003
About this file
This Performance Work Statement (PWS) outlines requirements for repairing two aircraft deicing vehicles at Spangdahlem Air Base, Germany for the 52 LRS Vehicle Management flight. The work involves restoring the vehicles (registration numbers 18C00110 and 19C00058) to Original Equipment Manufacturer (OEM) status through repairs to be performed at Building 219 or surrounding compound at Spangdahlem AB.
The contractor must procure and install specified parts including Myers Pumps, Hardi pumps, heat exchanger assembly, air switches, and various other components for each vehicle. The work includes performing full function and leak checks, changing filters and fluids, and disposing of waste products. Quotes must include total price with per-vehicle breakdown, contractor ability for synchronous repairs, and estimated completion time per vehicle. The government reserves the right to issue multiple awards, and additional repairs beyond those specified require separate approval and may result in new contracts through 52 CONS. All work must comply with U.S. Air Force Technical Order 36-1-191 and Global Ground Support manufacturer maintenance manuals.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Repair two (2) Aircraft Deicing Vehicles
52 LRS/LGRV
PSC 9 BOX 2867
APO, AE 09123
BLDG. 219, Spangdahlem Air Base, Germany
5 September 2024
1. GENERAL SCOPE
The 52 LRS Vehicle Management flight intends to have two (2) aircraft deicing vehicles repaired to Original Equipment Manufacturer (OEM) status. This Performance Work Statement (PWS) will list the vehicle registration numbers and currently known needed repairs and replacement parts to bring each vehicle back into service.
2. LOCATION
All vehicle servicing is expected to be accomplished at Spangdahlem Air Base, Germany, Building 219 or surrounding compound. Work-shop space inside the building will be provided if available.
3. EXPECTED PROJECT OUTCOME
The contractor will conduct all labor, parts research, and parts procurement to repair the vehicles to fully functional OEM specifications. The contractor shall repair the aircraft deicing vehicles in accordance with the United States Air Force specifications listed below:
· Technical Order 36-1-191
· Global Ground Support Manufacturer Maintenance Technical Manuals
4. DESCRIPTION OF WORK
The contractor is expected to procure and install all known parts listed below for each registration number. This also includes any minor unlisted parts (seals, bolts, washers, screws, fuses, oils, fluids, sealants, cleaning chemicals, thread locking compounds, and lead acid batteries). The contractor will also change all air, oil, fuel filters and fluids as required. These parts must meet or exceed OEM standards.
18C00110 known needed parts:
· 1x Myers Pump I2C-20 Centrifugal Pump
· 1x Hardi 363 Anti Ice Pump
· 1x Hardi 464 Water Pump
· 1x Hardi 464 De-Icer Pump 19C00058 known needed parts:
· 1x Myers Pump I2C-20 Centrifugal Pump
· 1x Hardi 464 De-Icer Pump
· 1x Hardi 363 Anti Ice Pump
· 1x Enclosed Cab Heat Exchanger Assembly
· 1x Air Switch Air-2M, 3.4M, 4M DSL
· 1x Air Transducer 0-15 PSI
· 1x Sage Heater Function Keypad 4 Button
· 4x Solenoid, Fuel-Heater 9SOL00P
· 1x Heater Digital Screen Display, Control Box, BL-16 PIN R17197 Once all repairs are completed the contractor is expected to conduct full function and leak checks to verify all vehicle systems function properly. If additional major repairs are needed refer to Section 6. of this PWS for the additional part procurement procedures. The contractor will dispose or remove of all waste products which result from the contracted repairs. The contractor will follow applicable Vehicle Management Operating Instructions while conducting repairs with 52 LRS Vehicle Management.
5. INSTRUCTIONS FOR OFFEROR QUOTES
All quotes shall include:
· Total price for entire effort with a break-out price of service for each vehicle
· Contractor ability for synchronous vehicle repairs
· Estimated completion time per vehicle
6. APPROVAL PROCEDURE FOR ADDITIONAL REPAIRS
Once all the repairs listed in Section 4. of this PWS are completed, additional major components or servicing may be required to bring the vehicle to OEM specifications. If this occurs, the contractor will create a quote of all new work and coordinate with 52 LRS Vehicle Management for approval and funding of additional work as needed.
Additional required work does not obligate 52 LRS Vehicle Management to continue using the same contractor for repairs as Vehicle Management may need to coordinate with 52 CONS for an additional contract based on the costs for additional work.
7. AWARD
In the best interest of the Government and Spangdahlem Air Base mission, the government reserves the right to issue multiple awards to multiple contractors.