Attachment2.Rpr. MFH Playground Sunshade, F7020-PWS.pdf

PDF 4 MB Posted

Attached to
Sunshade Playground Repair Federal contract opportunity
Solicitation number
FA557524Q1002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This request for quotation solicits offers for repair of a playground sunshade at Moron Air Base in Spain. The contractor will provide all labor, equipment, materials, tools and other items necessary to repair an existing 290 square meter playground sunshade. The work includes supplying and installing replacement textile panels, steel brackets, stainless steel supports and springs. Quotes are due by March 31, 2024 and the period of performance is two weeks. The government will award a contract to the responsible contractor offering the lowest total price among technically acceptable quotes. The solicitation is restricted to companies authorized to perform government works in Spain.

View the file

Other files for this federal contract opportunity

Other files attached to Sunshade Playground Repair, newest first.
File Type Posted
Attachment 1.Rough Cost Estimated.xls XLS spreadsheet
RFQ-Sunshade Playground Repair.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

(PWS)

FOR

RPR. MFH PLAYGROUND SUNSHADE,

F7020

QUUG 24-1008

CIVIL ENGINEERING 496 ABS/CENP

(27-02-2024)

PERFORMANCE WORK STATEMENT (PWS)

TABLE OF CONTENTS

SECTION PAGE

1. DESCRIPTION OF SERVICES 4

2. SERVICES SUMMARY 5

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES 5

4. GENERAL INFORMATION 5/6/7/8

5. APPENDIX 9

1. DESCRIPTION OF SERVICES.

The contractor will provide all the management, material, tools, supplies, equipment, and labor needed, to accomplish the works for repair the existing MFH area playground sunshade, F7020 (Approx.: 290 M²).

1.1. Description of Work. The works includes, but is not limited to, the following items:

The Work will consist of:

- Supply/Place White Textile Panels (Approx.:60 EAs.).

- Supply/Place Green Textile Panels (Approx.:60 EAs.).

- Supply/Place Blue Textile Panels (Approx.:60 EAs.).

- Supply/Place Special Corner Textile Panels (Approx.:10 EAs.).

- Supply/Place Steel Brackets (Approx.:10 EAs.).

- Supply/Place Stainless Steel Support for Perimeter Fixation (Approx.:10 EAs.).

- Supply/Place Long Springs (Approx.:3000 EAs.).

- Supply/Place Short Springs (Approx.:3000 EAs.).

1.2. Brand Names. Names indicated for materials are for the purpose of establishing a standard selection only. Other manufacturers' materials are acceptable provided they conform to all specified requirements. Names indicated for the quality of model, give the quality standard to be achieved. Other manufacturer's materials are acceptable if it is equal to the quality and function of the suggested model. All selected material is subject to the approval of Contracting Officer and Civil Engineering.

1.3. Final Cleaning. Final cleaning of installations affected by this contract. The items mentioned and the list of main tasks do not limit in any way the responsibility of the contractor to perform all work required by the contract to provide a complete and operational installation.

1.4. Period of Performance. The period of performance for this contract is Two Weeks (14) days at the site. The contractor shall provide its execution time with their proposal.

1.5. Warranty. In addition to a standard 2 year warranty, Provide an extended 5-year warranty on the textile of the sunshade. The total warranty under this contract will be 7 years. The warranty will come into effect at the completion of the work upon acceptance. Final payment will not be issued until a warranty letter is furnished by the contractor.

1.6. Submittals. Provide submittals on all materials required to complete the work for review and approval by Civil Engineering.

2. SERVICES SUMMARY.

Performance Objective SOW Performance Threshold Perform all repair works on the sunshade in accordance with all safety standards.

Par 1.1 100%

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Use of Base Utilities: Base utilities are available to the Contactor at no additional expense to the Contractor. The following utilities shall be available from the existing Base utility connections in reasonable quantities:

a. Electricity 120/208 volts, 60 Hz.

b. Water.

All the equipment, materials and labor required to accomplish the connections to existing utilities lines shall be supplied by the Contractor, as part of this contract.

4. GENERAL INFORMATION.

4.1. Security Requirements. The contractor will request installation access through 496

ABS/CE.

4.2. Physical Security. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, property, and materials shall be secured.

4.3. Hours of Operation.

4.3.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: Monday to Friday, 08:00-17:00. The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the Government.

4.3.2. Recognized Holidays. The contractor is not required to provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.4. Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:

4.4.1. Lights shall be used only in areas where and when work is actually being performed.

4.4.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.

4.4.3. Water faucets or valves shall be turned off after the required use has been accomplished.

4.4.4. Government telephones shall be used only for official government business.

4.5. Records. The contractor shall be responsible for creating, maintaining, and disposing of only those governments required records that are specifically cited in this SOW.

4.6. Environmental Controls:

4.6.1. Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the Contracting Officer pursuant to notice requirements and negotiate a modification to the contract.

4.6.2. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to Moron AB Fire Dept at 117. The liability for the spill or release of such substances rests solely with the contractor and its agent.

4.6.3. Material Storage and Use. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.

4.7. Government Observations: Government personnel, other than contracting officers (Cos) and quality assurance personnel (QAPs), may from time-to-time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.

4.8. Safety Requirements. In performing work under this contract, the contractor shall:

4.8.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

4.8.2. Take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes.

4.8.3. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.

4.8.4. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.

4.8.5. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.

4.8.6. Record and report promptly (within one hour) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.

4.8.7. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.

4.8.8. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.

4.8.9. Include a clause in each applicable subcontract requiring the subcontractor’s cooperation and assistance in accident reporting and investigation.

4.9. Special Qualifications. The Contractor shall submit any commercial certifications and a reference of past performance on similar works performance to the existing as means to verify experience in this work field.

4.10. Continuation of Essential DOD Contractor Services during Crisis IAW DoDI 3020.37.

IAW AFI 63-124, para 2.7.1, and DODI 3020.37 this requirement is not considered mission essential.

4.11. Contract Restriction: In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Office of Defense Cooperation Policy Directive 400- 5 "(4) Spanish material, labor, and equipment must be used if permitted by the requirements of the contract specifications."

5. APPENDIXES:

A. Location (F7020 / 7022):

B. Pictures (Original / Actual):

C. Dimensions Floor Plan (1), (2):

D. Reference Floor Plan (To repair):

E. Technical Data’s:

A. Location (F7020 / 7022):

B. Pictures (Original / Actual):

Original

Original

Actual

Actual

C. Dimension Floor Plan:

(1)

(2)

D. Reference Floor Plan (To repair):

E. Technical Data’s:

PERFORMANCE WORK STATEMENT (PWS) TABLE OF CONTENTS
1.2. Brand Names. Names indicated for materials are for the purpose of establishing a standard selection only. Other manufacturers' materials are acceptable provided they conform to all specified requirements. Names indicated for the quality of model,...
1.3. Final Cleaning. Final cleaning of installations affected by this contract. The items mentioned and the list of main tasks do not limit in any way the responsibility of the contractor to perform all work required by the contract to provide a compl...
2. SERVICES SUMMARY.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
4. GENERAL INFORMATION.
4.3. Hours of Operation.
4.6. Environmental Controls:

5. APPENDIXES:

File details come from the government source that posted it. Updated .