About this file

This document is a request for quotation for repair work on a playground sunshade at Moron Air Base in Spain. The contractor will provide all labor, equipment, materials, tools, parts, shipping, and installation to deliver textile sunshade panels and stainless steel hardware as specified in Attachment 1. The response due date is 31 March 2024. The North American Industry Classification System code for this project is 313310 and the Product Service Code is 8305. Evaluation will be based on lowest price technically acceptable. The contractor must have active SAM registration and quote on all line items to be considered. Delivery is FOB Destination. The contract will be awarded to the responsible contractor providing the lowest overall price for all items.

The document includes standard contract clauses for electronic submission of payment requests, prohibition on contracting for certain telecommunications equipment, and availability of funds. Attachments provide a rough cost estimate and performance work statement for the playground sunshade repair work.

View the file

Other files for this federal contract opportunity

Other files attached to Sunshade Playground Repair, newest first.
File Type Posted
Attachment2.Rpr. MFH Playground Sunshade, F7020-PWS.pdf PDF
RFQ-Sunshade Playground Repair.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR

ROUGH COST ESTIMATED
CONTRACTORADDRESS
CONTRACTORMORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR. MFH PLAYGROUND SUNSHADE, F7020.
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
TEXTILE SUNSHADE WORKS.
TRABAJOS DE CUBIERTA TEXTIL.
1White Textile Panels.
Paneles Textiles Blancos.M²
2Green Textile Panels.
Paneles Textiles Verdes.M²
3Blue Textile Panels.
Paneles Textiles Azul.M²
4Special Corner Textile Panels.
Paneles Textiles Especiales Esquinas.M²
5Stainless Steel Hardware.
Accesorios de Acero Inoxidable.LS
TOTAL TEXTILE SUNSHADE WORKS.
TOTAL TRABAJOS DE CUBIERTA TEXTIL.
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
TOTAL PROJECT US$