1) Q: The RFQ requests a price to clean different sizes of kitchen extraction systems (small, medium & large) but I cannot see that it states what size/length of ductwork is involved in these different size options? Are you able to clarify this please?

A: Please see the below table.

Sizes (m2) Small Medium Large Extra (Extra large or scaffolding needed)

Length x Width s<2.99 3<=m<9.99 10<=l<19.99 20<=XL or Extra requirement

* Sizes are based on the "length & weight" of hoods. Ducts measurement is not a criteria for determining sizes.

2) Q: The RFQ requests costs for scaffolding in various different locations to enable us to access the ductwork/fan units but there is no info in relation to size or type of scaffolding required. Do you have any photos of where scaffolding would be required please?

A: The below asset are the ones requires scaffolding. Photos with dimensions will be provided.

ALCO Bowling Facility Kitchen

FRFD Community Activities Center, RAF Fairford RFMD MDF Dining

3) Q: I cannot see anywhere in the RFQ a cost request for the supply and installation of ductwork access panels hence can you confirm that all ductwork has the required amount of panels in place to allow full & safe access for cleaning please? It should be noted that the dismantling of kitchen extraction ductwork for cleaning should not be classed as an option as per the latest industry guidelines in

TR19.

A: We cannot confirm that all ductwork has the required amount of panels in place to allow full & safe access for cleaning since there are different method of cleaning employed. However, we can confirm that ductwork has been cleaned according to TR19 without any ductwork access problems.

4) Q: Is it possible that my surveyor could visit one of your sites to look at a few of the extraction systems?

A: Yes, we can arrange a site visits for Mildenhall and discuss other sites on Wednesday the 14th of October.

5) Q: Will Site visits be granted to ensure our very best quotes for this work, and if not, are there any photos to reference?

A: We can arrange site visit on 14th of October, Wednesday for the systems with specific requirements. If there is no site visit we can provide photos for the systems which has specific requirements.

6) Q: A quick question regarding the Scaffold that’s required at RAF Fairford. Do you want this incorporated into costs? I see on the pricing that there’s no mention.

Also, is RAF Molesworth under RAF Alconbury as before?

A: Yes, we want scaffold costs incorporated into costs. All additional effort to reach out to the ventilation system should be provided by contractor by incorporated into costs to eliminate any additional coordination with third parties and additional costs.

7) Q: PWS, page 4, item 1.1.1.12: Who will provide "schematic diagrams" for reports?

A: The contractor will provide “schematic diagrams or, as-installed drawing of the system as a part of post clean report, as a requirement of TR19, page 26, item 7.4.

8) Q: PWS, page 5, item 1.1.1.19: ECMRA has been decommissioned as of June 20, 2020. Are there other reporting procedures? Or will only WAWF be used for invoicing and reporting?

A: Only WAWF will be used for invoicing and reporting.

9) Q: PWS, page 7, item 3.1: Are there UK/US RAF bases without electrical power?

A: There is no U/US RAF bases without electrical power. The UK/US RAF Base will furnish electricity and water for the performance of services in this contract. The UK/US RAF Base is not responsible for furnishing adaptors for connecting contractor-furnished equipment to UK/US RAF Base -furnished utilities.

In buildings the Government is not able to provide electricity the Contractor uses Generator power at no additional cost to the Government.

10) Q: PWS, page 18, items 27 & 29: Are there only two (2) Hood and Duct systems at RAF Welford?

A: Yes, I confirm there are only two at RAF Welford.

11) Q: PWS, page 19, "LAKE", item 57: Listed as "twice-a-month" whereas all others are listed as "Bi-weekly". Is there a difference?

A: Yes, there is a difference.

For “twice-a-month” has 24 cleanings in a year, “bi-weekly” has 26 cleanings is a year.

12) Q: PWS, page 19, "LAKE", items 49, 50 and 51: Listed as "semi-annual" but only show one (1) cleaning per year? Are these an "annual" cleaning?

A: Sorry for confusion. These are an “annual” cleaning.

13) PWS includes "Molesworth" (page 3, item 1.0), but no H&D systems are listed in Appendix C. Are there facilities at RAF Molesworth that should be included?

A: We have one H&D system at RAF Molesworth, see PWS, page 17, asset 7.

14) In the RFI (dated July 2, 2020), the following bases were included: RAF Barford St. John, Blenheim, Brampton, and Caversfield but, they are not mentioned in the current PWS. Are these bases excluded from this proposal?

A: Yes, they are excluded from this proposal.