This document is a request for quotation for repair work on a playground sunshade at Moron Air Base in Spain. The contractor will provide all labor, equipment, materials, tools, parts, shipping, and installation to deliver textile sunshade panels and stainless steel hardware as specified in Attachment 1. The response due date is 31 March 2024. The North American Industry Classification System code for this project is 313310 and the Product Service Code is 8305. Evaluation will be based on lowest price technically acceptable. The contractor must have active SAM registration and quote on all line items to be considered. Delivery is FOB Destination. The contract will be awarded to the responsible contractor providing the lowest overall price for all items.
The document includes standard contract clauses for electronic submission of payment requests, prohibition on contracting for certain telecommunications equipment, and availability of funds. Attachments provide a rough cost estimate and performance work statement for the playground sunshade repair work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment2.Rpr. MFH Playground Sunshade, F7020-PWS.pdf | ||
| RFQ-Sunshade Playground Repair.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR
| ROUGH COST ESTIMATED | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACTOR | MORON AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR. MFH PLAYGROUND SUNSHADE, F7020. | ||||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| TEXTILE SUNSHADE WORKS. | ||||||||||
| TRABAJOS DE CUBIERTA TEXTIL. | ||||||||||
| 1 | White Textile Panels. | |||||||||
| Paneles Textiles Blancos. | M² | |||||||||
| 2 | Green Textile Panels. | |||||||||
| Paneles Textiles Verdes. | M² | |||||||||
| 3 | Blue Textile Panels. | |||||||||
| Paneles Textiles Azul. | M² | |||||||||
| 4 | Special Corner Textile Panels. | |||||||||
| Paneles Textiles Especiales Esquinas. | M² | |||||||||
| 5 | Stainless Steel Hardware. | |||||||||
| Accesorios de Acero Inoxidable. | LS | |||||||||
| TOTAL TEXTILE SUNSHADE WORKS. | ||||||||||
| TOTAL TRABAJOS DE CUBIERTA TEXTIL. | ||||||||||
| TOTAL MATERIAL COSTS | ||||||||||
| TOTAL LABOR COSTS | ||||||||||
| TOTAL OTHER DIRECT COSTS | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Regular"AF Form 3052 (Computer Generated)&C&"Times New Roman,Bold"FOR OFFICIAL USE ONLY&R&"Times New Roman,Regular"Page &P of &N