This document contains questions and answers related to solicitation number FA557521B0002 for the replacement of two military family housing units at a base in Spain. The solicitation involves a firm-fixed price construction contract with an estimated value between $1,000,000 and $5,000,000. Key work requirements include demolition of existing structures and utilities, relocation of landscaping, and construction of new housing units. Bidders must attend a pre-proposal site visit on May 20, 2021 and submit all questions by May 26, 2021, with bids due by June 9, 2021. The solicitation is designated for the Department of the Air Force United States Air Forces in Europe - Air Forces Africa and is subject to the Agreement of Defense Cooperation between the U.S. and Spain, requiring the use of Spanish materials, labor, and equipment where feasible.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Miltary Family Housing Units, newest first.
File Type Posted
Solicitation - FA557521B00020001.pdf PDF
FA557521B00020001 - Amendment 1 QandA SF 30.pdf PDF
Solicitation - FA557521B0002.pdf PDF
Attach. 3 - Drawings.pdf PDF
Attach. 4 - Schedule of Material Submittals.xlsx XLSX spreadsheet
Attach. 2 - Especificaciones (Espanol).pdf PDF
Attach. 5 - Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attach. 1 - Specifications (English).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5575-21-B-0002 - QUUG 06-4001 Replace MFH Housing Units - Questions and Answers

Bids Due: 9 June 2021 at 10:00am local time

1. On the CD102 drawing appears in the demolition reference notes, note U05 that refers to the demolition of an existing sanitation well, but in the attached document listing the items to be measured, Attach. 5 - Construction Cost Estimate Breakdown, that unit to be measured does not appear. Is well demolition included in the demolition price of the sanitation pipe or should a new item be included?

Answer:

The Government contemplates award of a Firm –fixed Price contract resulting from this solicitation. The actual extent of work requirements will be governed by the specifications and drawings. Throughout the solicitation, it says bids will be based on, and work will be done, in accordance with the “Specifications and Drawings.” The cost estimate is provided as a courtesy and is not a governing document.

2. The demolition note U13 appears on the CD102 drawing, but the demolition length is not indicated in either house. Does the demolition of the stretch between streetlight and street lamppost comprising access to housing?

Answer:

Note U13 in drawing CD102 points to the underground electrical line sections below access driveway to both Housing units that are repaired and widened under this project. Length to be cut, removed and reinstalled as indicated in the note is up to the civil works required for this renovation and is to be measured on drawings by the bidding Contractor.

3. There is no measurement for the electrical line demolition, do we create one or include it in another line item as electricity?

Answer:

The Government contemplates award of a Firm –fixed Price contract resulting from this solicitation. The actual extent of work requirements will be governed by the specifications and drawings. Throughout the solicitation, it says bids will be based on, and work will be done, in accordance with the “Specifications and Drawings.” The cost estimate is provided as a courtesy and is not a governing document.

4. On the L101 drawing there are plants to be relocated that do not appear on attach 5. These units are Fresno, cypress and medlar. Do we create new line items or what do we do?

Answer:

The Government contemplates award of a Firm –fixed Price contract resulting from this solicitation. The actual extent of work requirements will be governed by the specifications and drawings. Throughout the solicitation, it says bids will be based on, and work will be done, in

5. The curbs do not appear on attach 5. Do we create a new line item or put the quantity in the ruler unit?

solicitation. The actual extent of work requirements will be governed by the specifications and drawings. Throughout the solicitation, it says bids will be based on, and work will be done, in

6. You do not specify what type of conductions and cables go in the network that joins the outdoor

LED beacons in the EL101 and EL151 drawings. What type are they?

Duct bank for main and lighting electrical line is shown in drawing E501, detail E05. Conduits and cables for underground distribution are specified in section 33 71 02 – Underground

Electrical Distribution of the specifications. Please review carefully all projects documents to make sure that an item is not specified.

7. The type of telecommunications manhole is not indicated. What type is it?

Communications manholes are specified in section 33 82 00 – Telecommunications Outside Plant of the specifications. Please review carefully all projects documents to make sure that an item is not indicated.

8. In the C102 drawing, it show connecting the telecommunications trench that leaves the 2 houses, with each of the trench brings 2 tubes, in a single ditch, that ditch is 4 conduits of 2 conduits 2?

No details can be found.

Dwg T501, detail 02 show the telecommunications lines ductbank detail, with 2 110mm diam conduits. All communication ductbanks are to be this type, where the conduits provide enough cross-sectional area to allow for the telecommunication cables required in the project.

9. There are differences in supply and irrigation in drawings C102, PP101 and PP151. In the last two there is a potable water pipe and an irrigation pipe that enters each house, and in the 102 comes 1 potable water pipe and another fire prevention pipe. Which one's okay?

There are three lines: potable, non-potable and fire suppression. Fire suppression is shown in the

FP drawings.

10. In the PP101 and PP151 drawings it appears in a note 2 units of hose and cabinet faucets existing to be reinstalled for each house, and in the C102 drawing these units appear indicating that they are new. Which one's okay?

PP101 and PP105 drawings show the correct statement.

11. The situation of the registration manhole projected in the house 658 does not coincide in the location, according to drawings PS151 and C102. Indicate which is correct, because depending on this the hydraulic standard varies and the length of the tube as well.

Drawing PS151 shows the exact location of the cleanout handhole.

12. The PP101 and PP151 drawings we see that HDPE P100 pipe is of 40mm, and the measurement lines do not appear. Shall we create new line items?

solicitation. The actual extent of work requirements will be governed by the specifications and drawings. Throughout the solicitation, it says bids will be based on, and work will be done, in

13. The FP 101 and FP151 drawings show HDPE PE100-3 pipe, but the measurement lines do not appear. Do we create new line items?

solicitation. The actual extent of work requirements will be governed by the specifications and drawings. Throughout the solicitation, it says bids will be based on, and work will be done, in

14. Vertical and horizontal signaling appears on the C502 drawing, and there are no measurement lines. Do we create new line items?

solicitation. The actual extent of work requirements will be governed by the specifications and drawings. Throughout the solicitation, it says bids will be based on, and work will be done, in