Contractor Qs about SOL.pdf

PDF 122 KB Posted

Attached to
48 SFS Ballistic Shelters and Shields Federal contract opportunity
Solicitation number
FA558723Q0047
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains vendor questions and answers regarding Solicitation Number FA558723Q0047 from the Department of the Air Force United States Air Forces in Europe - Air Forces Africa for 48 ballistic shelters and shields. The solicitation requires the delivery and installation of 48 ballistic shelters with level 5 steel and level 9 glass that are interchangeable between 50Hz and 60Hz power sources. The shelters must meet fire resistance standards of FD60 and comply with UFC 4-022-01, allowing for equivalents to NIJ ballistic resistance standards. The agency will provide equipment for unloading the shelters but installation will be the contractor's responsibility, though connection to utilities will be done by CES. Sites are prepared for installation. Single unit AC systems will be acceptable for the small shelters.

View the file

Other files for this federal contract opportunity

Other files attached to 48 SFS Ballistic Shelters and Shields, newest first.
File Type Posted
Solicitation - FA558723Q0047.pdf PDF
Quote Sheet.pdf PDF
Solicitation - FA558723Q0047.pdf PDF
SOW - RAF Lakenheath Stationary and Mobile Guard Shacks.docx DOCX document
Quote Sheet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

48 SFS Surety Ballistic Shelters

Vendor Questions

1. The ballis�c shacks/cabins will be ready to install. Could you please confirm if the unloading will be in the contractor's scope? Will the client provide a Hiab or crane at the base?

a. We will provide the unloading of the items.

2. Could you please confirm, if the hooking up of the shacks/cabins to the main power lines and other u�li�es will be in the contractor's scope as well?

a. This will not be in the contractors’ scope as this will need to be done by CES.

3. If the installa�on is in the contractor's scope, are all the sites of installa�on prepped to receive the shacks?

The shield requires level 5 steel but level 9 glass. Please can you confirm that level 5 steel and glass would be acceptable?

a. We need the glass to have the highest protec�on because structurally it will be the weakest point.

9 Level glass and 5 level steel are s�ll required.

b. The areas are prepped to receive the gate shacks.

4. The cabin specifica�on states 2# AC split system per cabin. Given the small dimensions of the cabins it won’t be possible to fit two units, also, the capacity will be significantly oversized which can cause opera�onal issues. Please confirm that 1# is acceptable?

a. One will be acceptable.

5. Could you confirm the internal and external fire ra�ngs of the cabins? And power Hz requirements. Do you need to be interchangeable between 50Hz and 60Hz to conform with both UK and American generators?

a. They need to be interchangeable as we may not know which one, we will be opera�ng on at any given �me.

6. The overall specifica�on requires the facili�es to comply with UFC 4-022-01. UFC 4-022-01 specifies UL 752 as the ballis�c resistance standard rather than NIJ, please can you confirm that where reference to NIJ is made, that a UL752 equivalent can be provided per the UFC?

a. Yes, a UL752 equivalent product can be provided.

b. The UK Ra�ng for the Guard Houses is “FD60”