Blast Booth Questions Round 2.doc

DOC document 33 KB Posted

Attached to
Walk In Blast Media
Solicitation number
FA5587-09-T-0003
Issued by

About this file

Responses to Questions 2

View the file

Other files

File Type Posted
Blast Media Responses to Questions 3.doc DOC document
Blast Media Responses to Questions 3.doc DOC document
FA5587-09-T-0003 Solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blast Booth Questions Round #2

1. In your previous questions / answers # 11. You indicated the equipment would ship through Norfolk, Va – are we to quote freight to Norfolk, Va and the government will freight to RAF Lakenheath?

Answer: Yes.

2. The weight requirement for the floor is 3000 pounds – it is a raised floor without a ramp – that would mean that the parts will be forklifted to the edge of the booth but not driven in?

Answer: Depending on the height of the ledge will determine the requirement for a ramp. All equipment being positioned in the unit will be rolled in.

3. You have not specifically requested a “Breathing Air Compressor”, although breathing air is required – will you be providing appropriate breathing air or are we to use the air from the Compressor we are providing and place a CO monitoring system within the operating system?

Answer: We have a breathing air system here that will meet the requirements.

4. This will be a turn key project – we will do everything – EXCEPT – terminate the feed electrical to the Main control Panel?

Answer: Yes

5. Can we assume that our equipment / containers will be delivered and stored within close proximity of the area in which the equipment is to be installed / assembled? That the RAF site will be responsible for unloading and positioning these containers ?

Answer: Yes

6. Are progressive Project Terms of Payment available for this project or is it Net 30 after start up / training and acceptance?

Answer: Payment terms will be Net 30 after government inspection/acceptance.

7. Are there any labor restrictions for installation and assembly of this equipment, i.e. unions / Boss Contractors, etc.?

Answer: This is simply a commodity purchase and no labor restrictions will apply.

QUESTIONS RECEIVED AS A RESULT OF A SITE VISIT:

8. What type of media will be used primarily?

Answer: Plastic – Avalite Type 5

9. What is the level of abrasive reclassification?

Answer: To remove ferrous particles only

10. What is the media size requirement?

Answer: There is no requirement to maintain media size

11. Will media room/booth be connected to existing building’s fire alarm system for notificaton?

Answer: Yes

12. Does dust collection system use a bag for waste?

Answer: Yes

13. What is the wheel diameter and width of the component support trolley?

Answer: 10.5 inch diameter by 6 inch width